Georgia · Division 03
Concrete projects in Georgia
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Georgia projects, 30 need this division and 5 are still in planning or permitting.
As of 2026-11-03, 30 of the 300 highest-scored Georgia projects in the SpecIndex index need concrete, and 5 of those are still in planning or permitting.
Search the full index →- Eo 14398 - Cdc Emergency Mass Notification System (Emns)under construction
· $10M-$50M
- Atlanta Ga Richard B Russell Ch Water Intrusion Repairunder construction
· $1M-$10M
- Db Roof Cover Replacement Harold L Murphy Fb 600 East First St Rome Georgia 30161under construction
· $1M-$10M
- This Task Order Is To Design/Build Advanced Training And Operations Complex (Atoc) At Ft Benning, Georgiaunder construction
· $10M-$50M
- Ceremonial Courtroom Suite 2306 Lobby Improvements Richard B. Russell Fb Atlanta, Ga 30303under construction
· Under $1M
- Design Build Services For Ft. Benning Improvements Projects In Support Of Dhs/Ice/Oafm.under construction
· $10M-$50M
- Flood Mitigation Installation For Building Bg0185, Bg0186 & Bg0187 The Kingston Commons Dormitories.under construction
· $1M-$10M
- Atf Warehouse And Simulator Building - The Atf Complex Fy26 Construction Project Involves Construction Of Two New Pre-Enunder construction
· $1M-$10M
- Design-Bid-Build For Construction Of Chamber 500 At Tuttle Federal Building In Atlanta, Georgia.under construction
· $1M-$10M
- Design & Construction Funding For Atlanta International Airport Atct (Atl) Fire Alarm Replacement Project Project.under construction
· $1M-$10M
- The Contractor Shall Provide Third Party Contracting (Tpc) Services In Support Of The Durban Lease-Fit-Out Projectcompleted
· Under $1M
- Repair/Replace Boiler Condensate Linesunder construction
· Under $1M
- Construct A Sof Military Working Dog (Mwd) Kennel (Approximately 11,000 Sf) At Hunter Army Airfield, Ga To Include Kenneunder construction
· $10M-$50M
- Cooling Tower Replacementunder construction
· $1M-$10M
- Replace Downtown Elevators Dd Ph Iiunder construction
· $1M-$10M
- Commercial permit — 2110 Medley Boulevardpermitting
Johns Creek · $100M+
- New World Screwworm Canine Training - Construction Of Livestock Holding Pens And Training Chutesunder construction
· Under $1M
- P695 Will Consist Of Electrical Distribution And Transmission Equipment Replacement Including Shore Power Substation Repunder construction
· $50M-$100M
- View specs →W912HN25BA007 (W912HN25B4002) Renovate Bldg. 59D Robins AFB, GAunder construction
· $10M-$50M
- Renovate Urgent Careunder construction
· $1M-$10M
- Savannah Port Logistics Centerunder construction
Savannah · $100M+
- Commercial permit — 1100 Medley Boulevardpermitting
Johns Creek · $100M+
- Burn Cell Tear Out And Build In For The Atf National Academyunder construction
· Under $1M
- Commercial permit — 7199 Medley Crossingpermitting
Johns Creek · $100M+
- Atlanta Mlk Federal Building Ground Floor Alterations Martin Luther King, Jr. Fb Atlanta, Ga 30303under construction
Atlanta · Under $1M
- Burn Cell Tear Out And Build In For The Atf National Academy. Sabt Classesplanning
· Under $1M
- Burn Cell Tear Out And Build In For The Atf National Academy. Sabt Classesplanning
Brunswick · Under $1M
- Gaoa Lake Winfield Scott Campground Reconstructionunder construction
Suches · $1M-$10M
- 509-26-600 Emergency Flood Restoration 3A And 4Aunder construction
· $1M-$10M
- Tower Simulator System (Tss) Standalone Simulation Systemunder construction
· $1M-$10M