GU · Division 03

Concrete projects in GU

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 297 highest-priority scored GU projects, 122 need this division and 2 are still in planning or permitting.

As of 2026-11-03, 122 of the 297 highest-scored GU projects in the SpecIndex index need concrete, and 2 of those are still in planning or permitting.

Search the full index →

Showing 1–50 of 122 · page 1 of 3

  • Replace Existing Primary And Secondary Overhead Electrical Distribution Feeders With New Underground Circuit Conductors under construction

    · $100M+

  • Contract No. N62742-23-D-1325 /Task Order No. N6274226F9904, Fy26 Mcon P-104 Water Wells, Us Navsuppact Andersen, Joint under construction

    · $10M-$50M

  • Fy21 Mcon Project P-649 Guam Joint Communications Upgrade Marine Corps Base Camp Blaz, Guamunder construction

    · $100M+

  • Rfp N62742-25-R-1315, Fy26 Mcon Project P-320 Pdi: Waste Transfer Facility, Us Navsuppact Mcb Guam Finegayan, Guamunder construction

    · $10M-$50M

  • Won 1858731 Milcon P-819 Inner Apra Harbor Resiliency Upgrades Polaris Point, Nbgunder construction

    · $50M-$100M

  • Fy25 Mcon P-2301 Hsc-25 Complex At The Andersen Air Force Base, Guam, Mariana Islandsunder construction

    · $100M+

  • Fy25 Mcon P-693 Pdi: Guam Defense System Command Center, Joint Region Marianas, Guamunder construction

    · $100M+

  • Fy 25 Mda 694-1 Pdi: Guam Defense System, Enhanced Integrated Air And Missile Defense (Eiamd), Ph 1under construction

    · $100M+

  • Rfp N62742-25-R-1303, Navfac Work Order Number 1737021, Fy24 Mcon Project P-614 Joint Consolidated Communications Centerunder construction

    · $100M+

  • Contract N62742-21-D-1328 / To N62742-26-F-9900, Jfy22 J-402 Outdoor Playing Fields And Jfy09 J-017-V Marine Corps Baseunder construction

    · $10M-$50M

  • Fy23, P325, 9Th Esb Equipment And Maintenance Facility, Constructunder construction

    · $100M+

  • Fy24 P-541 Missile Integration Test Facilityunder construction

    · $100M+

  • Fy 25 Mda 694-2 Pdi: Guam Defense System, Enhanced Integrated Air And Missile Defense (Eiamd), Ph1under construction

    · $50M-$100M

  • Igf::Ot::Igf Jfy014 J-755, Urban Combat Training, Andersen Air Force Base, Joint Region Marianas, Guamcompleted

    · $100M+

  • Igf::Ot::Igf Won 133027 Fy14 Mcaf P-3027completed

    · $100M+

  • Jfy18 Project J-609 Apra Embarkation Facility, Naval Base Guam, Joint Region Marianas, Guamunder construction

    · $100M+

  • Jfy22 J-014 Physical Training Complex, Camp Blaz, Mcb, Guamunder construction

    · $100M+

  • P-696 Ercip Inner Apra Harbor Resiliency Upgrades And P-806 Ercip Generation, Controls & Feeder Upgrades Joint Region Maunder construction

    · $50M-$100M

  • Won 1674960, J-318 Public Works/Maintenance Shops And Won 1674961, J-323 Base Motor Pool, U.S. Navsuppact, Mcb Guamunder construction

    · $100M+

  • Won 1735860 P-927, Radio Barrigada, Gucompleted

    · $100M+

  • Won 1737347, Fy24 P-316, Pacific Deterrence Initiative: Artillery Battery Facilities, Us Navsuppact Marine Corps Base, Gunder construction

    · $50M-$100M

  • Apsi Standoff Weapons Complex, Aafbcompleted

    · $10M-$50M

  • Design-Build Multiple Award Construction Contract (Dbmacc) Primarily For U.S. Military Construction Projects In Guam Andunder construction

    · $10M-$50M

  • Fy19 Mcon Project P-290 Earth Covered Magazines, Andersen Air Force Base, Guamcompleted

    · $50M-$100M

  • Fy20 Mcon P-491 Eod Compound Facilitiescompleted

    · $50M-$100M

  • Fy22, Meb Enablers, Naval Support Activity, Mcb Guamcompleted

    · $50M-$100M

  • Fy 22 P-305 4Th Marine Regiment Facilities, Us Naval Support Activity, Mcb, Guamcompleted

    · $50M-$100M

  • Fy22 P-306 Combat Logistics Battalion-4completed

    · $50M-$100M

  • Fy24, P-415 - Child Development Center, Construction Award (Re-Isunder construction

    · $50M-$100M

  • Fy24, P-760 Pdi: Training Center, Mcb,under construction

    · $50M-$100M

  • J-313 Corrosion Control Ground Phase 1, Naval Support Activity Macompleted

    · $50M-$100M

  • Jfy21 J-015 Enlisted Dining Facility, U.S. Navsuppact, Marine Corps Base Guamcompleted

    · $50M-$100M

  • Jfy23 Goj Project J-321, Corrosion Control Grnd Ph Ii, Us Navsuppact Mcb Guam, Camp Blaz, Guamunder construction

    · $50M-$100M

  • N62742-21-C-1335, Fy21 Mcon P-312 Distribution Warehouse And P-804 Central Issue Facility, Joint Region Marianas, Guamcompleted

    · $50M-$100M

  • Navfac Work Order Number 1297284 P-519 X-Ray Wharf Improvements (Berth 2) Naval Base Guamcompleted

    · $50M-$100M

  • P-280 Aviation Admin Bldgcompleted

    · $50M-$100M

  • X001 Seed Project: Jfy18 Project J-011 Base Administrative Buildcompleted

    · $50M-$100M

  • Base Itemcompleted

    · $10M-$50M

  • Construction Of Low-Rise Religious Ministry Services Building At Marine Corps Base Guam For Religious Accommodation, Carunder construction

    · $10M-$50M

  • Fy19 J-032-I Mcb Camp Blaz Parking, Us Navsuppact Mcb Guamcompleted

    · $10M-$50M

  • Fy21 Mcon P-317 Combined Eod Compound, Us Navsuppact Marine Corps Base Guam, Finegayan, Guamcompleted

    · $10M-$50M

  • Fy22 Mcon P-307 Consolidated Armory, Marine Corps Base, Guamcompleted

    · $10M-$50M

  • Fy22 Mcon Project P-326, Principal End Item (Pei) Warehouse, U.S. Naval Support Activity (Navsuppact), Marine Corps Basecompleted

    · $10M-$50M

  • Fy22 Milcon Project Ajjy163000 Apsi - Airfield Damage Repair Warehouse Andersen Air Force Base, Guamcompleted

    · $10M-$50M

  • Fy22 Milon Project P-052 National Guard Readiness Center, Barrigada, Guamcompleted

    · $10M-$50M

  • Fy23 Mcon P-324 9Th Esb Hq, Mcb Guamunder construction

    · $10M-$50M

  • Fy23 P-187 Brown Tree Snake (Bts) Exclusion Barrier South, Us Navsuppact Mcb Guamcompleted

    · $10M-$50M

  • Igf::Ot::Igf Fy16 Mcaf Project P-3028/Ajjy133028 Low Observable/Corrosion Control/Composite Repair Shop, Joint Region Macompleted

    · $10M-$50M

  • Igf::Ot::Igf N40192-10-D-2804 Task Order 0020, Pol Fuel Systems Hardened Structures - Project Is Intended To Provide Forcompleted

    · $10M-$50M

  • J017-I/Iii Utilities&Site Improvements Phase Ii, Area Distribution Nodes&Site Telecom Cabling, Us Navsuppact Marine Corpcompleted

    · $10M-$50M