Indiana · Division 03
Concrete projects in Indiana
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Indiana projects, 55 need this division and 1 are still in planning or permitting.
As of 2026-11-03, 55 of the 300 highest-scored Indiana projects in the SpecIndex index need concrete, and 1 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 55 · page 1 of 2
- Construction Contract For In Ang Small Indoor Arms Rangeplanning
· $10M-$50M
- Fueling System Repairs Locate At Camp Atterbury Indiana.under construction
· $1M-$10M
- Shelter, And Foundation Replacement @ South Bend (Sbn), In (Loc)completed
· Under $1M
- Clin 0001under construction
· $100M+
- Hof Birdseye Trail Maintenanceunder construction
· Under $1M
- Indiana Harbor Dredging At The Indiana Harbor Canalunder construction
· $1M-$10M
- Construction Services For Project In Np Indu Pms(1), Pavement Preservation Indiana Dunes. This Work Consists Of Crack Secompleted
· $1M-$10M
- Construct Logistics Readiness Complex (Lrc) On Grissom Air Reserve Base, Indiana.under construction
· $10M-$50M
- Indiana Harbor And Canal Confined Disposal Facility Dike Expansioncompleted
· $10M-$50M
- Indianapolis Vamc Ehrm Infrastructure Upgrades Constructionunder construction
· $10M-$50M
- Project Number 817Cm3025 New Land Expansion At Marion National Cemeteryunder construction
· $10M-$50M
- Project Title: Michigan City Breakwater Repairs Project Location: Michigan City, Inunder construction
· Under $1M
- The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted
· $10M-$50M
- Construction Fort Wayne Specialty Care Buildingunder construction
· $10M-$50M
- Expand Specialty Care - 583-331 583-Z87000completed
· $10M-$50M
- Gary Airport Storm And Sanitary Sewer Improvements - Gary, Lake County, Indianaunder construction
· $1M-$10M
- Indianapolis, In - Roof Replacement @ Tdwr Building In Indianapolis, Ini In Accordance With The Sow, Specs And Drawings.under construction
· Under $1M
- Indu 318674 - Stabilization And Restoration Of Historic Buildings For Adaptive Reuse, Indiana Dunes National Lakeshorecompleted
· $10M-$50M
- Lake George Canal Middle Section Restoration - $14,747,222.00completed
· $10M-$50M
- Mtef/Ssef Building Construction.under construction
· $10M-$50M
- P447 Explosive Railcar Holding Yardcompleted
· $10M-$50M
- Renovate Building 16 (610-20-103) - Marion, In Vamcunder construction
· $10M-$50M
- This Is For The Construction Of A New Indoor Small Arms Range (Isar) Located At Grissom Air Reserve Base, Indiana.under construction
· $10M-$50M
- Ehrm Infrastructure Upgrade Ft Waynecompleted
· $10M-$50M
- Non-Personal Services To Provide Construction At The Weapons Release Aircraft Maintenance Hangar At The 122D Fighter Wincompleted
· $1M-$10M
- Qhy, Qtz, Ind, Quz Bundle - Building Refurbishments In Accordance With The Sow, Specifications And Drawings.completed
· $1M-$10M
- Rehabilitate The Lincoln Memorial Bridge - Design Build Program Of Requirementsunder construction
· $1M-$10M
- (Const) Renovate Basement Building 1 - Nihcs - Fort Wayne Campusunder construction
· $1M-$10M
- Construction Contract No. W912P624C0018 Award Of Solicitation No. W912P624B0009 Town Of Hebron Water Main Replacement, Hcompleted
· $1M-$10M
- Construction Of Upper Wabash Proj. Officcompleted
· $1M-$10M
- Design Build Project To Construct New Lunch And Locker At Building 101 For Caaaunder construction
· $1M-$10M
- Gary Sanitary District 27Th & Chase Street Force Main Replacement, Phase 2completed
· $1M-$10M
- Ihc Dredging - Base Itemscompleted
· $1M-$10M
- Lafayette, In - Refurbish 67 X 14 Wood Antenna Platform & Evaluate Structural Integrity Project (Laf) In Accordance Withcompleted
· Under $1M
- Markland R45 Repaircompleted
· $1M-$10M
- Michigan City Breakwater Repair Projectunder construction
· $1M-$10M
- Newburg Electrical Repair - Baseunder construction
· $1M-$10M
- Task Order For Electrical Rehabilitation At Jt Myers Locks And Damcompleted
· $1M-$10M
- 88Th Rd Sgt. James W. Harlan Usarc Evansville, Il Storage, Electrical, And Fire Alarm Upgradescompleted
· $1M-$10M
- Base Bid And Track Pov Lotcompleted
· $1M-$10M
- Construct Contingency Water Supply - 583-17-102completed
· $1M-$10M
- Construction Task Order From Idiq W912Qr21D0058 For The Construction Of Edtr At Nswc, Crane, In.completed
· $1M-$10M
- Project Np Indu 0945(1): The Project Consists Of Removal And Replacement Of Curb And Gutter, Removal And Replacement Of under construction
· $1M-$10M
- Roof Replacement Of Bldg. 198completed
· $1M-$10M
- Stormwater Improvements - Section 219, Hammond, Lake County, Indiana (Usace Acquisition)completed
· $1M-$10M
- Task Order Award For Nswc Static Roo Taz At The Naval Support Activity Crane Indianacompleted
· $1M-$10M
- Task Order For Caaa Construct New Lunch And Locker Facility At The Naval Support Activity Crane Indianacompleted
· $1M-$10M
- Award - Design-Build And Construction Of A New Storage Building At The Zid Artcc Indianapolis Incompleted
· Under $1M
- Brookville Retreat Rip Rap - Basecompleted
· $1M-$10M
- Burns Harbor Dredgingcompleted
· $1M-$10M