Kentucky · Division 03

Concrete projects in Kentucky

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Kentucky projects, 61 need this division and 0 are still in planning or permitting.

As of 2026-11-03, 61 of the 300 highest-scored Kentucky projects in the SpecIndex index need concrete, and 0 of those are still in planning or permitting.

Search the full index →

Showing 1–50 of 61 · page 1 of 2

  • Dbb Construction Of United States Department Of Agriculture (Usda) Forage Animal Production Research Unit (Fapru) Locateunder construction

    · $50M-$100M

  • Repair Flood Damage Gene Snyder Usdc Ky0045Zz Louisville, Ky 40202under construction

    · $1M-$10M

  • Rpt Fy26-009038 Ky Doi Matoc Red River Gorge Suspension Bridge Rehabilitationunder construction

    · Under $1M

  • Contractor Is To Provide All Construction Services To Complete The Construct Replacement Clc - Complex Care Minor Construnder construction

    · $10M-$50M

  • Edward Branch Canoe Launch Trail And Parking Area. Rpt Fy26-017391under construction

    · Under $1M

  • Mill Springs Mill Rehab Projectunder construction

    · Under $1M

  • Rough River Cutoff Wallunder construction

    · $100M+

  • Construction Of Downstream Monoliths For The Kentucky Lock, Grand Rivers, Kentuckyunder construction

    · $100M+

  • Construction To Add Emergency Power To Spsunder construction

    · Under $1M

  • Install Ahu Control Valves Ky0042Zz Us District Court 101 Barr Street Lexington, Ky 40507under construction

    · Under $1M

  • Replace Boiler System Ky0086Zz Mazzoli Federal Building 600 Martin Luther King Louisville Ky 40202under construction

    · Under $1M

  • Award Of The Base Plus All Options For The Construction Of Van Voorhis Elementary School - $58,989,000.00.completed

    · $50M-$100M

  • Refinish Connecting Corridors At Lexington Va Health Care System, Franklin R. Sousley Campus.under construction

    · $1M-$10M

  • Construction Award For Ft. Campbell Vehicle Maintenance Shop Located At Ft. Campbell, Ky, Awarded To Walsh Federal, Llc.completed

    · $10M-$50M

  • Construction Of Child Development Center At Fort Knox Kentuckyunder construction

    · $10M-$50M

  • Construction Of Digital Air/ Ground Integration Range, Ft. Knox, Ky.completed

    · $10M-$50M

  • Contractor Is To Provide All Construction Services To Complete The Electronic Health Record Modernization Infrastructureunder construction

    · $10M-$50M

  • Project Np Maca 12(1), 908(1): The Project Consists Of Pavement Reconstruction Of The Hotel Parking Area And Adjacent Rounder construction

    · $10M-$50M

  • Town Of Martin Phase Ii Redevelopment Site, Martin, Kycompleted

    · $10M-$50M

  • Base Automated Record Fire Plus Rangeunder construction

    · $1M-$10M

  • Fabrication And Delivery Of Liquid Oxygen Facilitycompleted

    · $10M-$50M

  • Renovation Of Building 3071 Child Development Center At Fort Campbell, Kentucky.completed

    · $10M-$50M

  • Replace Obsolete Overhead Paging System At Lexington Va Health Care System.under construction

    · $1M-$10M

  • 621802: Gaoa 0802 London District Design/Build Contractor Stipendunder construction

    · $10M-$50M

  • Construction Repair Portland Canal Wall, Mcalpine Locks And Dam.completed

    · $1M-$10M

  • Johnson County Phase Iicompleted

    · $10M-$50M

  • 81St Readiness Division, Neff Staging Fort Jackson, Columbia, South Carolinacompleted

    · $1M-$10M

  • Baseball / Softball Fields Rehab At Fort Campbellcompleted

    · $1M-$10M

  • Buckhorn Boat Ramp Reconstruction Base And Optionunder construction

    · $1M-$10M

  • Construction Of Littcarr Campgrpoundcompleted

    · $1M-$10M

  • Dewater Lock Chambercompleted

    · $1M-$10M

  • Fca Deficienciescompleted

    · $1M-$10M

  • Fort Knox Toilet/Shower Facility Project - Base And Option Awardcompleted

    · $1M-$10M

  • Gro Cable Replacement, Mar Mcc Replacement And Bel Mcc Replacements.completed

    · $1M-$10M

  • Ky Np Maca 16(1), 200(1): The Project Consists Of Reconfiguration Of The Intersection Of Cave City Road And Frozen Niagaunder construction

    · $1M-$10M

  • Loyall Ponding Phase 2completed

    · $1M-$10M

  • Markland L&D Electrical Improvementscompleted

    · $1M-$10M

  • (Matoc To) Ftc Cso Roof And Rtu Replacementunder construction

    · $1M-$10M

  • New Construction Contract For Vehicle Maintenance Shop, Parking And Storage At Fort Campbell, Kentucky.completed

    · $1M-$10M

  • Remove And Repair Miter Gates At Green Rivercompleted

    · $1M-$10M

  • Repair Sabre Heliportcompleted

    · $1M-$10M

  • Repairs To The Roof Valleys Of Small Arms Warehouses 202 And 203 As Well Associated Roof Drainage Improvements/Repairs.completed

    · $1M-$10M

  • Replace Three Buec Towers At The Louisville (Lou), Ky Buec In Accordance With The Sow And Drawings.under construction

    · Under $1M

  • This Requirement Is For The Minor Construction Services To Replace The Road Culvert On Route 114 In Support Of Blue Grasunder construction

    · Under $1M

  • Army Reserve Center Of The Future Concept Developmentcompleted

    · $1M-$10M

  • Base - Adapt Wetland Detention Basincompleted

    · $1M-$10M

  • Carr Creek Wwtp Lift Stationcompleted

    · $1M-$10M

  • City Of Cumberland - Looney Creek Channel Widening Projectcompleted

    · $1M-$10M

  • Ct Scanner Upgradecompleted

    · Under $1M

  • Ecms Phase Viicompleted

    · $1M-$10M