Massachusetts · Division 07
Thermal and Moisture Protection projects in Massachusetts
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 243 highest-priority scored Massachusetts projects, 235 need this division and 62 are still in planning or permitting.
Search the full index →- View specs →Bedford Ehrm Upgrade Dbb, Implementation Of Executive Order 14398under construction
· $37.1M
- View specs →Cape Cod National Seashore - Nellie Road Combined Septicunder construction
· $343,419
- View specs →Roof Replacement At The Fmh, Ssc, Located Falmouth, Ma. Replacement Will Constitute Installation Of Approximately 7500 Sunder construction
· $1.5M
- View specs →Emergency Hvac Replacementunder construction
· $34,653
- View specs →Seed Project Under A Construction Multiple-Award Task Order Contract (Matoc) For The Renovation Of A Helpdesk Area At Thunder construction
· $1.4M
- View specs →Paving Repairs, Bourne Bridge, Bourne, Maunder construction
· $2.1M
- View specs →Ratification Of Unauthorized Commitmentcompleted
· $32,001
- View specs →Cape Cod National Seashore Marconi Site Vault Toiletunder construction
· $210,088
- View specs →Eo14398 - Concrete Foundation - Maunder construction
· $81,500
- View specs →Replace Cracked Cab Window, Air Traffic Control Tower (Atct), 566 Washington St., Norwood Memorial Airport (Owd), Norwoounder construction
· $54,893
- View specs →Fort Devens Rappel Tower Demolitioncompleted
· $81,880
- View specs →Replace Four Passenger Platforms And A Wood Fence And Repair Track At Lowell National Historical Park.under construction
· $1.8M
- View specs →Maintenance Dredging, Wareham Harbor, Wareham, Massachusettsunder construction
· $2.1M
- View specs →Boston Harbor Rock Blasting And Dredging, Boston, Macompleted
· $62.8M
- View specs →Ehrm Infrastructure Upgrades - Central Western Massachusettsunder construction
· $65.5M
- View specs →New Bedford Harbor Superfund Site Dredging, New Bedford, Macompleted
· $74.8M
- View specs →Unaccompanied Enlisted Personnel Housing (Ueph) Barracks Replacement, Fort. Meade, Marylandcompleted
· $86.5M
- View specs →Award Of Base And Options 1A East Shop Shell, Option 2A West Shop Shell, And Option 5 Insulated Metal Panels For Regionacompleted
· $50.8M
- View specs →Construction Of Massachusetts National Cemetery, Phase 4 Expansioncompleted
· $33.0M
- View specs →Construct New Human Engineering Lab, Soldier Squad Performance Research Institute (S2Print), Natick, Ma.completed
· $40.8M