Michigan · Division 03
Concrete projects in Michigan
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Michigan projects, 31 need this division and 1 are still in planning or permitting.
As of 2026-11-03, 31 of the 300 highest-scored Michigan projects in the SpecIndex index need concrete, and 1 of those are still in planning or permitting.
Search the full index →- Expand Pharmacy And Radiology - Minor Construction - Iron Mountain Vamc Dbb - Implementation Of Executive Order 14398under construction
· $10M-$50M
- View specs →Alteration — 600 Civic Center Drpermitting
Detroit · $50M-$100M
- Gaoa Monocle Lake Recreation Access Road Resurfacingunder construction
· Under $1M
- Water System Improvement Project On Grand Island National Recreation Areacompleted
· Under $1M
- Eo14398 Seney Nwr-Dc Dam Decommisioningunder construction
· Under $1M
- Fy25 Bolles Harbor And Fy26 Monroe Harbor Maintenance Dredging And Cdfcompleted
· $1M-$10M
- Great Lakes Dredging Multiple Award Task Order Contract (Matoc)completed
· $1M-$10M
- This Project Consists Of Replacement Of 116 Historic Exterior Windows And Windows Identified As No Longer Retaining Inteunder construction
· $1M-$10M
- Construction Of The New Third Lock, New Lock At The Soo, Sault Ste. Marie, Michigan.under construction
· $100M+
- Lexington Harbor Breakwater Repairunder construction
· $10M-$50M
- Soo Locks Generator And Duct Bankunder construction
· $10M-$50M
- In Accordance With The Attached Statement Of Work, This Award Is To Replace The Attic Insulation And Ceilings At The Jorunder construction
· Under $1M
- Poe Lock (Downstream) Stop Log Recess Repairsunder construction
· $1M-$10M
- Soo Facility Lighting Modernizationunder construction
· $1M-$10M
- Construction Of Upstream Approach Walls, New Soo Lock Complex, Sault Ste. Marie, Mi.completed
· $100M+
- Fy25 Lexington Harbor Maintenance Dredgingcompleted
· $1M-$10M
- Mi- Detroit Riv Int Wr-Green Trail Rehabunder construction
· Under $1M
- Ontonagon, Port Wing, And Cornucopia Maintenance Dredgingcompleted
· $1M-$10M
- Black River Harbor Waterfall Overlook Reconstruction 2026under construction
· $1M-$10M
- Cms Support Of The New Lock Chamberunder construction
· Under $1M
- Erhm Battle Creek Infrastructure Upgrades Constructioncompleted
· $50M-$100M
- Fy25 Ludington And Pentwater Maintenance Dredgingunder construction
· $1M-$10M
- Fy26 Saginaw River Maintenance Dredgingcompleted
· $1M-$10M
- P404 Reserve Center & Vehicle Maintenance Facility, Battle Creek, Micompleted
· $50M-$100M
- Replace Shelter Building At The Bishop International Airport In Flint, Miunder construction
· Under $1M
- Slbe 318729 - Rehabilitation Of Manitou Islands, At Sleeping Bear Dunes National Lakeshore, Miunder construction
· $10M-$50M
- Alpena Ang Hangar And Maintenance Shops At Alpena, Micompleted
· $10M-$50M
- Bi-Directional Fish Passage Union Street Traverse City, Michigancompleted
· $10M-$50M
- Construct Hangar 4 At Selfridge Air National Guard Base, Macomb County Micompleted
· $10M-$50M
- Ehrm Infrastructure Construction Project - Detroitunder construction
· $10M-$50M
- Fy25 South Haven + New Buffalo Md Awardcompleted
· $1M-$10M