Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Missouri projects, 46 need this division and 4 are still in planning or permitting.
As of 2026-11-03, 46 of the 300 highest-scored Missouri projects in the SpecIndex index need concrete, and 4 of those are still in planning or permitting.
Search the full index →- Accessibility Improvements, Multiple Group Camp Assets
Trenton
- Construct 60 Soldier Barracks, Building 446
Nevada
- New Outdoor Pavilion
St James
- View specs →Truman Lake Station Drainage Replacement
77146
- View specs →Lock And Dam 24 Pier Rehabunder construction
· $10M-$50M
- Nesp Ld25 Lock Foundation And Site Preparationunder construction
· $10M-$50M
- Mmr Stone Dike Alterationunder construction
· $1M-$10M
- Rcag Replacement At The Kirksville Mo Rcag (Irk) With The Specifications And Drawings.under construction
· Under $1M
- Construction Services For Levee Repair At The Following Sites: Saline County Levee District #2, Ray Carroll Levee, And Hunder construction
· Under $1M
- Construction Services To Remove Navigation Obstructions On The Missouri River Areas At River Miles (Rm) 90-91.under construction
· $1M-$10M
- N2W Nga Fy18 Design And Construction (Phase 1)completed
· $100M+
- The Purpose Of This Delivery Order Is To Resurface Flw Wp.completed
· Under $1M
- Eleven Point And Poplar Bluff Districts Roadway Surface Blading For The Mark Twain National Forest.under construction
· Under $1M
- Ld22 Fish Passage Improvement Projectunder construction
· $50M-$100M
- Stone Placement Along The Missouri River Between River Miles 360-498.completed
· $50M-$100M
- The Purpose Of This Delivery Order Is To Paint Long Line Striping To Various Roads.under construction
· Under $1M
- Access Control Points (Acp)completed
· $10M-$50M
- Bank Stabilization And Navigation Improvements Along The Missouri River.completed
· $10M-$50M
- Bank Stabilization And Navigation Project- Navigation Channel Structures Repairs- Stone Placement Of 363,600 Tonscompleted
· $10M-$50M
- Erhm Infrastructure Upgrades Construction Kansas Cityunder construction
· $10M-$50M
- Flightline Fueling Facilityunder construction
· $10M-$50M
- Igf::Ot::Igf Turkey Creek Interceptor, Is Flood Reduction Project For The Greater Ks And Mo Urban Areas Around Central Kcompleted
· $10M-$50M
- Intake Gate Replacement - Unit 3, Table Rock Powerhouse, Taney County, Missouri.completed
· $1M-$10M
- Reinforced Concrete Floodwallcompleted
· $10M-$50M
- Renovate - Bldg. 730under construction
· $10M-$50M
- Repair L-550 Levee, Missouri River, Mocompleted
· $10M-$50M
- The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted
· $10M-$50M
- Construction & Maintenance Of Riversunder construction
· $10M-$50M
- Contractor To Provide Construction Services To Complete The Ehrm Project At The Columbia Mo Vamc.completed
· $10M-$50M
- For Construction Of Flood Walls, Earthen Levees, Interior Storm Water Piping, Tributary Channel Realignment And Bank Stacompleted
· $10M-$50M
- Jbnc Phase 5C Constructioncompleted
· $10M-$50M
- Ld25 Downstream Approach Guide Cellunder construction
· $10M-$50M
- Ld25-Removal/Demolition Of Existing Cellcompleted
· $1M-$10M
- Levee And Relief Wells Constructioncompleted
· $10M-$50M
- Priority: High Mission Essential Introduction: This Project Will Improve A Forest Service Road That Has Deteriorated Dueunder construction
· Under $1M
- Remote Inspection Facility Basecompleted
· $10M-$50M
- Site Preparation For Temporary Building, Ucic-Mcx Compound, Taney County, Missouri. All Shall Be Complete Within Sixty (completed
· $1M-$10M
- The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted
· $10M-$50M
- This Purchase Order Is Being Created To Provide The Payment Of The Settlement Amount Of $336,292.40 For The Armed Serviccompleted
· Under $1M
- Waterline Relocationunder construction
· $10M-$50M
- Aap 719377 And 719378, Contract 12444526D0010under construction
· Under $1M
- Clearing And Snaggingunder construction
· $1M-$10M
- Construction Of Ammunition Handling Area In Fort Leonard Wood, Missouri.completed
· $1M-$10M
- Construction Services To Remove Navigation Obstructions On The Missouri River At River Mile 67-69. The General Scope Of under construction
· $1M-$10M
- Design-Build Contract For The National Geospatial Intelligence Agency For The Arnold Electrical Substation Replacement Icompleted
· $10M-$50M
- Follow On Task Order For W91S724F2418 From The Sps System To Acws.completed
· $1M-$10M