Missouri · Division 03

Concrete projects in Missouri

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Missouri projects, 46 need this division and 4 are still in planning or permitting.

As of 2026-11-03, 46 of the 300 highest-scored Missouri projects in the SpecIndex index need concrete, and 4 of those are still in planning or permitting.

Search the full index →
  • Accessibility Improvements, Multiple Group Camp Assets

    Trenton

  • Construct 60 Soldier Barracks, Building 446

    Nevada

  • New Outdoor Pavilion

    St James

  • Truman Lake Station Drainage Replacement

    77146

    View specs →
  • Lock And Dam 24 Pier Rehabunder construction

    · $10M-$50M

    View specs →
  • Nesp Ld25 Lock Foundation And Site Preparationunder construction

    · $10M-$50M

  • Mmr Stone Dike Alterationunder construction

    · $1M-$10M

  • Rcag Replacement At The Kirksville Mo Rcag (Irk) With The Specifications And Drawings.under construction

    · Under $1M

  • Construction Services For Levee Repair At The Following Sites: Saline County Levee District #2, Ray Carroll Levee, And Hunder construction

    · Under $1M

  • Construction Services To Remove Navigation Obstructions On The Missouri River Areas At River Miles (Rm) 90-91.under construction

    · $1M-$10M

  • N2W Nga Fy18 Design And Construction (Phase 1)completed

    · $100M+

  • The Purpose Of This Delivery Order Is To Resurface Flw Wp.completed

    · Under $1M

  • Eleven Point And Poplar Bluff Districts Roadway Surface Blading For The Mark Twain National Forest.under construction

    · Under $1M

  • Ld22 Fish Passage Improvement Projectunder construction

    · $50M-$100M

  • Stone Placement Along The Missouri River Between River Miles 360-498.completed

    · $50M-$100M

  • The Purpose Of This Delivery Order Is To Paint Long Line Striping To Various Roads.under construction

    · Under $1M

  • Access Control Points (Acp)completed

    · $10M-$50M

  • Bank Stabilization And Navigation Improvements Along The Missouri River.completed

    · $10M-$50M

  • Bank Stabilization And Navigation Project- Navigation Channel Structures Repairs- Stone Placement Of 363,600 Tonscompleted

    · $10M-$50M

  • Erhm Infrastructure Upgrades Construction Kansas Cityunder construction

    · $10M-$50M

  • Flightline Fueling Facilityunder construction

    · $10M-$50M

  • Igf::Ot::Igf Turkey Creek Interceptor, Is Flood Reduction Project For The Greater Ks And Mo Urban Areas Around Central Kcompleted

    · $10M-$50M

  • Intake Gate Replacement - Unit 3, Table Rock Powerhouse, Taney County, Missouri.completed

    · $1M-$10M

  • Reinforced Concrete Floodwallcompleted

    · $10M-$50M

  • Renovate - Bldg. 730under construction

    · $10M-$50M

  • Repair L-550 Levee, Missouri River, Mocompleted

    · $10M-$50M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted

    · $10M-$50M

  • Construction & Maintenance Of Riversunder construction

    · $10M-$50M

  • Contractor To Provide Construction Services To Complete The Ehrm Project At The Columbia Mo Vamc.completed

    · $10M-$50M

  • For Construction Of Flood Walls, Earthen Levees, Interior Storm Water Piping, Tributary Channel Realignment And Bank Stacompleted

    · $10M-$50M

  • Jbnc Phase 5C Constructioncompleted

    · $10M-$50M

  • Ld25 Downstream Approach Guide Cellunder construction

    · $10M-$50M

  • Ld25-Removal/Demolition Of Existing Cellcompleted

    · $1M-$10M

  • Levee And Relief Wells Constructioncompleted

    · $10M-$50M

  • Priority: High Mission Essential Introduction: This Project Will Improve A Forest Service Road That Has Deteriorated Dueunder construction

    · Under $1M

  • Remote Inspection Facility Basecompleted

    · $10M-$50M

  • Site Preparation For Temporary Building, Ucic-Mcx Compound, Taney County, Missouri. All Shall Be Complete Within Sixty (completed

    · $1M-$10M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted

    · $10M-$50M

  • This Purchase Order Is Being Created To Provide The Payment Of The Settlement Amount Of $336,292.40 For The Armed Serviccompleted

    · Under $1M

  • Waterline Relocationunder construction

    · $10M-$50M

  • Aap 719377 And 719378, Contract 12444526D0010under construction

    · Under $1M

  • Clearing And Snaggingunder construction

    · $1M-$10M

  • Construction Of Ammunition Handling Area In Fort Leonard Wood, Missouri.completed

    · $1M-$10M

  • Construction Services To Remove Navigation Obstructions On The Missouri River At River Mile 67-69. The General Scope Of under construction

    · $1M-$10M

  • Design-Build Contract For The National Geospatial Intelligence Agency For The Arnold Electrical Substation Replacement Icompleted

    · $10M-$50M

  • Follow On Task Order For W91S724F2418 From The Sps System To Acws.completed

    · $1M-$10M