Mississippi · Division 07
Thermal and Moisture Protection projects in Mississippi
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 247 highest-priority scored Mississippi projects, 237 need this division and 34 are still in planning or permitting.
Search the full index →- View specs →586-22-104 Renovate N&Fs Kitchen Construction With A Period Of Performance Of 540 Calendar Days From Ntp Is Issued.under construction
· $12.3M
- View specs →586-22-102 | Renovate Pc Blueunder construction
· $6.5M
- View specs →Project To Replace The Lights In The Courtrooms And Associated Court Spaces At The Thad Cochran United States Courthouseunder construction
· $997,756
- View specs →Construction Services For A Gravesite Expansion Project At Biloxi National Cemeteryunder construction
· $13.9M
- View specs →Pharmacy Renovationunder construction
· $2.3M
- View specs →Replace Vor With Dme Shelter & Antenna At The Natchez, Ms (Hez) Dme In Accordance With The Specs And Drawings.under construction
· $602,584
- View specs →Refurbishment Bascule Bridgeunder construction
· $9.3M
- View specs →Aviary Netting Replacementcompleted
· $134,518
- View specs →High Pressure Ball Valvesunder construction
· $76,081
- View specs →Lng Vaporizor/Model Pba20Ss-29.4/1under construction
· $55,715
- View specs →Demolition Of North And South Sewage Lagoons At Stennis Space Center, Msunder construction
· $4.8M
- View specs →Task Order To Install Security System At Biloxi National Cemetery.under construction
· $51,309
- View specs →Mrl Item 465-L Slide Repairunder construction
· $7.9M
- View specs →Vick 209252 Stabilize Mint Spring Bayou & Vick 310725/324137 Stabilize Terraces & Graves At Vicksburg National Military under construction
· $10.5M
- View specs →Mrl 615-Lunder construction
· $5.6M
- View specs →Demolition Of Building 1100 Center Section And West Wing At Stennis Space Center, Msunder construction
· $33.8M
- View specs →Replace Interior Lighting At B-4400 With Energy Efficient Led Lighting.under construction
· $184,927
- View specs →Task Order - Tensas Parish, Louisiana, Levee Enlargement And Berms, Items 393-R, Fc/Mr And T, Wbmrlunder construction
· $16.0M
- View specs →Coastwide Beach And Dune Ecosystem Restoration, Harrison County, Msunder construction
· $37.1M
- View specs →Harrison County Beach Dune Plantingunder construction
· $5.8M