Montana · Division 03

Concrete projects in Montana · page 2

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Montana projects, 150 need this division and 3 are still in planning or permitting.

As of 2026-11-03, 150 of the 300 highest-scored Montana projects in the SpecIndex index need concrete, and 3 of those are still in planning or permitting.

Search the full index →

Showing 51–100 of 150 · page 2 of 3

  • Igf::Ot::Igf Missile Maintenance Dispatch Facility, Malmstrom Afb, Montanacompleted

    · $10M-$50M

  • Libi 241430 - Replace Dilapidated Visitor Facility, Little Bighorn Battlefield National Monumentcompleted

    · $10M-$50M

  • Mt Erfo Np Yell 2022-1(1), Yellowstone Np Old Gardiner Road Emergency Repairscompleted

    · $10M-$50M

  • The Contractor Shall Be Responsible For All Necessary Work To Achieve Required Outcomes, Including Materials, Labor, Equcompleted

    · $10M-$50M

  • The Contractor Shall Furnish All Labor, Equipment, Materials, Supplies, Supervision, And Transportation Necessary For Blcompleted

    · $10M-$50M

  • This Project Is Located Ne Of Columbia Falls Mt And Consists Of New Steel Girder Bridge, Removal Of Existing Bridge, Embcompleted

    · $10M-$50M

  • Construction - Gaoa - Reconstruction Of T-150. Demolish Existing T150 Building And Construct New Building With Similar Sunder construction

    · $1M-$10M

  • Design And Build Modernization Constructioncompleted

    · $1M-$10M

  • Funds Construction Contract: Mt Dar Malm 2024(1), Defense Access Roads Fy 2024. Work Includes Roadway Reconditioning, Agcompleted

    · $1M-$10M

  • Glac 307606 - Replace Swift Current Water Distribution System, Gaoacompleted

    · $1M-$10M

  • Helena-Lewis & Clark Nf Kading Campground Wellunder construction

    · Under $1M

  • Mt Dar 2022(1), Defense Access Roads Fy 2022completed

    · $1M-$10M

  • Mt Dar Malm 2023(1), Defense Access Roads Fy 2023. This Project Is In Harlowton Mt And Consists Of Roadway Reconditionicompleted

    · $1M-$10M

  • Mt Flap Park 34(2), Shields River Road Surface Improvement. Work Consists Of Up To 13.5 Miles Of Paving. Grading, And Rocompleted

    · $1M-$10M

  • Resurface Roads On Tally Lake Ranger Districtcompleted

    · Under $1M

  • Welch-Gillispie Reconstructionunder construction

    · Under $1M

  • Billings Area (Poplar, Mt / Pryor, Mt / Arapahoe, Wy) Generator Projectunder construction

    · $1M-$10M

  • Boulder Creek Bridge Replacement - (677-0.1) Task Order On The Pintler Rd Of The Beaverhead-Deerlodge National Forest Thcompleted

    · Under $1M

  • Construction Services For Project Mt Flap Valley 20(1), Duck Creek Road Work Consists Of Roadway Reconditioning, Aggregacompleted

    · $1M-$10M

  • Funding Construction Project Mt Np Glac P Hq (1), Glac Hq Parking Area Rehabilitation. Project Located 0.5 Miles N Of Wecompleted

    · $1M-$10M

  • Funds Construction Contract Mt Erfo Np Yell 2022-1(3), Yellowstone Np Rescue Creek Bridge Replacement. Work Includes Repunder construction

    · $1M-$10M

  • Funds Construction Project Mt Flap Park 2021(1), Old Yellowstone Trail South Improvements And Preservation. Work Includcompleted

    · $1M-$10M

  • (Gaoa) Benchmark Solar Water System Update, Helena-Lewis & Clark Nf, Montanaunder construction

    · Under $1M

  • Gaoa Lcic Exhibit Updatesunder construction

    · Under $1M

  • Haxby 4 Fenceunder construction

    · Under $1M

  • Hlcnf Grasshopper Campground Improvementsunder construction

    · Under $1M

  • Mtao Yt-Generator Co2 System Replacementunder construction

    · Under $1M

  • Mt Flathead 486(1), North Fork Of The Flathead River; Mt Flap Flathd 2021(1), Blankenship And Belton Stage Road Resurfaccompleted

    · $1M-$10M

  • Replacement Of The Runway 20 Runway End Identifier Lights (Reil) At The Glacier Park International Airport (Kgpi) In Kalunder construction

    · Under $1M

  • Task Order Award For Trail Bridge Replacements, Custer Gallatin National Forest, Montana.completed

    · $1M-$10M

  • Architect-Engineer Designer Of Record Support For Basin Mining Area Superfund Site, Operable Unit (Ou5) And Operable Uniunder construction

    · $1M-$10M

  • Ash Creek Pipelineunder construction

    · Under $1M

  • Basin View Pipeline Phase Iiunder construction

    · Under $1M

  • Blackfeet Ct Room Renovation - Constructionunder construction

    · $1M-$10M

  • Center Pivot Irrigation System Installationcompleted

    · $1M-$10M

  • Construction And Repairs Of Fuel Facilities At Malmstrom Afb, Montanacompleted

    · $1M-$10M

  • Construction Services For Project Mt Np Libi 10(2), Little Bighorn Battlefield National Monument Consisting Of Grading, completed

    · $1M-$10M

  • Enterprise-Wide Acquisition For Roofing Requirements For Roof Replacement, Preventative Maintenance, Corrective Repair, completed

    · $1M-$10M

  • Establish Runway 12 Rvr And Fots. Establish Runway 30 Malsr. Replace Runway 12 Ils. Relocate Runway 30 Papi At Bozeman Ycompleted

    · $1M-$10M

  • Gaoa Delmoe Lake Cg And Boat Launch Task Order Project Is For The Reconstruction And Improvement Of The Delmoe Lake Campcompleted

    · $1M-$10M

  • Gaoa Fkl Day Use Area And Emery Bay Campground Improvementunder construction

    · Under $1M

  • Gaoa Markley Bridge Replacement 1Ducompleted

    · $1M-$10M

  • Gaoa Stanford Bunkhouseunder construction

    · $1M-$10M

  • Hlcnf Yogo Road Aggregate Surface Replacementunder construction

    · Under $1M

  • Powerhouse 1 Draft Tube Stoplog Replacement At Fort Peck Dam, Mtcompleted

    · $1M-$10M

  • Task Order (To) - Erfo East Rosebud Road Permanent Repairs On The Custer Gallatin National Forest, Per Attached Terms, Scompleted

    · $1M-$10M

  • Attn: Nikki Layton Or Sam Cook/Stewardship Branch Project Name: Trojan Defense Fermcompleted

    · $1M-$10M

  • Convert Tech Building Into Office Space + Replace The Key System, Havre, Mtcompleted

    · Under $1M

  • Gaoa Upper West Fk Fish Creek Trail Bridge: Construction, Fabrication, And Assembly Of A New Stock Bridge To Replace Thecompleted

    · Under $1M

  • Hlcnf Gaoa Gipsy Lake Day Use Improvements Award: Base Bid (Site 1) + Option 1 (Site 2) + Option 2 (Site 3)under construction

    · Under $1M