Montana · Division 07
Thermal and Moisture Protection projects in Montana · page 5
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Montana projects, 256 need this division and 100 are still in planning or permitting.
As of 2026-11-03, 256 of the 300 highest-scored Montana projects in the SpecIndex index need thermal and moisture protection, and 100 of those are still in planning or permitting.
Search the full index →Showing 201–250 of 256 · page 5 of 6
- Specific Improvements To Forest Road 267, M.P. 2.257 Include, But Are Not Limited To: Removal And Disposal Of Two Existiunder construction
· Under $1M
- Specific Improvements To Fsr 267, Include, But Are Not Limited To: Selective Clearing, Removal And Disposal Of Existing under construction
· Under $1M
- The Work Consists Of Road Reconditioning Of Forest System Road In The Boulder Mountains On The Helena-Lewis And Clark Naunder construction
· Under $1M
- This Project Replaces 3 Aging And Structurally Deficient Timber Bridges On The Madison Ranger District (Bdnf). The Croscompleted
· Under $1M
- Bil Project: Stark-Cromwell Culvert Replacements. Replacement Of Three Deteriorating Undersized Culverts With Structurescompleted
· Under $1M
- View specs →Crow Service Unit: Annual Elevator PM Servicesplanning
Crow Agency
- Dean S. Recreation Sitecompleted
· Under $1M
- Disaster Supplement; Daly Creek Bridge Replacement And Road Repairunder construction
· Under $1M
- Dr West Fork Beaver Creek Trail #222 Repairsunder construction
· Under $1M
- Erfo-Dr Old Nye Fishing Access Permanent Repairs Multiple Award Task Order Contract For Road & Bridge Construction Withunder construction
· Under $1M
- Falls Creek Campground Renovationscompleted
· Under $1M
- Gaoa Centennial Road Improvements Task Order On The Madison Rdcompleted
· Under $1M
- Gaoa - Medicine Lake Nwr Exterior Rehab Construction Workcompleted
· Under $1M
- Gaoa Pavement Preservation Pine Creek Rd 1Aycompleted
· Under $1M
- Good Creek Bridge Replacement Projectcompleted
· Under $1M
- Libi 241430 Construction Management Services For Replace Dilapidated Visitor Center, Little Bighorn Battlefield Nationalunder construction
· Under $1M
- Little Rock Creek Trail Bridge Replacementcompleted
· Under $1M
- Mt-Creston Nfh-Water Wells Rehabunder construction
· Under $1M
- Potable Watercompleted
· Under $1M
- Ruby Creek Bridges Replacement On The Wisdom Ranger District Of The Bdnf This Project Replaces Two Structurally Deficiencompleted
· Under $1M
- Smokejumper Loft Fire Recovery Building Reconstruction Repairs Per Attached Sow, Drawings, Specifications And Contract Ccompleted
· Under $1M
- Stake Culverts For Counter Sunk Inlet And Lower Pipe Elevation To Avoid Shotgun While Matching Existing Grade. Furnish completed
· Under $1M
- The 120 Aw Requires An Adequately Configured Aircraft Apron For C-130 J-30 Operating Capability On The Great Falls Intercompleted
· Under $1M
- To Rehabilitation Approximately 2,256 Sf Of Housing Quarters 16 Of The Historic West Lakes Headquarters In Glacier Natiocompleted
· Under $1M
- View specs →Turner Roof and Building Envelope Project
Turner
- Yellowstone Canal Riprapcompleted
· Under $1M
- Yellowtail Contaminated Rock Removalcompleted
· Under $1M
- Coal Banks Boat Ramp Rennovationcompleted
· Under $1M
- Cooper Ts Road Reconditioningunder construction
· Under $1M
- Design-Build Construction Services For The Rehabilitation Of The Avalanche Campground Comfort Station #761, Glacier Naticompleted
· Under $1M
- Emergency Generator For San Diego Facility.completed
· Under $1M
- Fp Boundary Fence Project, Fort Peck, Mtunder construction
· Under $1M
- Fy25 Disaster Roads Project - Custer Gallatin National Forestcompleted
· Under $1M
- Gaoa Central West Zone Toilet Replacement Projects 1Dt, 1Bf, 1Dx Replace Or Install Multiple Concrete Vault Toilets On Tcompleted
· Under $1M
- View specs →GAOA Certified Historic Masonry Work in Custer-Gallatin NF
Bozeman
- View specs →GAOA Concrete Vault Toilet Installation
Helena
- Gaoa - Deer Creek Bridge Replacement Lolo Nfcompleted
· Under $1M
- Gaoa: Delivery And Installation Of Horseshoe Creek Trail Bridge In The Absaroka Beartooth Wilderness On The Beartooth Raunder construction
· Under $1M
- Mcfo Ekalaka Fencecompleted
· Under $1M
- Mcfo Vehicle Wash Padcompleted
· Under $1M
- Red Hawk Roads Reconstructionunder construction
· Under $1M
- Region 1: Custer Gallatin National Forest - Mosquito Pass Pre-Road Maintenance/Constructioncompleted
· Under $1M
- View specs →Request For Informationplanning
Malmstrom AFB
- View specs →Request For Information - Fiber Optic Cabling Requirement Contractplanning
Malmstrom AFB
- Subsurface Investigation And Site Closure At Site Tu465 And Tu469under construction
· Under $1M
- Wildlife Friendly Fencing Phase 1completed
· Under $1M
- View specs →Automatic Doors Preventative Maintenance (PM) Services for the Northern Cheyenne Service Unit, Lame Deer, MT.
Lame Deer
- Devil'S Elbow Dry Storage Garagecompleted
· Under $1M
- Eng Fy25 Goose Creek Roads Public Workscompleted
· Under $1M
- Gaoa Dry Fork Road Culvert Replacementcompleted
· Under $1M