North Dakota · Division 03

Concrete projects in North Dakota

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored North Dakota projects, 119 need this division and 3 are still in planning or permitting.

As of 2026-11-03, 119 of the 300 highest-scored North Dakota projects in the SpecIndex index need concrete, and 3 of those are still in planning or permitting.

Search the full index →

Showing 1–50 of 119 · page 1 of 3

  • Construct Bismarck O&M Service Center Vehicle Storage Building No. 4 in North Dakota

    Bismarck

    View specs →
  • Full Office Build Out Of Approximately 2800 Sf Of Currently Vacant Space On The Third Floor Of The Ronald Davies Federalunder construction

    · $1M-$10M

  • Bid Build Gfk Atctunder construction

    · $50M-$100M

  • This Contract Is For The Proliferated Warfighter Space Architecture (Pwsa) Phase 3 Conversion Of Building 607 At Grand Funder construction

    · $10M-$50M

  • 437-24-150, Replace Nurse Call And Code Blue Systemunder construction

    · $1M-$10M

  • Repair Sfs / Ops Building 110under construction

    · $1M-$10M

  • Belcourt Heat Exchange And Boiler Replacementunder construction

    · $1M-$10M

  • Pn: 437-23-165 Repair Water System To Prevent Legionella For The Fargo Vahcsunder construction

    · $1M-$10M

  • This Project Is To Replace 2 Of The 4 Existing Boilers As Documented In The Attached Mechanical And Electrical Drawings under construction

    · Under $1M

  • Nd Tewaukon Nwr - Small Home Supply And Deliveryunder construction

    · Under $1M

  • Repair West Aircraft Apronunder construction

    · Under $1M

  • Construction Of The Red River Structure Of The Fargo Moorhead Metropolitan Area Flood Risk Management Projectunder construction

    · $100M+

  • Minot Helo Ops Facility Construction, Minot Afb, Nd.under construction

    · $100M+

  • Provide All Equipment And Labor To Install Fiber Optic Cabling Between Buildings 744 To 879 And 896.under construction

    · Under $1M

  • Design-Build Services For The New Construction Of The Dunseith Nd Lpoe, 10098 Us-281, Dunseith, Nd 58329under construction

    · $50M-$100M

  • Fmm Southern Embankment Se-2Bunder construction

    · $50M-$100M

  • I-29 Grade Raise And Borrow Ditch Crossing Of The Fargo Moorhead Metropolitan Area Flood Risk Management Projectcompleted

    · $50M-$100M

  • Igf::Ot::Igf Fargo Diversion Inlet Structurecompleted

    · $50M-$100M

  • Nd Omad 2024(1) Minuteman Missile Access Roads The Purpose Of This Construction Contract Is To Re-Gravel Several Miles completed

    · $1M-$10M

  • Wild Rice River Structure.completed

    · $50M-$100M

  • Ehrm Tier Two Infrastructure Upgrades At Fargo Vamc - Project # 437-21-210 Fargo, Ndunder construction

    · $10M-$50M

  • Fmm Se-3under construction

    · $10M-$50M

  • Nd Ftfw Desl 11(4) Auto Tour Route Construction Contractcompleted

    · $1M-$10M

  • Nd Ftnp Thro 11(10) South Unit Scenic Loop Slide Repair Road Reconstructioncompleted

    · $10M-$50M

  • 437-23-105 Replace Fire Alarm Systemunder construction

    · $1M-$10M

  • B546 Missile Command Hq Renovationcompleted

    · $10M-$50M

  • Construct Emergency Power Plant (Epp) - Fuel Storage Facility At Cavalier Space Force Station, North Dakotaunder construction

    · $10M-$50M

  • Construction Of A New Line Of Drains At The West End Of Garrison Dam. This Is A Dam Safety Project.under construction

    · $1M-$10M

  • Fmm Se-1Bunder construction

    · $10M-$50M

  • Nd - Tewaukon National Wildlife Refuge (Nwr) - Replace Water Distribution System Description: The U.S. Fish And Wildlifunder construction

    · Under $1M

  • Oxbow, Hickson, And Bakke Ring Levee Of The Fargo Moorhead Metropolitan Flood Risk Management Projectunder construction

    · $10M-$50M

  • Phase Ii Renovation Of Building 607 At Grand Forks Afb, Nd For A Satellite Support Facility (Ssf)under construction

    · $10M-$50M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Necunder construction

    · $10M-$50M

  • This Contract Is For The Transformation Of Building 607 From Administrative Offices To An Operations Center. Transformatcompleted

    · $1M-$10M

  • This Project Consists Of Constructing A 25,600 Sf Precast Concrete Building With A Standing Seam Metal Roof. A Portion Ocompleted

    · $10M-$50M

  • Vetter Dentalplanning

    Fargo

  • 4 Renovation And Repair Projects, Minot Afb, Nd Sba Acceptance Ci1749560530Wcontains Cuiunder construction

    · $1M-$10M

  • Belcourt Multiplex For Constructionunder construction

    · $10M-$50M

  • Construction And Repair Of Fuel Facilities At Minot Afbcompleted

    · $1M-$10M

  • Construction Cost Onlycompleted

    · $1M-$10M

  • Nd Flap Sdn 7Ne(1) Hoffer Lake Access Road - Construction Contractcompleted

    · $1M-$10M

  • Replace Water Supply Infrastructure, Mandancompleted

    · $1M-$10M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted

    · $10M-$50M

  • 437-22-108, Place Chilled Water Pumps On Epower - Farunder construction

    · Under $1M

  • 437-25-103, 3 Year Electrical Testing & Maintenanceunder construction

    · $1M-$10M

  • Belcourt Emergency Department Exterior Improvementscompleted

    · $1M-$10M

  • Construct Special Vehicle Maint Facility - Minot Afbcompleted

    · $1M-$10M

  • Contractor Shall Provide A Firm-Fixed-Price For All Labor, Personnel, Equipment, Materials, Tools, Personal Protective Ecompleted

    · $1M-$10M

  • Corrosion Contol B210 This Project Consists Of Remodeling A 23,000 Sf Block And Brick Aircraft Hangar Into A Corrosion Ccompleted

    · $1M-$10M

  • Design & Construct Munitions Maint Inspection Facilitycompleted

    · $1M-$10M