New Jersey · Division 07
Thermal and Moisture Protection projects in New Jersey · page 2
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored New Jersey projects, 153 need this division and 125 are still in planning or permitting.
As of 2026-11-03, 153 of the 300 highest-scored New Jersey projects in the SpecIndex index need thermal and moisture protection, and 125 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 153 · page 2 of 4
- Alteration — Toms Riverpermitting
Toms River · $1M-$10M
- Alteration — West Caldwellpermitting
West Caldwell · $1M-$10M
- Alteration — Willingboropermitting
Willingboro · $1M-$10M
- Beach Nourishment Great Egg Harbor Inlet To Townsends Inletcompleted
· $10M-$50M
- Njang Repair Base Wide Snowstorm Damage.under construction
· Under $1M
- Addition — Bloomingdalepermitting
Bloomingdale · $1M-$10M
- Addition — Little Egg Harborpermitting
Little Egg Harbor · $1M-$10M
- Addition — Ocean Twppermitting
Ocean Twp · $1M-$10M
- Alteration — Bloomingdalepermitting
Bloomingdale · $1M-$10M
- Alteration — Dennispermitting
Dennis · $1M-$10M
- Alteration — Edisonpermitting
Edison · $1M-$10M
- Alteration — Edisonpermitting
Edison · $10M-$50M
- Alteration — Eveshampermitting
Evesham · $1M-$10M
- Alteration — Greenwich Warrenpermitting
Greenwich Warren · $1M-$10M
- Alteration — Hightstown Boropermitting
Hightstown Boro · $1M-$10M
- Alteration — Hightstown Boropermitting
Hightstown Boro · $1M-$10M
- Alteration — Laceypermitting
Lacey · $1M-$10M
- Alteration — Libertypermitting
Liberty · $1M-$10M
- Alteration — Montclairpermitting
Montclair · $1M-$10M
- Alteration — Montclairpermitting
Montclair · $1M-$10M
- Alteration — Raritan Twppermitting
Raritan Twp · $1M-$10M
- Alteration — Vernonpermitting
Vernon · $1M-$10M
- Alteration — West Caldwellpermitting
West Caldwell · $1M-$10M
- View specs →B2621 Dorm Construction Renovations
Joint Base MDL
- View specs →Design/Build for the Full Facility Restoration of Barracks Building 5509 located at JBMDL, NJ
- View specs →Emergency Sewer Line Repair Sole Sourceplanning
· Under $1M
- View specs →FY22 MRAR Building 5921 Vehicle Maintenance Shop at Joint Base McGuire-Dix-Lakehurst, NJ
Burlington
- View specs →FY23 MRAR Building 5921 Vehicle Maintenance Shop - Transient at Joint Base McGuire-Dix-Lakehurst, NJ
Joint Base MDL
- View specs →Joint Base MDL - Kitchen Exhaust Hood Maintenance
Joint Base MDL
- View specs →KC 46A Two Bay General Purpose MX Hangarunder construction
Burlington County
- New — Middletown Twppermitting
Middletown Twp · $1M-$10M
- Project 561A4-18-113 Correct D&F Deficiencies.under construction
· $1M-$10M
- Project# 561A4-26-503 Replacement Coils Building 4,53,57,135,143completed
· Under $1M
- View specs →Y1DA--561-18-155 Consolidate Diagnostic Cancer Center
East Orange
- View specs →Y1DA--561A4-18-119 - Upgrade Audiology & Eye Clinic Lyons Bldg. 3
Lyons
- View specs →Y1DA--Consolidate Diagnostic Cancer Center (VA-20-00099947)
East Orange
- View specs →Y1DA--Replace Flooring, Building 1, 4th Floor
East Orange
- View specs →Youth Center Annex Joint Base -MDL (Ft.Dix), New Jersey
Joint Base MDL
- Addition — Somervillepermitting
Somerville · $1M-$10M
- Alteration — Bloomfieldpermitting
Bloomfield · Under $1M
- Alteration — Bloomfieldpermitting
Bloomfield · Under $1M
- Alteration — Boonton Twppermitting
Boonton Twp · Under $1M
- Alteration — Bridgewaterpermitting
Bridgewater · $1M-$10M
- Alteration — Chester Twppermitting
Chester Twp · Under $1M
- Alteration — Edisonpermitting
Edison · $1M-$10M
- Alteration — Edisonpermitting
Edison · $10M-$50M
- Alteration — Elizabethpermitting
Elizabeth · $1M-$10M
- Alteration — Elizabethpermitting
Elizabeth · $1M-$10M
- Alteration — Hightstown Boropermitting
Hightstown Boro · $1M-$10M
- Alteration — Hobokenpermitting
Hoboken · $1M-$10M