New Mexico · Division 22
Plumbing projects in New Mexico
Fixtures, piping, medical gas, water systems. Usually specified by the plumbing engineer. Counted across our 300 highest-priority scored New Mexico projects, 51 need this division and 32 are still in planning or permitting.
As of 2026-11-03, 51 of the 300 highest-scored New Mexico projects in the SpecIndex index need plumbing, and 32 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 51 · page 1 of 2
- View specs →Exterior Repairs to Wooten Hall - Las Cruces, NMunder construction
Las Cruces
- Crownpoint Medical Gas Upgrade Constructionunder construction
· $1M-$10M
- View specs →32214 Chavez Switchgear Replacement Albuquerque, NMunder construction
2000
- View specs →CAVE 169636 - Replace Old/Failing Electrical Distribution Infrastructure
CARLSBAD
- View specs →Hopewell Recreation Site Improvements on the Carson National Forest
Tres Piedras
- View specs →Repair-Replace Flooring Bldg. 1330under construction
White Sands Missile Range
- View specs →Stucco Replacementunder construction
LAS CRUCES
- View specs →Z--CAVE 169636 - Replace Old/Failing Primary Electric
- View specs →Pre-solicitation Announcement - FCCO Parking Lot Repair
FARMINGTON
- View specs →Replace HVAC West Fitness Center
Kirtland AFB
- Santa Fe And Taos-Picuris Ihc Lab And Rx Casework Improvementsunder construction
· Under $1M
- View specs →B1044 Chiller and CRAC Units Replacement
0
- View specs →Boiler and Water Treatment System Replacement - Albuquerque ARTCC
Albuquerque
- View specs →Construct one 100 yard and one 300 yard range
ARTESIA
- View specs →Design Build BAS Upgrade, Pete Domenici Courthousedeadline not recorded
Albuquerque
- View specs →Modernize Electrical and HVAC Redundancy
Clovis
- View specs →Repair/Replace Carpet Bldg. 100, 2nd Floor
White Sands Missile Range
- View specs →Santa Fe Indian Health Center (SFIHC) Roof Replacement and Fall Protection
- View specs →TPPIHC Roof Replacement and Fall Protection
Taos
- View specs →Magdalena Water Softener Install Cibola National Forest
Magdalena
- View specs →70159 GSA Fire Alarm Upgrade
Gallup
- View specs →ACS Control Upgradesunder construction
Cannon AFB
- View specs →Amendment 0004, Design Bid Build, ERCIP Micro-Grid, White Sands Missile Range, NM
White Sands Missile Range
- View specs →GALLUP FEDERAL BLDG- Fire Alarm System Upgrade
Gallup
- View specs →Install Beacon Lighting
Cannon AFB
- View specs →Wash Rack Utility Connectionunder construction
Kirtland AFB
- View specs →WSMR - Paintings of Various Buildings
White Sands Missile Range
- View specs →56--BLM-NM RFO COMANCHE OXBOW FENCING INSTALLATIONunder construction
Roswell
- D/B Repair Building 322 Cerebro Laboratory, Kirtland Air Force Base, Bernalillo County, New Mexicounder construction
· $1M-$10M
- View specs →Sandia District Vehicle Gate Replacement
Tijeras
- View specs →Video Audio Camera Installation - New Sunrise Regional Treatment Center (NSRTC)under construction
Zuni
- View specs →Voice and Paging Infrastructure for New Sunrise Regional Treatment Center (NSRTC)under construction
Zuni
- View specs →27 SOCES Vertical Transportation Equipment (VTE) Servicesplanning
Cannon AFB
- View specs →DC Battery Replacement/Disposal
- View specs →HVAC Repairs for Northern Navajo Medical Center
Shiprock
- View specs →TDAC-WSMR Installation of Motion Sensors
- View specs →Y--Datil Well CG Double Vault Toilet Socorro Field Ofunder construction
- View specs →Y--SFO BUCK FIRE BAER FENCE
- View specs →Z--SMOKEY CIRCLE RTU HVAC REPLACEMENT
Grants
- View specs →HVAC Repairs
Shiprock
- View specs →NNMC Fire Pump Emergency Call-Back Services
Shiprock
- View specs →Wall Painting Services
Holloman Air Force Base
- Chcu 310250, Replace Obsolete Housing At Chaco Cultural Historical Park, New Mexicounder construction
· $1M-$10M
- Crownpoint Staff Quarters Replacementunder construction
· $10M-$50M
- View specs →Dishwasher Replacement B9436
- Eo 14398 Zuni Quarters Sewer Improvementcompleted
· Under $1M
- View specs →HVAC Repair Services
Chaparral
- View specs →Sources Sought (ISBEE and Small Business Concerns) - Purchase Elevator and Preventive Maintenance Services (PMS)planning
Shiprock
- Construct Satellite Assessment Laboratory For Space Situational Awareness (Salssa), Kirtland Air Force Base, Bernalillo completed
· $1M-$10M
- Design Bid Build Fy 23 Construct Integration Lab (Revil), At Kafbcompleted
· $1M-$10M