Nevada · Division 03
Concrete projects in Nevada
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Nevada projects, 156 need this division and 0 are still in planning or permitting.
Search the full index →- View specs →Harden The Exterior Envelope Of The Lloyd D George Courthouse, 333 S Las Vegas Blvd, Las Vegas, Nv 89101.under construction
· $864,081
- View specs →This Project Includes Construction Of An Asphalt Trail Connecting The Upper Visitor Center To The Lower Acastus Trail Anunder construction
· $499,997
- View specs →Nv Ash Meadows Nwr Cry Sprngs Restoreunder construction
· $9.3M
- View specs →Rkmf200014B-Demo Area Iii Tlf B2945, B2950, B2955, And B2960.under construction
· $1.3M
- View specs →Disaster Resiliency Program (Drp) Phase 2 Creech Afb Nevadaunder construction
· $106.1M
- View specs →99 Ces - Pka - Rkmf 260074 - Repair Hvac Ews B421 (Construction)under construction
· $179,780
- View specs →Nv-Desert Nwr-Irrigation Installationunder construction
· $18,200
- View specs →One-Phase Design-Build To Repair A 1950S Hangar At Nellis Afb For An F-35 Squadron. Includes Hangar, Admin Upgrades, Andunder construction
· $32.1M
- View specs →Disaster Resiliency Program (Drp) Phase 1under construction
· $146.7M
- View specs →Nv Ftbl 1094(1) Wilson Campground Road Award Of A Construction Contract For Road Resurfacing, Drainage Improvements, Safunder construction
· $3.4M
- View specs →Design Build Construction Of Replace Seismically Deficient Boiler Plant, Building 8. Vamc Reno, Nv.under construction
· $77.6M
- View specs →Lake 324894 - Echo Bay Launch Ramp Extension At Lake Mead National Recreation Area In Boulder City, Nevadaunder construction
· $6.8M
- View specs →This Acquisition Will Result In A Firm-Fixed Price (Ffp) Design-Build Contract Task Order For The Construction Of P-429 under construction
· $42.5M
- View specs →B1706 Reno Constructionunder construction
· $13.6M
- View specs →365 Isr Group Consolidated Facilitycompleted
· $37.9M
- View specs →Nevada Army National Guard (Nvarng) Requires The Construction Of A New Qualification Training Range (Qtr) At Hawthorne Aunder construction
· $15.6M
- View specs →Primary Facility(53Wg Ops-Test Facility)completed
· $40.7M
- View specs →Remove Existing Fuel Tank, Construct Two Fuel Tanks With Foundations, Electrical, Piping, And Recirculation Tie-Ins. Insunder construction
· $10.0M
- View specs →Ecp 8-5 Is Undergoing Upgrades To Meet Current Air Force Standards. The Project Includes Roadway Reconfiguration To A Wicompleted
· $2.7M
- View specs →Kirman Avenue Utilitiesunder construction
· $6.6M