Oregon · Division 03

Concrete projects in Oregon · page 2

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Oregon projects, 201 need this division and 4 are still in planning or permitting.

As of 2026-11-03, 201 of the 300 highest-scored Oregon projects in the SpecIndex index need concrete, and 4 of those are still in planning or permitting.

Search the full index →

Showing 51–100 of 201 · page 2 of 5

  • Indefinite Delivery/Indefinite Quantity Single Award Task Order Contract For Construction Services At The Roseburg Hcs Iunder construction

    · Under $1M

  • Or Dot 18(1), Or58: Coast Fork Willamette River To Lower Salt Cr Bridges. The Primary Objective Of The This Project Is Tcompleted

    · $10M-$50M

  • Or Dot Crgnsa 100(4), Historic Columbia River Highway State Trail, Mitchell Point Crossingcompleted

    · $10M-$50M

  • Or Flap Dot Crgnsa 100(8), Multnomah Falls Viaducts Repair: This 2.6-Mile Project Includes Repair Of Two Historic Reinfocompleted

    · $10M-$50M

  • Or Tillamook B780(1), Cape Meares Road Relocationcompleted

    · $10M-$50M

  • Roads And Sewer Constructionunder construction

    · $1M-$10M

  • Task Order For Fawn Creek Rec Site Cxt Placement To Be Issued Under Fws Matoc For Alt/Repair (Civil) (140F0822D0048). Alunder construction

    · Under $1M

  • Warm Springs Modernization Design-Buildunder construction

    · $10M-$50M

  • West Coast Hopper Maintenance Dredging 2024completed

    · $10M-$50M

  • Western Oregon Service Unit (Wosu) School Based Health Center (Sbhc) Design-Buildunder construction

    · $10M-$50M

  • 692-22-105 Renovate Space In Buildings 217A And 218A For Mental Healthunder construction

    · $1M-$10M

  • Agricultural Research Service (Ars)/National Clonal Germplasm Repository Is Located At The Lewis Brown Research Farm In completed

    · $10M-$50M

  • Attached For Public Posting Is A Copy Of The Bid Abstract And Bid Abstract Continuation Sheet (2 Pgs Total) For Solicitaunder construction

    · $10M-$50M

  • Bldg 210 Alteration And Constructioncompleted

    · $1M-$10M

  • Con Nrm 653-19-101 Edii Correct Electrical Deficienciesunder construction

    · $10M-$50M

  • Construction Services Consists Of Paving, Chipseal, Patching, Grading, And Bridgrail.completed

    · $1M-$10M

  • Contractor To Provide Design And Construction Services To Complete The Mental Health Project At The Minneapolis Vamccompleted

    · $10M-$50M

  • Coos Bay Upriver Clamshell Maintenance Dredging 2024completed

    · $10M-$50M

  • Erfo Road 19 - Mp 55.5 Bridge (Deathball Bridge)completed

    · Under $1M

  • Funds Construction Contract Or Flap Dot Crgnsa 100(9), Historic Columbia River Highway State Trail, Perham Creek To Mitcunder construction

    · $1M-$10M

  • Funds Construction Project Or Flap Douglas 251(1), Oregon Dunes National Recreation Area - Umpqua Dunes Access Improvemecompleted

    · $1M-$10M

  • Funds Construction Project: Or Fs Dshut601 60(1), Road 60 Improvements, Mp 0 - 1.0. Work Includes Grinding, Paving, Stricompleted

    · Under $1M

  • Lamonta Fire Operations Building, Phase 2under construction

    · $10M-$50M

  • Mcnary Lock Elevator No. 2 Replacementunder construction

    · $1M-$10M

  • National Historic Oregon Trail Interpretive Center: Sustainability Improvements.completed

    · $1M-$10M

  • Oregon Washington Clamshell Maintenance Dredging 2025completed

    · $1M-$10M

  • Or Flap Polk Mitchell(1), Mitchell Street And Black Rock Road Reconstruction. This Project Includes Reconstruction Of Micompleted

    · $1M-$10M

  • Or Klamath Falls Fwo Construction Phaseunder construction

    · $1M-$10M

  • Or-Klamath Falls Nfh Construction Of Phase 1under construction

    · $10M-$50M

  • Perform Design-Bid-Build Construction Task Order As Solicited Under Taskorder Announcement 70Z05024R43000004, Uscg Staticompleted

    · $1M-$10M

  • Sp-Pol-Srm-Portland Iap. Or-Containment Fueling System Repairs W9128F21R0011 Rftop 83completed

    · $1M-$10M

  • The General Contractor Shall Provide All Labor, Materials, Equipment, Qualified Supervision, And Other Items To Completeunder construction

    · $1M-$10M

  • Usfs Sisters Ranger District Administration Building Deschutes National Forest Sisters Ranger District Deschutes County,completed

    · $1M-$10M

  • Visn 20 Construction Idiq Matoc 653-19-100 Replace Building Hvac Systemcompleted

    · $10M-$50M

  • Warm Springs Detention Center Rehabilitation Centercompleted

    · $1M-$10M

  • Cemetery Expansioncompleted

    · $1M-$10M

  • Con 653-25-104 Install Outdoor Pavilionscompleted

    · Under $1M

  • Construction Project To Add 6,500 Sq. Ft. And Minor Alterations For Bldg 235. Includes Exercised Option To Demolish Bldgunder construction

    · $1M-$10M

  • Construction Services For Project Or Dot 18(2), Or58 Fix-It Corridor Culvertscompleted

    · $1M-$10M

  • Construction Services For Project Or Fs Erfo 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & Wa Erfounder construction

    · $1M-$10M

  • Crazy Creek Fire Range Fence Reconstruction And Repair (Suppression Repair Work And Possible Bar)under construction

    · $1M-$10M

  • Esr Fence Repair & Install_Vale District, Orunder construction

    · $1M-$10M

  • Funding Construction Project Or Flap Grant 24(2), Granite Hill Road Reconstruction, Phase Ii.completed

    · $1M-$10M

  • Fy23 Shrine Project For Willamette Natlcompleted

    · $1M-$10M

  • Gaoa Road 13 Reconstructionunder construction

    · $1M-$10M

  • Maupin Work Site Renovationcompleted

    · $1M-$10M

  • Or Lookingglass Fh Intake, Fish Ladder, And Traveling Screenscompleted

    · $1M-$10M

  • Remodel Building 88 Clc Space, Construction Projectunder construction

    · $1M-$10M

  • The Project Consists Of Procurement, Delivery, And Placement Of Jetty Armor Stone. The Mandatory Work Includes Toe And Scompleted

    · $1M-$10M

  • (Umpqua National Forest)This Project Consists Installing An Asphalt Concrete Apron At The Transition Between Shoreview Dcompleted

    · Under $1M