Oregon · Division 23

HVAC projects in Oregon · page 4

Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 300 highest-priority scored Oregon projects, 292 need this division and 71 are still in planning or permitting.

As of 2026-11-03, 292 of the 300 highest-scored Oregon projects in the SpecIndex index need hvac, and 71 of those are still in planning or permitting.

Search the full index →

Showing 151–200 of 292 · page 4 of 6

  • Sp-Pol-Srm-Portland Iap. Or-Containment Fueling System Repairs W9128F21R0011 Rftop 83completed

    · $1M-$10M

  • The General Contractor Shall Provide All Labor, Materials, Equipment, Qualified Supervision, And Other Items To Completeunder construction

    · $1M-$10M

  • Umpqua Nf Office Buildingcompleted

    · $1M-$10M

  • Usfs Sisters Ranger District Administration Building Deschutes National Forest Sisters Ranger District Deschutes County,completed

    · $1M-$10M

  • Visn 20 Construction Idiq Matoc 653-19-100 Replace Building Hvac Systemcompleted

    · $10M-$50M

  • Warm Springs Detention Center Rehabilitation Centercompleted

    · $1M-$10M

  • Z--MT. ASHLAND (KMAX) NEXRAD ROOF REPLACEMENT

    View specs →
  • Cemetery Expansioncompleted

    · $1M-$10M

  • Con 653-25-104 Install Outdoor Pavilionscompleted

    · Under $1M

  • Construction Project To Add 6,500 Sq. Ft. And Minor Alterations For Bldg 235. Includes Exercised Option To Demolish Bldgunder construction

    · $1M-$10M

  • Construction Services For Project Or Dot 18(2), Or58 Fix-It Corridor Culvertscompleted

    · $1M-$10M

  • Construction Services For Project Or Fs Erfo 2020(1)-14(1), Walla Walla South - Umatilla Repairs 2020, Phase 1 & Wa Erfounder construction

    · $1M-$10M

  • Crazy Creek Fire Range Fence Reconstruction And Repair (Suppression Repair Work And Possible Bar)under construction

    · $1M-$10M

  • Esr Fence Repair & Install_Vale District, Orunder construction

    · $1M-$10M

  • Funding Construction Project Or Flap Grant 24(2), Granite Hill Road Reconstruction, Phase Ii.completed

    · $1M-$10M

  • Fy23 Shrine Project For Willamette Natlcompleted

    · $1M-$10M

  • Gaoa Road 13 Reconstructionunder construction

    · $1M-$10M

  • Gold Beach Ranger Station Roof Replacementsplanning

    Gold Beach

    View specs →
  • Maupin Work Site Renovationcompleted

    · $1M-$10M

  • Or Lookingglass Fh Intake, Fish Ladder, And Traveling Screenscompleted

    · $1M-$10M

  • Remodel Building 88 Clc Space, Construction Projectunder construction

    · $1M-$10M

  • Replace Building 65 Chillers At Roseburg Va Medical Centerunder construction

    · $1M-$10M

  • The Project Consists Of Procurement, Delivery, And Placement Of Jetty Armor Stone. The Mandatory Work Includes Toe And Scompleted

    · $1M-$10M

  • (Umpqua National Forest)This Project Consists Installing An Asphalt Concrete Apron At The Transition Between Shoreview Dcompleted

    · Under $1M

  • USCG ANT Coos Bay Power Pole Repair

    Charleston

    View specs →
  • 0614 (Uma) 54 Road Flood Repair Construction Phase 2under construction

    · $1M-$10M

  • 692-Csi-101 Mri Site Prepcompleted

    · $1M-$10M

  • Baker Fire Crew Quarters For Blm-Vale District Officecompleted

    · $1M-$10M

  • C--Hart Bar Concrete Project

    Plush

    View specs →
  • Construction Services On Wfl Project Or Flap Dot 126(1), Blue Pool Safety And Access Enhancement Project Includes Pavingcompleted

    · $1M-$10M

  • Gaoa Big Creek Aop Project Malheur National Forest Prairie City Ranger District Grant County, Orcompleted

    · $1M-$10M

  • Gaoa - Burns Junction Fire Guard Station Renovation For Blm Vale District Office, Oregoncompleted

    · $1M-$10M

  • Gaoa - This Project Consists Of All Work And Furnishing The Necessary Materials Relating To The Removal Of Existing Asphcompleted

    · $1M-$10M

  • Indefinite Delivery/Indefinite Quantity Single Award Task Order Contract For Construction Services At The Roseburg Hcs Icompleted

    · Under $1M

  • Lakeview Recreational Repairs, Blm-Lakeview District Office, Oregoncompleted

    · Under $1M

  • Lookingglass Fh - Egg Incubation Roomunder construction

    · $1M-$10M

  • Mcnary Hood Park Boat Ramp Parking Lot And Road Repavingunder construction

    · $1M-$10M

  • Mini Splits with Heat Pump for Cole M. Rivers Hatcheryplanning

    Trail

    View specs →
  • Or Erfo Fs Umpqu 615-2022-2(1), Umpqua Erfo Repairs 2022. Work Includes Repair Of Aggregate Roadway, Ditch Regrading, Mecompleted

    · Under $1M

  • Or Flap Crook 123(1), Ochoco Ranger Station Road Overlay Hot Asphalt Concrete, Shoulder Aggregate, Asphalt Milling, Raiscompleted

    · $1M-$10M

  • Or-Klamath Falls Fwo-Phase 5 Constructionunder construction

    · $1M-$10M

  • Or Union 101(1) North Powder River Lane Reconstruction. This Work Consists Of: Subgrade Repair, Full Depth Reclamation,completed

    · $1M-$10M

  • Pendleton, Deferred Maintenance Project A, Project Includes The Partitioning And Insulation Of A Portion Of Building 002under construction

    · Under $1M

  • Rehabilitate Freight Elevatorcompleted

    · $1M-$10M

  • Rehabilitate Visitor Facilities At North Junction Viewpoint For Safety And Resource Protection, Crater Lake National Parunder construction

    · $1M-$10M

  • Repair Subgrade Failures On Nfsr 73 Road Asphalt Subgrade Repairsunder construction

    · Under $1M

  • The 31 Road Is A Main Paved Road With High Speeds Of Travel. During The Falls Fire, The Asphalt Road Surface Degraded Siunder construction

    · Under $1M

  • The Work Covered Under This Specification Includes The Installation Of A New Instrument Landing System (Ils) And Fiber Ocompleted

    · $1M-$10M

  • This Is A Construction Requirement For The Repair Of 3 Sites With Slide Failures Of The Road Embankment And/Or Ground. Pcompleted

    · $1M-$10M

  • Visn 20 Construction Idiq Matoccompleted

    · $1M-$10M