Pennsylvania · Division 03
Concrete projects in Pennsylvania
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Pennsylvania projects, 24 need this division and 1 are still in planning or permitting.
As of 2026-11-03, 24 of the 300 highest-scored Pennsylvania projects in the SpecIndex index need concrete, and 1 of those are still in planning or permitting.
Search the full index →- Sopaf Site A Is To Construct A New Addition To The Existing Security And Pedestrian Access Building To Improve Daily Opeplanning
· $10M-$50M
- The Purpose Of This Task Order Is To Provide Funding In The Amount Of $15,000,000.00 For The Nsmv Vii (Mriv Ii) Build Slunder construction
· $10M-$50M
- The Contractor, Through This Task Order, Is Hereby Ordered To Perform Design-Phase Oversight And Management For The Nsmvunder construction
· $10M-$50M
- Dewa 310424 325752 324741 - Safety And Pavement Improvements To Route 209 & Mcdade Trail - Delaware Water Gap National Runder construction
· $10M-$50M
- Ehrm Infrastructure Upgrades Construction Philadelphia, Paunder construction
· $10M-$50M
- Errc - Creek Bed Restoration - Tim Toalunder construction
· $1M-$10M
- Ncota 3B Completion Project To Complete Phase 3 Punch List Itemsunder construction
· $1M-$10M
- Eo 14398 Independence National Historical Park (Inde) Merchants' Exchange Building Block Hvac And Fire System Replacemenunder construction
· $1M-$10M
- Elevator Upgrades Bed Tower Pittsburghunder construction
· $1M-$10M
- Hazleton Logistics 141 Building 5, Hazletonunder construction
Hazleton · $100M+
- Eo 14398 Edgar Allan Poe National Historic Site (Edal) - Poe House Repair Exterior Wall And Repair Interior Finishes, Anunder construction
· Under $1M
- Pasture Systems & Watershed Management Research Unit Greenhouse #2 Modernizationunder construction
· $1M-$10M
- View specs →Construction Manager As Constructor (Cmc) For The U.S. Courthouse In Harrisburg, Pennsylvaniacompleted
· $100M+
- Rehab Hemlock Rd & Visitor Ctr Parking Lot (Allegheny Nfh)under construction
· $1M-$10M
- Pa Erfo Np Dewa 2021-1(1) The Project Consists Of Removing Existing Asphalt Pavement, Convert Existing Gravel Base Courunder construction
· Under $1M
- Slate Run, Pa - Slt Vor Roof Replacement In Slate Run, Pa In Accordance With The Sow And Drawings.under construction
· Under $1M
- Site Replacement At The Philipsburg (Psb), Pa Rcag With The Sow And Drawings.under construction
· $1M-$10M
- Construct 7 Foot High Deer Enclosure Fencing On Designated Forested Units Of The Allegheny National Forest.completed
· Under $1M
- Eo 14398 Friendship Hill National Historical Site - Gallatin House Structural Assessment And Stabilization And Removal Aunder construction
· $1M-$10M
- Repair Bent Rail At Switch 53A (Nsa-M - Navsup Wss)under construction
· Under $1M
- Grey Towers National Terrace & Walkways Preservation Construction, Grey Towers National Historic Site, Pennsylvania (Gaounder construction
· Under $1M
- New River Chamber At Montgomery Locks & Damunder construction
· $100M+
- Design-Build Construction Services To Demo And Rebuild Maintenance Building Destroyed By Fire.under construction
· $1M-$10M
- Igf::Ot::Igf Construction Of The Charleroi Locks And Dam River Chamber Completion, Monongahela River, Pacompleted
· $100M+