Pennsylvania · Division 03
Concrete projects in Pennsylvania
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Pennsylvania projects, 224 need this division and 8 are still in planning or permitting.
Search the full index →- View specs →Hazleton Logistics 141 Building 5, Hazletonunder construction
Hazleton · $100M
- View specs →Sopaf Site A Is To Construct A New Addition To The Existing Security And Pedestrian Access Building To Improve Daily Opeplanning
· $10.9M
- View specs →Eo 14398 Friendship Hill National Historical Site - Gallatin House Structural Assessment And Stabilization And Removal Aunder construction
· $1.0M
- View specs →Site Replacement At The Philipsburg (Psb), Pa Rcag With The Sow And Drawings.under construction
· $3.8M
- View specs →Grey Towers National Terrace & Walkways Preservation Construction, Grey Towers National Historic Site, Pennsylvania (Gaounder construction
· $380,296
- View specs →562-26-307 Replace Subbasement Drain Pipecompleted
· $105,000
- View specs →Design-Build Construction Services To Demo And Rebuild Maintenance Building Destroyed By Fire.under construction
· $3.4M
- View specs →Anf Fr154 Farnsworth Bridge Replacementunder construction
· $800,102
- View specs →Reconstruction Of Forest Service Roads 212 (Muzette), 486 (Furnace) Replacement Of Culverts, Base And Surface Stone Placunder construction
· $167,503
- View specs →Alf-Prather Run Road Reconstructionunder construction
· $130,692
- View specs →John Heinz Nwr, Pa - Repair Of Levee Systemunder construction
· $7.0M
- View specs →Rtr Full Site Replacement (Two Climb-Up Free-Standing Towers, Shelter, Fence Extension, Etc.), Reading, Pa. In Accordancunder construction
· $994,025
- View specs →Repair/Rehab Washington Hq At Vafounder construction
· $1.4M
- View specs →New River Chamber At Montgomery Locks & Damunder construction
· $806.8M
- View specs →The Contractor Shall Provide All Labor, Equipment, Material, Protection, Safety, Barriers, Tools And Supervision At Middunder construction
· $6.4M
- View specs →Dla Ddsp Electrical Upgradesunder construction
· $73.1M
- View specs →Igf::Ot::Igf Construction Of The Charleroi Locks And Dam River Chamber Completion, Monongahela River, Pacompleted
· $283.6M
- View specs →Letterkenny Army Depot (Lead) Access Control Point (Acp), Chambersburg, Pennsylvania.under construction
· $32.3M
- View specs →Construction Manager As Constructor (Cmc) For The U.S. Courthouse In Harrisburg, Pennsylvaniacompleted
· $169.9M
- View specs →Shenango River Lake Ranger Station Building Siding Replacement.under construction
· $82,500