PR · Division 21
Fire Suppression projects in PR · page 5
Sprinklers, ESFR, deluge, fire protection. Usually specified by the fire protection engineer. Counted across our 300 highest-priority scored PR projects, 207 need this division and 174 are still in planning or permitting.
As of 2026-11-03, 207 of the 300 highest-scored PR projects in the SpecIndex index need fire suppression, and 174 of those are still in planning or permitting.
Search the full index →Showing 201–207 of 207 · page 5 of 5
- View specs →J041--Tier Evaluation: PM Building Automation Services
San Juan
- View specs →J045--Deaerator PM and Integrity Assessment
San Juan
- View specs →J045--FY22: Boilers Preventive Maintenance and Testing at VACHS- Tiered Evaluation
San Juan
- View specs →J045--FY22:Water Tanks Cathodic Protection System Repair
San Juan
- View specs →J045--FY23: Deaerator Condensate Return Tank PM-Inspection
San Juan
- View specs →J045--SERVICES: Boiler #3 Annual Maintenance and Testingplanning
San Juan
- View specs →J080--Emergency Deployable Assets Paint Restoration
San Juan