South Carolina · Division 26
Electrical projects in South Carolina · page 2
Lighting, switchgear, generators, distribution. Usually specified by the electrical engineer. Counted across our 300 highest-priority scored South Carolina projects, 217 need this division and 116 are still in planning or permitting.
As of 2026-11-03, 217 of the 300 highest-scored South Carolina projects in the SpecIndex index need electrical, and 116 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 217 · page 2 of 5
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- Construction Services To Replace Dental Clinic With Back Up Power To Support Recruits And Active-Duty Members At The Mcrunder construction
· $50M-$100M
- Design And Construct Connections Of 3 Mobile Home Park Water Distribution Systems To The High Hills Rural Water Company under construction
· $1M-$10M
- View specs →Y1DZ--Renovate B3-EHRM Training and Admin Space Project 544 22 703 EHRM Construction 6439 Garner's Ferry Rd. Columbia VA
Columbia
- Design-Build Utility Infrastructure, Roads & Clinic At United States Coast Guard (Uscg) Base Charleston Charleston, Scunder construction
· $100M+
- Srs Tritium Administration Building Constructionunder construction
· $10M-$50M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, NEW MIXED USE permitting
· $10M-$50M
- Design/Build Construction For Charleston Pier Mike Recapitalization, Uscg Base Charleston, South Carolinaunder construction
· $100M+
- Myrtle Beach, Sc - Rtr Tower Replacements In Myrtle Beach, Sc In Accordance With The Sow And Drawings.under construction
· $1M-$10M
- View specs →P502 Replace MCAS Beaufort Fuel Pier, Marine Corps Air Station Beaufort, South Carolina
Beaufort
- To Complete The Renovation Construction Project At The Columbia Va Medical Center For The Ehrm Training And Admin Space under construction
· $1M-$10M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- View specs →Georgetown Airport Threat Emitter Operating Sites and Maintenance Location
· $1M-$10M
- 11954/11955 Hot Water Boilerunder construction
· $1M-$10M
- 4T Satoc Fj To B2302 Repl Pot And Pancompleted
· Under $1M
- Antenna Tower Replacement At The Flo Rtr Site In Florence, Sc In Accordance With The Sow And Drawings.under construction
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- View specs →HVAC Replacement Greer South Carolina
Greer
- P-502 Replace Fuel Pier Marine Corps Air Station Beaufort, Scunder construction
· $10M-$50M
- View specs →Repair Flight Simulator Facility, B108
Charleston AFB
- View specs →Repair HVAC Base Wideunder construction
EASTOVER
- View specs →Repair Maintenance Facility B532
Charleston AFB
- View specs →Repair MX Dock B578 and IMC Pavements Area F
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, ALTERATION permitting
· $1M-$10M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, NEW OTHER permitting
· Under $1M
- Repair Hvac Controls B10405/6/7under construction
· $1M-$10M
- RESIDENTIAL, NEW FIVE OR MORE FAMILY permitting
· $1M-$10M
- Sc Waccamaw Nwr Rice Trunks Repairunder construction
· Under $1M
- Y810 Procurement Warehouse Construction At Savannah River Site, Sc Naics Code Is 236220, Commercial And Institutional Bunder construction
· $10M-$50M
- Cmb To 11950 - Chiller Rpr, Ahu Rpr, Boiler Rprcompleted
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- COMMERCIAL, ALTERATION permitting
· Under $1M
- Construct Reception Complex Phase 2 At Ft. Jackson, Scunder construction
· $100M+
- Design Build Charleston Pier Papa Recapitalization, Uscg Base Charleston, Charleston Scunder construction
· $100M+
- View specs →FY 26 NNPTC Mural Protectors Installation Service, Joint Base Lindsey Graham (JB LG), SC
Charleston AFB
- Sp-Pol-Cmp-Repair-Fy24-Shw Fac 9073under construction
· $1M-$10M
- Award Of Design Build Of Sector Charleston Construct Consolidated Admin Facility, Uscg Base Charleston, Charleston, Scunder construction
· $50M-$100M
- Base: Construction Reception Complex Phase Icompleted
· $50M-$100M
- View specs →Bldg 1947 Repair Drop Arms
Shaw AFB
- Chs Tracon - Constructionunder construction
· $50M-$100M
- COMMERCIAL, ALTERATION permitting
· $1M-$10M