US · Division 26
Electrical projects in US · page 2
Lighting, switchgear, generators, distribution. Usually specified by the electrical engineer. Counted across our 300 highest-priority scored US projects, 300 need this division and 3 are still in planning or permitting.
As of 2026-11-03, 300 of the 300 highest-scored US projects in the SpecIndex index need electrical, and 3 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 300 · page 2 of 6
- Dodea Pa00199, Replace Kubasaki High School, Camp Foster, Okinawa, Japan.under construction
· $100M+
- Fy25 Znre224305P2 Improve Military Family Housing Paip 9 Phase 2, Yokota Air Base, Japanunder construction
· $10M-$50M
- Matoc Work Plan Contractors Korea-Wide General Construction For Lcs Project. Repair Failed Elevators On Airmen Dormitoriunder construction
· $1M-$10M
- N40084-21-D-0069 / To N4008426F4404; Design Build To Replace Underground Drainage Piping And Associated Work At Buildingunder construction
· $1M-$10M
- Procurement, Modification, Transport, Installation, And Activation Of A Minimum Of 65 Containerized Housing Units (Chus)completed
· $1M-$10M
- Rightsize Army Family Housing (Afh) Bldg. 8034, 8037, 8056 Smith Barracks, Baumholder, Germanyunder construction
· $10M-$50M
- The Contractor Shall Provide Professional Engineering Services In Support Of The Lilongwe, Malawi New Embassy Compound under construction
· $1M-$10M
- //This Is A Contract Executed Under The Host Nation Abg75 Construction Program. Acws Version For Electronic Accountabilunder construction
· $1M-$10M
- Waterborne Operations Facility At The Harioshima Ammo Storage Area, Sasebo, Japan (Eproject#1856682)under construction
· $1M-$10M
- Yerevan Consular Densification Projectunder construction
· $1M-$10M
- Ch-47 Bed Down Facilities And Infrastructure, Egypt.under construction
· $10M-$50M
- Clean Up Hvac Systems And Exhaust Ducts In Bldg. 1603, 1604 And Pw63 At The U.S. Fleet Activities, Sasebo, Japanunder construction
· $1M-$10M
- Construct Covered Access Control Point Structures At Gate 4, Usag Italy, Dmc, Removing Existing Tents.under construction
· Under $1M
- Construct/Install A New 154/10Kv Main Electrical Transformer Substation (Ts) On Incirlik Air Base (Iab) Including Oetl, under construction
· $10M-$50M
- Construction Services To Dismantle Bridge And Construct An Ada Compliant Ramp & Staircase For The Us Embassy In Jerusaleunder construction
· Under $1M
- Dental Clinicunder construction
· $1M-$10M
- Design And Construction Of Nec Permanent Power Infrastructure At U.S. Embassy Brasilia, Brazil.under construction
· Under $1M
- Facj-Replace The Intercom System In Consular Section-Launder construction
· Under $1M
- Funding Is To Award A New Task Order Providing One Site Security Coordinator (Ssc) (May1, 2026 Dec 31, 2026) And One Cunder construction
· Under $1M
- Milcon Project P-720 Edi: Missile Magazines, Naval Station (Navsta) Rota, Spainunder construction
· $50M-$100M
- Munitions Storage Area (Msa) At Powidz Air Base, Poland. Construction Of 56 Earth Covered Magazines (Ecms) With Supportiunder construction
· $100M+
- Project To Extend E-Ramp Pavement Outward Towards Taxiway November Iaw Statement Of Work.under construction
· $1M-$10M
- Replace Instrument Landing System Support Structureunder construction
· Under $1M
- The U.S. Army Corps Of Engineers (Usace), Middle East District, Has A Requirement For Design-Bid-Build Construction Servunder construction
· $50M-$100M
- //This Is A Contract Executed Under The Host Nation Abg75 Construction Program. Acws Version For Electronic Accountabilunder construction
· $1M-$10M
- Usa Pavilion Full Design & Fit-Out Construction, Exhibit Design, Procurement, Installation And Commissioning At Belgradeunder construction
· $10M-$50M
- 570000 Demolition Of Building 4209, Mainz-Kastel Station, Germanyunder construction
· Under $1M
- Additional Services Mca-Fundedunder construction
· $100M+
- ---------- Comments: Please Resubmit Once Revised Action Memo And Rfca Are Fully Cleared. Cor: Daniel Replogle Contraunder construction
· $100M+
- Construction Of A Wharf. Harbormaster Control Tower, Piers, Maintenance/Fueling Facilities & Infrastructure In Support Ounder construction
· $100M+
- Construction Services For The New Embassy Compound In New Delhi, India.under construction
· $100M+
- Design And Build Construction Of New Office Annex&Chancery Renovation In Bangkok, Thailandunder construction
· $100M+
- Design And Construction Of The New Embassy Compound Located In Juba, South Sudan.under construction
· $100M+
- Design-Bid-Build Construction Of F-18 Super Hornet Procurement E, Package 007 - Engine Shop, Package 008 Airframes Shop under construction
· $1M-$10M
- Design Build Construction Of The Lagos New Consulate Compound.under construction
· $100M+
- Design-Build Services For A New Controlled Access Area (Caa) - Us Embassy Nairobi, Kenyaunder construction
· $100M+
- Falcon 5/F-15 Bed Down Program State Of Qatarunder construction
· $100M+
- Fy23 Mcon P-923 Aircraft Parking Apron, Royal Australian Air Force Base, Darwin, Australiaunder construction
· $100M+
- The Purpose Of This Award Is To Provide Construction Services For A New Embassy Compound In Brasilia Brazil.under construction
· $100M+
- The Work To Be Performed Will Be In Accordance With The Statement Of Work (Sow), Set Forth As Attachment 1 Entitled Modeunder construction
· $1M-$10M
- All Work To Construct The New Embassy Complex (Nec) In Asuncion, Paraguay, Including Early Site-Work, Facility Relocatiocompleted
· $100M+
- Construction Services For New Embassy Compound (Nec) In Tegucigalpa, Honduras.completed
· $100M+
- Design And Construction Services For A New Embassy Compound In Praia, Capo Verde.under construction
· $100M+
- Design And Construction Services For New Embassy Compound In Port Louis, Mauritius.under construction
· $100M+
- Design-Bid-Build Construction Services For The Athens Compound Major Rehab In Greece.Igf::Ot::Igfunder construction
· $100M+
- Design-Build Construction Of Casablanca New Consulate Compound Project In Casablanca, Morocco.completed
· $100M+
- Design Build Construction Of The Doha New Embassy Compoundunder construction
· $100M+
- Design / Build Floating Dockunder construction
· Under $1M
- Design/Build New Embassy Compound In Port Of Spain, Trinidad And Tobagounder construction
· $100M+
- Design-Build Services For New Consulate Compound, Guadalajara, Mexicocompleted
· $100M+