Virginia · Division 03

Concrete projects in Virginia · page 2

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Virginia projects, 110 need this division and 48 are still in planning or permitting.

As of 2026-11-03, 110 of the 300 highest-scored Virginia projects in the SpecIndex index need concrete, and 48 of those are still in planning or permitting.

Search the full index →

Showing 51–100 of 110 · page 2 of 3

  • Giant Food 229 Remodelpermitting

    Springfield · Under $1M

  • McDonald's Annandalepermitting

    Annandale · $1M-$10M

  • P1062 Design-Bid-Build, Dry Dock 3 Modernization, Norfolk Naval Shipyard, Portsmouth Va.under construction

    · $100M+

  • Project Number 863-Nsp26-003 National Shrine Project At Mound City National Cemeteryunder construction

    · $1M-$10M

  • TACO BELLpermitting

    Vienna · Under $1M

  • Third Option Year - Idiq Contract No. 19Ge5023D0048 - Design/Build Construction Services, Potable Water And Wastewater Tplanning

    · Under $1M

  • Third Option Year Idiq Contract No. 19Ge5023D0049 - Design/Build Construction Services, Potable Water And Wastewater Tplanning

    · Under $1M

  • Architecture And Engineering Services To The Enroute Facilities Modernization Program.under construction

    · $100M+

  • B1510 Replace C-Wing Chillerunder construction

    · Under $1M

  • Bazaar Food Wholesale // Suite 400permitting

    Chantilly · Under $1M

  • Conduit And Cat 6 Cabling Installation At The Central Virginia Va Health Care System.under construction

    · Under $1M

  • Costco - Tire Center Additionpermitting

    Chantilly · $1M-$10M

  • DLA PIPER/ #300permitting

    Reston · Under $1M

  • East Side Demolition B644, 645, 645A, 646.under construction

    · $1M-$10M

  • Floor & Decor - Fairfax Countypermitting

    Fairfax · $1M-$10M

  • Grazie Nonna/ Grazie Graziepermitting

    Reston · $1M-$10M

  • Igf::Ot::Igf This Project Consists Of The Permanent Rehabilitation Of The Concrete Approach Spans And Replacement Of Thecompleted

    · $100M+

  • JPMC - Great Falls Walker Roadpermitting

    Great Falls · $1M-$10M

  • P-095 Construction Of Pier 3under construction

    · $100M+

  • P-1069, Maritime Surveillance System Facilityunder construction

    · $50M-$100M

  • P-678, Dry Dock 8 Saltwater Systemcompleted

    · $100M+

  • RANGE FINANCE- 7TH FLOORpermitting

    Mclean · Under $1M

  • Rees Broome, PC / Phase 2 #700permitting

    Vienna · Under $1M

  • Repair Taxiway Pavements, Nas Oceanaunder construction

    · $100M+

  • Skyzone Chantilly/ #1230permitting

    Fairfax · $1M-$10M

  • Tesla - Springfieldpermitting

    Springfield · $1M-$10M

  • The Primary Objective Of This Task Order Is To Conduct Pre-Demolition Characterization And Planning For The Future Demolunder construction

    · Under $1M

  • The Purpose Of This Contract Is For Arctic Peak Llc To Design, Build, And Install Active Vehicle Barriers (Avbs) And Pasunder construction

    · $1M-$10M

  • Tre Contractor Shall Provide (Tpc) Services In Support Of The Riyadh New Embassy Compound Project And Provides Funding Funder construction

    · Under $1M

  • Tyson's Core & Shell Renovation Phase 5permitting

    Mclean · $1M-$10M

  • #104/ The American Red Cross - Tenant Demising Projectpermitting

    Fairfax · Under $1M

  • ARC reduction, including Suites 211, 202B, and 206permitting

    Fairfax · Under $1M

  • Boardwalk Construction At Parking Lot A1 - Chincoteague Nwr, Vacompleted

    · Under $1M

  • BRIGHTON/ #N102Bpermitting

    Fairfax · Under $1M

  • Chantilly Premierpermitting

    Chantilly · $50M-$100M

  • Construction Of The Battalion Complex Operations Building (Phase 2) And Hangar Facility (Phase 3) At (Jeb) Eustis-Langlecompleted

    · $100M+

  • Design-Bid-Build, National Foreign Affairs Training Center (Nfatc) Building B, Arlington, Vacompleted

    · $100M+

  • Design-Build Construction Of The Second Phase Of The Offshore Patrol Cutter (Opc), Electronic And Propulsion Control Sysunder construction

    · $10M-$50M

  • Design-Build (Db), Sof Sdvt2 Operations Support Facility Little Creek-Fort Story Will Include The Design/Construction Ofunder construction

    · $50M-$100M

  • Design-Build Demolition Of Building 195 Located At Norfolk Naval Shipyard, Portsmouth, Virginiaunder construction

    · $10M-$50M

  • ELMS DUNN LORING ABOVE PODIUM CORE AND SHELLpermitting

    Fairfax · $10M-$50M

  • Elms Mount Vernon bldg 1 core/shellpermitting

    Alexandria · $50M-$100M

  • Future tenant/ #102permitting

    Fairfax · Under $1M

  • Future tenant Suite 280 on 2nd FL.permitting

    Fairfax · Under $1M

  • Igf::Ot::Igf P-913 Communication Center, Naval Station Norfolk, Vacompleted

    · $100M+

  • Jones Group International/ 15th FLpermitting

    Vienna · Under $1M

  • Nando's Fairfaxpermitting

    Fairfax · Under $1M

  • Norfolk Naval Shipyard Triplex And Building 163 Repairsunder construction

    · $100M+

  • North Section Rehabilitation Of George Washington Memorial Highway- The Project Consists Of The Reconstruction Of Approxunder construction

    · $100M+

  • Np-Colo 1A21, B42, C18, D51 - The Project Consists Of The Rehabilitation Of Approximately 10.3 Miles Of The Colonial Parunder construction

    · $100M+