Virginia · Division 07

Thermal and Moisture Protection projects in Virginia · page 5

Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Virginia projects, 262 need this division and 189 are still in planning or permitting.

As of 2026-11-03, 262 of the 300 highest-scored Virginia projects in the SpecIndex index need thermal and moisture protection, and 189 of those are still in planning or permitting.

Search the full index →

Showing 201–250 of 262 · page 5 of 6

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ALEXANDRIA CROSSINGpermitting

    Alexandria · Under $1M

  • ARC reduction, including Suites 211, 202B, and 206permitting

    Fairfax · Under $1M

  • Boardwalk Construction At Parking Lot A1 - Chincoteague Nwr, Vacompleted

    · Under $1M

  • BRIGHTON/ #N102Bpermitting

    Fairfax · Under $1M

  • Chantilly Premierpermitting

    Chantilly · $50M-$100M

  • Construction Of The Battalion Complex Operations Building (Phase 2) And Hangar Facility (Phase 3) At (Jeb) Eustis-Langlecompleted

    · $100M+

  • DEBRE KERBE KIDIST MARIAM WETSADIK Churchpermitting

    Herndon · Under $1M

  • Design-Bid-Build, National Foreign Affairs Training Center (Nfatc) Building B, Arlington, Vacompleted

    · $100M+

  • Design-Build Construction Of The Second Phase Of The Offshore Patrol Cutter (Opc), Electronic And Propulsion Control Sysunder construction

    · $10M-$50M

  • Design-Build (Db), Sof Sdvt2 Operations Support Facility Little Creek-Fort Story Will Include The Design/Construction Ofunder construction

    · $50M-$100M

  • Design-Build Demolition Of Building 195 Located At Norfolk Naval Shipyard, Portsmouth, Virginiaunder construction

    · $10M-$50M

  • Dominion Plastic Surgery / #200permitting

    Falls Church · Under $1M

  • ELMS DUNN LORING ABOVE PODIUM CORE AND SHELLpermitting

    Fairfax · $10M-$50M

  • Elms Mount Vernon bldg 1 core/shellpermitting

    Alexandria · $50M-$100M

  • FASTC Barrier Replacement

    Blackstone

    View specs →
  • Fire Alarm Upgrade

    Alexandria

    View specs →
  • Flooring

    Alexandria

    View specs →
  • Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS battery

    View specs →
  • Future tenant/ #102permitting

    Fairfax · Under $1M

  • Future tenant Suite 280 on 2nd FL.permitting

    Fairfax · Under $1M

  • Headquarters Annexunder construction

    · $100M+

  • HQ Annex, Fort Belvoir North Area, Springfield, VAunder construction

    Fort Belvoir · $100M+

  • Igf::Ot::Igf P-913 Communication Center, Naval Station Norfolk, Vacompleted

    · $100M+

  • INSCOM SAOF Phase 4 Renovation, Fort Belvoir, VAunder construction

    Fort Belvoir · $100M+

  • Jones Group International/ 15th FLpermitting

    Vienna · Under $1M

  • MUNS MSA Gate

    Langley AFB

    View specs →
  • Nando's Fairfaxpermitting

    Fairfax · Under $1M

  • NATO Business Opportunity: Minor Construction Framework for Headquarters Supreme Allied Commander Transformation (Norfolplanning

    Norfolk

    View specs →
  • Norfolk Naval Shipyard Triplex And Building 163 Repairsunder construction

    · $100M+

  • North Section Rehabilitation Of George Washington Memorial Highway- The Project Consists Of The Reconstruction Of Approxunder construction

    · $100M+

  • Np-Colo 1A21, B42, C18, D51 - The Project Consists Of The Rehabilitation Of Approximately 10.3 Miles Of The Colonial Parunder construction

    · $100M+

  • NVR Headquarters/ 4th flpermitting

    Reston · $1M-$10M

  • OneLife Fitness @ District Ave/ 2nd & 3rd flpermitting

    Fairfax · $1M-$10M

  • P1334 CHILD DEVELOPMENT CENTERunder construction

    Norfolk · $10M-$50M

  • P1334 Child Development Center At Nsa Hampton Roadsunder construction

    · $10M-$50M