Washington · Division 21
Fire Suppression projects in Washington · page 2
Sprinklers, ESFR, deluge, fire protection. Usually specified by the fire protection engineer. Counted across our 300 highest-priority scored Washington projects, 82 need this division and 69 are still in planning or permitting.
As of 2026-11-03, 82 of the 300 highest-scored Washington projects in the SpecIndex index need fire suppression, and 69 of those are still in planning or permitting.
Search the full index →Showing 51–82 of 82 · page 2 of 2
- View specs →Demolition of student housing apartment (UW Blakeley Village Bldg. D) per planpermitting
SEATTLE · $100M+
- View specs →Demolition of student housing apartment (UW Blakeley Village Bldg. F) per planpermitting
SEATTLE · $100M+
- View specs →Demolition of student housing apartment (UW Blakeley Village Bldg. H) per plancompleted
SEATTLE · $100M+
- View specs →Demolition of student housing apartment (UW Blakeley Village Bldg. J) per plancompleted
SEATTLE · $100M+
- View specs →Phased project: Construction of residential/retail high rise building occupy per plan.permitting
SEATTLE · $100M+
- 2601 ELLIOTT AVEpermitting
· $50M-$100M
- View specs →Emerson Kunkle Safety Valveplanning
Pullman · $100M+
- View specs →Mueller Cast Iron Screwed End Y Strainersplanning
· $100M+
- Upgrade Ahu 09 And 15 Mechanical Systems At The Mann-Grandstaff Va Medical Center.under construction
· $1M-$10M
- View specs →Watson McDaniel Pressure Reducing Valveplanning
Pullman · $100M+
- Demolish institutional building [UW CHEMISTRY LIBRARY] per plan.permitting
SEATTLE · $100M+
- 3919 18TH AVE Wpermitting
· $1M-$10M
- 452 N 36TH STpermitting
· $10M-$50M
- 452 N 36TH STpermitting
· $10M-$50M
- View specs →663-21-101 Nurse Call Replacement
Seattle
- Change two levels of tower from office to multi-family per the land use code. Construct alterations for same in portion of a mixed-use building occupy per plan. (Mechanical included this permit)permitting
SEATTLE · $1M-$10M
- Phased project: Construct mixed use apartment building occupy per plan. Mechanical included.permitting
SEATTLE · $10M-$50M
- Puget Sound Va Medical Center In Washington State- Nrm Constructions Halls & Walls Canteen Refresh.under construction
· Under $1M
- 3700 S GENESEE STpermitting
· $10M-$50M
- Amazon Distribution Center, Chehalisunder construction
Chehalis · $1M-$10M
- View specs →AMD 0001 Fort Simcoe Server Room HVAC
White Swan
- View specs →Amendment 0001 to Replace Parking Lot Lighting at Seattle Air Traffic Facility
Auburn
- View specs →Construct a Hot Refueling System at Gray Army Airfield (GAAF), JBLM, WA
TACOMA
- View specs →Control Room Ramp Railings Replacement Project at FAA's Air Route Traffic Control Center (ARTCC) in Auburn, Washington
Auburn
- View specs →Department of Veteran’s Affairs American Lake (VAAL) Phase 2A Site Development at Lakewood, WAunder construction
Lakewood
- View specs →Fort Simcoe Server Room HVAC
White Swan
- View specs →Ft. Simcoe Job Corps Center Server Room HVAC
White Swan
- View specs →Little Goose DC System and LV Switchgear Upgrades
Starbuck
- 370 THOMAS STpermitting
· $10M-$50M
- 370 THOMAS STpermitting
· $10M-$50M
- Construct alterations to renovate historic Seattle Center Monorail Station per plan. Mechanical work included this permit.permitting
SEATTLE · $10M-$50M
- PHASED PROJECT: Construct mixed-use apartment building with below-grade parking occupy per plan. Mechanical included with Phase 2.permitting
SEATTLE · $50M-$100M