Washington · Division 08
Openings projects in Washington · page 2
Glazing, curtain wall, storefront, doors, hardware. Usually specified by the architect. Counted across our 300 highest-priority scored Washington projects, 58 need this division and 51 are still in planning or permitting.
As of 2026-11-03, 58 of the 300 highest-scored Washington projects in the SpecIndex index need openings, and 51 of those are still in planning or permitting.
Search the full index →Showing 51–58 of 58 · page 2 of 2
- View specs →AMD 0001 Fort Simcoe Server Room HVAC
White Swan
- View specs →Amendment 0001 to Replace Parking Lot Lighting at Seattle Air Traffic Facility
Auburn
- View specs →Construct a Hot Refueling System at Gray Army Airfield (GAAF), JBLM, WA
TACOMA
- View specs →Control Room Ramp Railings Replacement Project at FAA's Air Route Traffic Control Center (ARTCC) in Auburn, Washington
Auburn
- View specs →Department of Veteran’s Affairs American Lake (VAAL) Phase 2A Site Development at Lakewood, WAunder construction
Lakewood
- View specs →Fort Simcoe Server Room HVAC
White Swan
- View specs →Ft. Simcoe Job Corps Center Server Room HVAC
White Swan
- View specs →Little Goose DC System and LV Switchgear Upgrades
Starbuck