Wisconsin · Division 07
Thermal and Moisture Protection projects in Wisconsin · page 2
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Wisconsin projects, 177 need this division and 132 are still in planning or permitting.
As of 2026-11-03, 177 of the 300 highest-scored Wisconsin projects in the SpecIndex index need thermal and moisture protection, and 132 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 177 · page 2 of 4
- Gaoa-(Cnf) Signature Site Boulder Campground Shower House Rehabunder construction
· Under $1M
- View specs →36C77623C0065 - EHRM Infrastructure Upgrades - Madison, WI - Award Noticeunder construction
Madison · $10M-$50M
- View specs →Fort McCoy, WI - Collective Training Officers Quartersunder construction
Fort McCoy · $10M-$50M
- View specs →Blackwell Job Corps Center Multiple Building Fire Alarm Replacement
Laona
- View specs →Flooring IDIQ Fort McCoy WIdeadline not recorded
Fort McCoy
- View specs →Ft McCoy Training Barracks
- View specs →Renovate Buildings 2657 and 2659, Fort McCoy, WIdeadline not recorded
Fort McCoy
- View specs →Upgrade Wiring for Forklift Charger B200, Fort McCoy, WI
Fort McCoy
- View specs →Z1DA--676-21-201 Replace Patient Lifts in Five Locations (VA-21-00061892)
- View specs →Z1DA--Upgrade Plumbing for Legionella Prevention Project 695-19-114
- View specs →NRS Rhinelander Vinyl Flooring Replacement
Rhinelander
- 823Cm3024 Renovate Roads And Fca Corrections At Wood National Cemeteryunder construction
· $1M-$10M
- Commercial Alteration Permit — 100 E WISCONSIN AVpermitting
Milwaukee · $10M-$50M
- View specs →CANCELED - USDA Dairy Forage Research Center (DFRC)
Prairie du Sac
- Commercial New Construction Permit — 2851 N HOLTON STpermitting
Milwaukee · $1M-$10M
- Plant To Above Fisher Island, Approximate Mississippi River Mile 745.8 And Begin Dredging/Excavation. Material Shall Be completed
· Under $1M
- View specs →ADD/ ALTER (ADAL) FIRE CRASH RESCUE STATION BLDG 510
Camp Douglas
- View specs →Blackwell Job Corps center Water Heater Replacement
Laona
- Commercial Alteration Permit — 1220 W VLIET STpermitting
Milwaukee · $10M-$50M
- Commercial Alteration Permit — 2360 N 52ND STpermitting
Milwaukee · $1M-$10M
- View specs →F-35 ADD/ALTER SQUADRON OPERATIONS 404under construction
Madison
- View specs →FSL Rhinelander Headhouse Roof Replacement
Rhinelander
- View specs →Manitowoc FFR ARMY Reserve Center Design Build Renovations Solicitation
Manitowoc
- View specs →Replacement of Two Air Handler Unit (AHU) Coils at AHU 1planning
Madison
- View specs →Replace Steam Line- FCI Oxford
Oxford
- View specs →Roof Replacement
Madison
- View specs →Transient Training Brigade Headquarters, Ft. McCoy, WIunder construction
Fort McCoy
- View specs →Y1AZ--939-MM20-011: Restroom, Storage and Wind Wall, Northwoods National Cemetery
Harshaw,
- View specs →Y1DZ--695-22-114 Replace Fire Alarm Activation Devices (VA-22-00027439)
Milwaukee
- View specs →Y1DZ--EHRM Training and Admin Space Support Construction – Milwaukee, WI 695-21-703deadline not recorded
Milwaukee
- Commercial Alteration Permit — 2708 W WISCONSIN AVpermitting
Milwaukee · $10M-$50M
- Commercial Alteration Permit — 324 N 15TH STpermitting
Milwaukee · $1M-$10M
- Commercial Alteration Permit — 3275 N 3RD STpermitting
Milwaukee · $1M-$10M
- Commercial Alteration Permit — 5300 S HOWELL AVpermitting
Milwaukee · $1M-$10M
- Commercial Alteration Permit — 9025 W LAWRENCE AVpermitting
Milwaukee · $1M-$10M
- Commercial Alteration Permit — 924 E WELLS STpermitting
Milwaukee · $10M-$50M
- Commercial New Construction Permit — 327 W FLORIDA STpermitting
Milwaukee · $1M-$10M
- Commercial New Construction Permit — 3300 S 27TH STpermitting
Milwaukee · Under $1M
- Construction Services For The Replacement Of Runway 19R Localizer And Glide Slope And Runway 25L Localizer At Milwaukee under construction
· $1M-$10M
- View specs →FPL B49 Fire Hydrant Replacement
Madison
- Pol Pipeline Tap, Htuv199002 A-E Service To Provide Design Service For A Pol Pipeline Tap At General Mitchell Air Nationunder construction
· Under $1M
- Remove An Existing 30-Ton Multi-Stack Air-Cooled Chiller Modular Unit And Install A Replacement Contractor-Designed Packunder construction
· Under $1M
- View specs →Semi-annual roof inspections of FPL facilitiesunder construction
Madison
- Commercial Alteration Permit — 3700 W JUNEAU AVpermitting
Milwaukee · $1M-$10M
- Commercial Alteration Permit — 399 W LAYTON AVpermitting
Milwaukee · $1M-$10M
- Commercial Alteration Permit — 5111 S 9TH STpermitting
Milwaukee · $1M-$10M
- Design/Bid/Build For The Construction Of Two (2) New 48,000Sf, 4-Story, Collective Training Officers Quarters (Ctoq) At under construction
· $50M-$100M
- View specs →Emergency Electric Panel Repair Service.under construction
Tomah
- View specs →Paging System Upgrade Expansion
Madison
- The Contractor Is To Mobilize The Primary Plant To Teepeeota Point, Approximate Mississippi Mile 757.5 And Begin Dredgincompleted
· Under $1M