← All projects
Commercial

Whiteriver Hospital Construction

Whiteriver, Navajo County, Arizona
SPX-002644
The read
Opened / announced
Jun 24, 2026
Bid deadline
Jun 30, 2026

Executive brief

Federal solicitation 75H70126R00016. Whiteriver Hospital Construction. Response deadline 2026-06-30.

Record summary

Data as of .

Location:
Whiteriver, Arizona
Status:
Bid closed
Opened or announced:
2026-06-24
Bid deadline:
2026-06-30 (passed)
Documents held:
672
Specification positions:
142
  • As of 2026-11-03, SpecIndex records this project in Whiteriver, Arizona.
  • As of 2026-11-03, the bid deadline for this project (2026-06-30) has passed.
  • As of 2026-11-03, SpecIndex records this project as opened or announced on 2026-06-24.
  • As of 2026-11-03, SpecIndex holds 672 documents for this project.
  • As of 2026-11-03, SpecIndex holds 142 specification positions for this project, across 23 CSI divisions, 39 sections and 22 pages.

Specification positions, by location in the documents

DivisionSectionPage
130135733
1308111312
232305483
2301782313
2323051357
2323732389
2323732389
2323732389
2323732389
2323732389
2323732389
2323821693
2626011013
2626011013
2626011013
2626011013
2626 01 9518
2626 01 9518
2626 01 9518
2626 01 9518
2626 01 9518
2626 01 9518
2626012019
2626012019
2626012019
2626012019
2626012019
2626012019
2626 01 1020
2626 01 1020
2626 01 9522
2626 01 9522
2626 01 9522
2626 01 9522
2626 01 9522
2626 01 9522
272715001
332715002
462386102
464607133
01General Requirements
02Existing Conditions
03Concrete
04Masonry
04Masonry
04Masonry
06Wood, Plastics, and Composites
07Thermal and Moisture Protection
07Thermal and Moisture Protection
07Thermal and Moisture Protection
07Thermal and Moisture Protection
07Thermal and Moisture Protection
07Thermal and Moisture Protection
08Openings4
08Openings5
08Openings31
08Openings
08Openings
08Openings
08Openings
08Openings
09Finishes
09Finishes
10Specialties41
10Specialties
10Specialties
10Specialties
10Specialties
10Specialties
11Equipment
11Equipment
11Equipment
11Equipment
12Furnishings57
12Furnishings
12Furnishings
13Special Construction1
13Special Construction
13Special Construction
22Plumbing93
22Plumbing
22Plumbing
23Heating, Ventilating, and Air Conditioning170
23Heating, Ventilating, and Air Conditioning (HVAC)
23Heating, Ventilating, and Air Conditioning (HVAC)
23Heating, Ventilating, and Air Conditioning (HVAC)
23Heating, Ventilating, and Air Conditioning (HVAC)
26Electrical31
26Electrical
26Electrical
26Electrical
26Electrical
26Electrical
27Communications734
27Communications
27Communications
27Communications
27Communications
27Communications
27Communications
27Communications
27Communications
27Communications
27Communications
28Electronic Safety and Security
28Electronic Safety and Security
28Electronic Safety and Security
32Exterior Improvements11
32Exterior Improvements
33Utilities171
33Utilities
33Utilities
33Utilities
33Utilities
40Process Interconnections37
40Process Integration
40Process Integration
40Process Integration
40Process Integration
40Process Integration
40Process Integration
40Process Integration
40Process Integration
40Process Integration
40Process Integration
40Process Integration
41Material Processing and Handling Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
46Water and Wastewater Equipment87
46Water and Wastewater Equipment
46Water and Wastewater Equipment
46Water and Wastewater Equipment
46Water and Wastewater Equipment
46Water and Wastewater Equipment

Manufacturer names and quotations are part of the signed-in record.

Other projects in Arizona

Nearest first: same county, then same division, then same project type.

Sources

Every fact on this page is drawn from a public record. These are the records.

From the Spec Desk

Data stories from the SpecIndex index, free in full.