Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Arkansas projects, 85 need this division and 0 are still in planning or permitting.
As of 2026-11-03, 85 of the 300 highest-scored Arkansas projects in the SpecIndex index need concrete, and 0 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 85 · page 1 of 2
- Design And Construct A New Multi-Purpose Building On The Office Of Secure Transportation'S (Ost) Training Command (Tracounder construction
· $10M-$50M
- Reservoir Embankment Rehabilitation, Stuttgart, Arunder construction
· $1M-$10M
- Task Order Is To Provide Office Of Secure Transportation (Ost) A New Modern Classroom/Robot & Battery Storage And Chargiunder construction
· $1M-$10M
- 564-19-403 Renovate Sterile Processing Services (Sps), Fayetteville, Ar 72703. Pop 720 Calendar Days From Ntp. Eo 14398completed
· $10M-$50M
- Replace A Uis Equipment Shelter @ Fyv In Fayetteville, Ar.completed
· Under $1M
- Construction/Installation Of Sunshades For Aircraft At Ebbing Angbunder construction
· $1M-$10M
- 598-22-127 Mixing Valves For Anti-Scald-Nlr/Lr. 365 Calendar Days From Issuance Of Ntp.under construction
· $1M-$10M
- This Project Involves The Construction Of An Approximately 25,000 Sq Ft Aircraft Maintenance Hangar To Support The Bed Dunder construction
· $10M-$50M
- Project Includes A Multi-Story Steel Framed, Reinforced Concrete Flight Training Center With Brick Veneer, Vertical Pileunder construction
· $50M-$100M
- Repair(Sustain)Primary Runway, Little Rock Afb, Arcompleted
· $100M+
- Construction Services At Fayetteville National Cemetery For A Gravesite Expansion Project To Allow For Continued Benefitunder construction
· $1M-$10M
- Design-Bid-Build Of Three Rivers Phase 2 Hydraulic Containment Structure And Modifications To Owens Lake And La Grues Launder construction
· $100M+
- Design-Build Construction Of A New Weir Opening At The Site Of The Mcclellan-Kerr Arkansas Navigation System, Three Rivecompleted
· $100M+
- Phase 3.2 Consist Of The Construction Of 14,665 Lf Of Irrigation Canal, 8 Farm Offtakes, 5 Siphon Structures, 1 Gravity under construction
· $10M-$50M
- Construction Of Necropsy Houseunder construction
· $1M-$10M
- Helena Floodwall Replacement Project.under construction
· $1M-$10M
- Russellville, Ar - Insulated Metal Paneling (Imp) Installation Services For The Long-Range Radar System Equipment @ Russunder construction
· Under $1M
- Task Order To Repair Office And Restroom Hvac At Little Rock National Cemetery.under construction
· Under $1M
- Txk Access Rd. And Parking Lotunder construction
· Under $1M
- 598-23-107, Med Gas Deficienciesunder construction
· $1M-$10M
- Bldg. 2 - Chiller Plant Construction And Associated Projectsunder construction
· $10M-$50M
- Design Build For A C-130 H/J Fuselage Trainer Facility At The Little Rock Air Force Basecompleted
· $10M-$50M
- Design-Build, Renovation Ebbing Hangar Building 200, Ebbing Air National Guard Base, Arkansasunder construction
· $10M-$50M
- Ditch 9 And 10 Straight Slough Channel Improvementsunder construction
· $1M-$10M
- Grand Prairie Pump Station Re-Procurementunder construction
· $10M-$50M
- Project Ar Fw Bld 11(1): The Project Consists Of Roadway Reconstruction And Resurfacing Of Granary South Road (Route 011under construction
· $1M-$10M
- Rebuild Of The Liberty To Van Buren Portion Of Southwesterns Van Buren To Weleetka 161Kv Transmission Lineunder construction
· $1M-$10M
- Structural Repairunder construction
· Under $1M
- Building 32-630 Renovationcompleted
· $10M-$50M
- Building 65 Structural Repairs - Pop 365 Days From Ntp.under construction
· $1M-$10M
- Construction Of West Bank Mississippi River Item 525-R, Levee Enlargement And Berms, In Chicot County, Arkansas.completed
· $10M-$50M
- Construct New Inpatient Mental Health Buildingcompleted
· $10M-$50M
- Continuous Dredging Capabilitycompleted
· $10M-$50M
- Design And Construct New Classroom Complex For The Letc For Vacompleted
· $10M-$50M
- Design And Construct New Food Service Center For Vacompleted
· $10M-$50M
- Design-Build Construction Services To Repair/Refurbish Main Ramp, Aircraft Sunshades, And Taxiway At Ebbing Angb, Fort Scompleted
· $10M-$50M
- Grand Prairie Pump Station Inlet Channelcompleted
· $1M-$10M
- Line 3001C Dardanelle-Structure 87 Rebuildcompleted
· $10M-$50M
- Little Rock Sps Renovation Design Bid Buildcompleted
· $10M-$50M
- Project Ar Erfo Fs 2020-1(1): The Project Consists Of The Repair Of A Landslide On Morgan Mountain Road, Within The Ozaunder construction
· $1M-$10M
- Regional Engineering And Construction Contract (Re&C) Central Region Repair (Sustain) All American Landing Zone Drainagecompleted
· $10M-$50M
- Satoc #1, Electrical Upgrades Gamaliel Campground, Norfork Lake. All Work Shall Be Complete Within One-Hundred And Eightcompleted
· Under $1M
- 564-17-140 Renovate Med & Surg Unit 2B.completed
· $10M-$50M
- 598-21-108 Upgrade Heating Water System-Lr 270 Calendar Day Period Of Performance After Issuance Of Ntp.under construction
· $1M-$10M
- Ar Erfo Fs Ozstf810 2022-1(1): The Project Consists Of The Permanent Slide Repair Of White Rock Road (Nfsr 1003) And Easunder construction
· $1M-$10M
- Construction Services For The Capital Security Program (Csp) Project In The U.S. Courthouse/Post Office In Texarkana, Arcompleted
· $10M-$50M
- Design And Construction Services For Cargo Deployment Ramp Repair, Ebbing Angb, Ft. Smith, Ar.completed
· $1M-$10M
- Design And Construction Services For Renovation B115 Armament Facility, Ebbing Angbcompleted
· $1M-$10M
- Design Build Project For The Va Letc Dining Facilitycompleted
· $1M-$10M
- Igf Renovation Of Sps Jackson Mscompleted
· $1M-$10M