Arkansas · Division 03
Concrete projects in Arkansas · page 2
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Arkansas projects, 82 need this division and 0 are still in planning or permitting.
As of 2026-11-03, 82 of the 300 highest-scored Arkansas projects in the SpecIndex index need concrete, and 0 of those are still in planning or permitting.
Search the full index →Showing 51–82 of 82 · page 2 of 2
- Prairie Creek Small Flood Risk Management - Continuing Authorities Program 205 Requirementunder construction
· $1M-$10M
- Remodel Existing Building 208completed
· $1M-$10M
- Satoc #1, Electrical Upgrades Gamaliel Campground, Norfork Lake. All Work Shall Be Complete Within One-Hundred And Eightcompleted
· Under $1M
- The Work Consists Of Furnishing All Plant, Labor, Materials, And Equipment, For Mobilization And Demobilization Cofferdaunder construction
· $1M-$10M
- Training Command (Tracom) Physical Training Facility (Ptf) Renovation Building 1779, Fort Chaffeecompleted
· $1M-$10M
- Usace, Memphis District Intends To Issue A Task Order Under The Existing 8(A) Competitive Matoc For Mrl-M System 6 Segmeunder construction
· $1M-$10M
- 598-20-106 Improve Physical Medicine & Rehabilitation Serviceunder construction
· $1M-$10M
- 598-21-101 Renovate Ground Floor Support Servicescompleted
· $1M-$10M
- 598-22-151 B170 Fiberglass Chilled Water Piping Replacementunder construction
· $1M-$10M
- Add Alter Bldg 220completed
· $1M-$10M
- Construction Project To Upgrade Pharmacy At The Little Rock Vamccompleted
· $1M-$10M
- Construction Services For New Aeration System Phase 2under construction
· $1M-$10M
- Develop Private/Semi-Private Bed Space For 3Hcompleted
· $1M-$10M
- Excavationunder construction
· $1M-$10M
- Gate Seal Replacement (Conduit 14)completed
· $1M-$10M
- Igf Construction Contract To Upgrade Hvac And Auditorium Finishes Bldg. 3completed
· $1M-$10M
- Igf: Replacement Of Fiberglass Pipingcompleted
· $1M-$10M
- Lock Lighting Upgrade, Montgomery Point Lock And Dam, Desha And Arkansas Counties, Arkansas. Work Shall Be Complete Withunder construction
· $1M-$10M
- Russellville, Ar - Qxr Building Renovations, Along With Site Improvements, Including Radome Work In Russellville, Ar In completed
· $1M-$10M
- Stairwell Wall Tile Demolition, Norfork Powerhouse In Baxter County, Arkansas. Work Shall Be Completed Within Twenty-Fivcompleted
· Under $1M
- St. Thomas Relief Wellscompleted
· $1M-$10M
- Swl Minor Construction Satoc Task Order #63. Norfork Lake Paving Repairs At Robinson Point, Quarry Point, Gamaliel, And completed
· $1M-$10M
- Swl Minor Constuction Satoc Task Order #62. Bull Shoals Paving Repairs At Lead Hill, Tucker Hollow, Hwy 125, And Buck Crcompleted
· $1M-$10M
- 598-19-127 Building 104 Renovations Letc. Pop Is 300 Calendar Days After Ntp.under construction
· $1M-$10M
- 598-22-126 Demo Buildingscompleted
· $1M-$10M
- Construction Of Inpatient Dialysiscompleted
· $1M-$10M
- Swl Minor Construction Satoc #57 Award. Panther Bay Paving Repairs, Norfork Lake, Baxter County, Arkansas. Work To Be Ccompleted
· $1M-$10M
- White River Backwater Seepagecompleted
· $1M-$10M
- Add Hvac To Corridor B-1, B-3.completed
· Under $1M
- Construct Female Latrine Facility At Regional Training Site, Massard Rd, 188Th Wing, Fort Smith, Ar.completed
· Under $1M
- Construction Of Colony House 3C And Construction Of Colony House 4Ccompleted
· $1M-$10M
- Dd17 Inlet Channel Cleanoutcompleted
· $1M-$10M