Arkansas · Division 23
HVAC projects in Arkansas · page 3
Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 300 highest-priority scored Arkansas projects, 246 need this division and 153 are still in planning or permitting.
As of 2026-11-03, 246 of the 300 highest-scored Arkansas projects in the SpecIndex index need hvac, and 153 of those are still in planning or permitting.
Search the full index →Showing 101–150 of 246 · page 3 of 5
- View specs →Repair Hail Damage Booneville, AR
- Truck Dock Addition to existing Packaging Specialties Warehouse building. 30'x25' 750 SF dock with truck well. New permitting
· Under $1M
- View specs →36C25626Q1345 |564-23-701 Replace Perimeter Security Fence | Sources Soughtplanning
- Autozone : Auto Parts Retail Storepermitting
· Under $1M
- Building 0 - The scope of work for this permit includes the footprint of a 37 unit multifamily apartment building consispermitting
· $1M-$10M
- Building 11, One of two, 36 Unit, R-2 Occupancy, 3 Story Multifamily apartment buildings. Type VB Construction, NFPA 13Rpermitting
· $1M-$10M
- Building 12, One of two, 36 Unit, R-2 Occupancy, 3 Story Multifamily apartment buildings. Type VB Construction, NFPA 13Rpermitting
· $1M-$10M
- Building 2 - Type C: This is a 3-Story Garden Style Multi-Family Building. There are 3 separate corridors that each havepermitting
· $1M-$10M
- Building 5 - Type C :This is a 3-Story Garden Style Multi-Family Building. There are 3 separate corridors that each havepermitting
· $1M-$10M
- Building 7 - Type C : This is a 3-Story Garden Style Multi-Family Building. There are 3 separate corridors that each havpermitting
· $1M-$10M
- Construction Of Necropsy Houseunder construction
· $1M-$10M
- Ground up development of a childcare center.permitting
· $1M-$10M
- Half-Baked Goods - Tenant infillpermitting
· Under $1M
- Helena Floodwall Replacement Project.under construction
· $1M-$10M
- Phase 3.2 Consist Of The Construction Of 14,665 Lf Of Irrigation Canal, 8 Farm Offtakes, 5 Siphon Structures, 1 Gravity under construction
· $10M-$50M
- Reroofing Project - REPLACING DECKING WHERE NEEDED LIKE MATERIALpermitting
· Under $1M
- Russellville, Ar - Insulated Metal Paneling (Imp) Installation Services For The Long-Range Radar System Equipment @ Russunder construction
· Under $1M
- The scope of work includes building demising walls and restrooms in an existing building to create three separate tenantpermitting
· Under $1M
- View specs →Wastewater System Improvements Stuttgart National Aquaculture Center
Stuttgart
- View specs →19 CES B282 VALENT ERU-1 HVAC
Little Rock Air Force Base
- 598-23-107, Med Gas Deficienciesunder construction
· $1M-$10M
- Airmen Dormitory Replacement, Lrafbcompleted
· $10M-$50M
- Bldg. 2 - Chiller Plant Construction And Associated Projectsunder construction
· $10M-$50M
- Building 10 - Type D : This is a 3-Story Garden Style Multi-Family Building. There are 2 separate corridors that each hapermitting
· $1M-$10M
- Building 1 - Type A : This is a 3-Story Garden Style Multi-Family Building. There are 3 separate corridors that each havpermitting
· $1M-$10M
- Building 3 - Type B : This is a 3-Story Garden Style Multi-Family Building with 36 units. There are 3 separate corridorspermitting
· $1M-$10M
- Building 4 - Type A : This is a 3-Story Garden Style Multi-Family Building. There are 3 separate corridors that each havpermitting
· $1M-$10M
- Building 8 - Type D : This is a 3-Story Garden Style Multi-Family Building. There are 2 separate corridors that each havpermitting
· $1M-$10M
- Building 9 - Type D : This is a 3-Story Garden Style Multi-Family Building. There are 2 separate corridors that each havpermitting
· $1M-$10M
- Convert current restaurant into a coin laundromat.permitting
· Under $1M
- -Delete both toilets and sinks from 3047, cap for possible future tenant use. -Build a stock room wall across the entirepermitting
· Under $1M
- Design Build For A C-130 H/J Fuselage Trainer Facility At The Little Rock Air Force Basecompleted
· $10M-$50M
- Design-Build, Renovation Ebbing Hangar Building 200, Ebbing Air National Guard Base, Arkansasunder construction
· $10M-$50M
- Ditch 9 And 10 Straight Slough Channel Improvementsunder construction
· $1M-$10M
- Grand Prairie Pump Station Re-Procurementunder construction
· $10M-$50M
- Infill white box with a 2bed/2bath aptpermitting
· Under $1M
- New Construction Jiffy Trip Convenience Store with Fueling Canopypermitting
· $1M-$10M
- Rebuild Of The Liberty To Van Buren Portion Of Southwesterns Van Buren To Weleetka 161Kv Transmission Lineunder construction
· $1M-$10M
- Structural Repairunder construction
· Under $1M
- Task Order To Repair Office And Restroom Hvac At Little Rock National Cemetery.under construction
· Under $1M
- Txk Access Rd. And Parking Lotunder construction
· Under $1M
- 1,750 SF SPACE FOR TENANT INFILL IN AN EXISTING 3,500 SF PEMB BUILDING. THE TENANT IS A RETAURANT WITH KITCHEN AREA, POIpermitting
· Under $1M
- Add bathroom and kitchen to front half of building. New entry door and new windows. New electric and HVAC systempermitting
· Under $1M
- Building 32-630 Renovationcompleted
· $10M-$50M
- Building 65 Structural Repairs - Pop 365 Days From Ntp.under construction
· $1M-$10M
- View specs →Clean and Seal Bridge Decks-Dierks, DeQueen and Gillham Lakes
De Queen
- Construction Of West Bank Mississippi River Item 525-R, Levee Enlargement And Berms, In Chicot County, Arkansas.completed
· $10M-$50M
- Construct New Inpatient Mental Health Buildingcompleted
· $10M-$50M
- Continuous Dredging Capabilitycompleted
· $10M-$50M
- Currently white box. Add walls, hallway, office, dressing room, cash register island with electrical, plumbing, for a rpermitting
· Under $1M