DC · Division 03
Concrete projects in DC · page 2
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored DC projects, 192 need this division and 1 are still in planning or permitting.
As of 2026-11-03, 192 of the 300 highest-scored DC projects in the SpecIndex index need concrete, and 1 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 192 · page 2 of 4
- Design-Build Construction For Pentagon Mall Terrace Waterproofing And Expansion Joint Repairscompleted
· $10M-$50M
- Fy 26 Arlser-12 Mini Martunder construction
· Under $1M
- Joint Air Defense Operations Center, Phase Iicompleted
· $10M-$50M
- Nama 340086 - Design/Build Repair Sinkholescompleted
· $1M-$10M
- Nama 350892 - Wwii Fountain Rehabilitationcompleted
· $1M-$10M
- Nasm: Construct Bezos Learning Centerunder construction
· $10M-$50M
- Nmnh: Upgrade Fire Alarm And Mass Notification Systemcompleted
· $10M-$50M
- Nzp-Dc: Perform Misc Maintenance Projects.under construction
· Under $1M
- Nzp-Dc Renew Cheetah Conservation Station Africa Trail (Ccs-At)completed
· $10M-$50M
- Project Dc Np Rocr 503(1), 24(2) The Project Consists Of Roadway Repairs On Waterside Drive From The Southern Intersectunder construction
· $1M-$10M
- Project Np Jfk1(2) Nama16(2) Trl(1): The Project Consists Of Kennedy Center Pedestrian/Bicycle Trail Access And Safetyunder construction
· $10M-$50M
- W81W3G52656864under construction
· $10M-$50M
- Air Force Office Suites 5E960, 5E800/5E806, And 4E1062 Renounder construction
· $1M-$10M
- B168 Renovations For Nia, Joint Base Anacostia-Bolling, Washington Dccompleted
· $10M-$50M
- Construction Of Pentagon Corridor 8 Pedestrian Access Control Point (Pacp)completed
· $10M-$50M
- Design-Build Construction For Pentagon Wedge 1 5E Phase 4 Refreshcompleted
· $1M-$10M
- Design-Build Construction For Renovation Of 4D328-343 For The United States Marine Corpscompleted
· $1M-$10M
- Design-Build Construction Services For Renovation Of Army Suite At The Pentagonunder construction
· $1M-$10M
- Design-Build Renovation Of Swing Spacecompleted
· $1M-$10M
- Design For Renovation For 3 Office Suitecompleted
· $1M-$10M
- Fga Improve Courtyard Accessibility.completed
· $1M-$10M
- Idiq Matoc To Digital Media Center Renovation.completed
· $1M-$10M
- Igf::Cl::Igfcompleted
· $1M-$10M
- Igf::Ot::Igf Nmic-1 Fuel Tank Removal&Conversion (Base Bid)completed
· $1M-$10M
- Nder 1 - Exercise Year 9 & Convert Non Interface Contract Gs-P-11-14-Mk-0021 From Pdn Pj To Ep Interfaceunder construction
· $1M-$10M
- Ndu Bldg 62 Life Safetyunder construction
· $1M-$10M
- Nmah: Relocate Security Command Center.under construction
· $1M-$10M
- Nmah: Replace Acu'S For Collections Storage On 4Th And 5Thcompleted
· $10M-$50M
- Nmnh: Replace Windows & Repair Facadecompleted
· $1M-$10M
- Np Rocr 910(1) The Project Consists Of The Replacement Of The Edgewater Stable Access Bridge Deck, Bridge Rail And Curbsunder construction
· $1M-$10M
- Nrl-215 Replace Exhaust Vents And Motors On Roof (Construction Award)under construction
· $1M-$10M
- Nrl-66 Renovate Bldg For Ttcp Facilityunder construction
· $1M-$10M
- Nzp-Dc: Improve Perimeter Security, Segment 8.completed
· $1M-$10M
- Nzp-Dc Repair Gsb Column Capitals.completed
· $10M-$50M
- Piping And Plumbing Repair And Replacement, J. Edgar Hoover Fbi Building, Washington, Dccompleted
· $10M-$50M
- Project Np-Gwmp 6(1), 7(2): The Project Consists Of The Rehabilitation Of The Clara Barton Parkway And Associated Parkincompleted
· $1M-$10M
- Quad Replace Steam Humidification System-Gc.under construction
· $1M-$10M
- Renew Boiler Plant (Construction Award & Maintenance)completed
· $10M-$50M
- Repair Fire Protection Systems Bldg 250A Usnacompleted
· $1M-$10M
- Replace Main Generator.under construction
· $1M-$10M
- Revitalize Historic Corecompleted
· $1M-$10M
- Second High Reservoir Maintenance And Repaircompleted
· $1M-$10M
- Tactical Village Classroom Task Ordercompleted
· $10M-$50M
- This Is A New Requirement In Support Of The White House Communications Agency To Design Build Effort For The Second Floocompleted
· $1M-$10M
- This Is Task Order F16Cw10478 Against Id/Iq Contract Fde-Am36-09Go29033 For Providing Energy Saving Performance Contractunder construction
· $10M-$50M
- This Is Work Order Contract F13Cw10288 Under Doe Id/Iq Contract De-Am36-09-Go29039 For Provide Energy Saving Performanceunder construction
· $1M-$10M
- Wny B201 B28, And B104 - Navsea Replace Elevator Equipmentunder construction
· $1M-$10M
- X008 Nrl 246 Switchgear Replacement (Electrical)under construction
· $1M-$10M
- 697Dck-18-F-00055 Wsa Espcunder construction
· $1M-$10M
- B17 Crisis Response Officecompleted
· $1M-$10M