DC · Division 03

Concrete projects in DC · page 4

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored DC projects, 192 need this division and 1 are still in planning or permitting.

As of 2026-11-03, 192 of the 300 highest-scored DC projects in the SpecIndex index need concrete, and 1 of those are still in planning or permitting.

Search the full index →

Showing 151–192 of 192 · page 4 of 4

  • Funding For Design Build & Constructioncompleted

    · $1M-$10M

  • G06 G06A G454 Renovations To Offices In The United States Tax Courtunder construction

    · $1M-$10M

  • Igf::Ct::Igf Led Upgrade Energy Savings Performance Contract (Espc) At Fors.under construction

    · $1M-$10M

  • Igf::Ot::Igf Nrl-71 Install Redundant G10 Feeder To Transformer/Switchgear For Electra Lasercompleted

    · $1M-$10M

  • Igf::Ot::Igf Regional Idq Paving Base Yearunder construction

    · $1M-$10M

  • Igf::Ot::Igf X012 Nrl-A59 E-Line Upgrade Rooms 19A1-22A1 For Hypecompleted

    · $1M-$10M

  • Miscellaneous Maintenance Projects (Project No. 25161).under construction

    · $1M-$10M

  • Msc: Replace Pod 5 Roof.completed

    · $1M-$10M

  • National Gallery Of Art Indefinite Delivery/ Indefinite Quantity (Idiq), Multiple Award Task Order Contract (Matoc) For completed

    · $1M-$10M

  • Nmah: Replace Misc. Center Core Finishes/Lighting.completed

    · $1M-$10M

  • Nmai-Dc: Upgrade Fire Alarm Panelscompleted

    · $1M-$10M

  • Nmai-Ny -Renovate East Gallerycompleted

    · $1M-$10M

  • Nmic-1 Refurbish Room 4B103completed

    · $1M-$10M

  • Nmic Suite 2A123-124A Base Bid Sowunder construction

    · $1M-$10M

  • Nmnh: Install Fall Protection, Rotunda & 4Th Floor.under construction

    · $1M-$10M

  • Nrl-256 (E-Line) Renovate Rooms 152 And 153 For Gambell Iiicompleted

    · $1M-$10M

  • Nrl-42 Replace Fire Alarm Systemunder construction

    · $1M-$10M

  • Nrl-57 Renovate Restrooms On 1F And 2Fcompleted

    · $1M-$10M

  • Nrl-A49/97 Update Fire Alarm System-Pw 6007 (Db)completed

    · $1M-$10M

  • Nzp-Dc: Improve Perimeter Security Seg8-Bus Lot (Pn 2033120).completed

    · $1M-$10M

  • Nzp-Dc: Renew Bobcat Containment.completed

    · $1M-$10M

  • Nzp-Dc: Stabilize Creek And Bridge Abutments (Pn 2233102).completed

    · $1M-$10M

  • Nzp-Dc: Upgrade Ess Vet Hosp, Quar & Necropsy (Pn 2233105).completed

    · $1M-$10M

  • Nzp-Va: Upgrade Scbi Barn Envelopes (Pn 2270102)under construction

    · $1M-$10M

  • Project Np-Nama 12(3) The Project Consists Of The Rehabilitation Of Outlet Bridge And Resurfacing Of East Basin Drive. under construction

    · $1M-$10M

  • Project Np Rocr 15(2) This Project Consists Of Replacement Of The Joyce Road Bridge Over Luzon Branch Including Modificaunder construction

    · $1M-$10M

  • Project Np-Whho 407(2) The Project Consists Of The Rehabilitation Of The Aesthetic Pavement On Pennsylvania Avenue Betwecompleted

    · $1M-$10M

  • Repair Sewer Lines Fdr Monumentunder construction

    · Under $1M

  • The Purpose Of This Task Order Is To Provide Usda With Facility Alteration Services Within The Sidney R. Yates Federal Bcompleted

    · Under $1M

  • This Is Task Order No. 33330225Ff0010471, W.O. No. 019, Against Idiq No. F16Cc10413, To Provide Flood Mitigation And Sitcompleted

    · $1M-$10M

  • To Award A Stage 1 Survey Under The Rapid Engineering And Construction (Rec) Program. The Survey Includes Pre-Design Andcompleted

    · $1M-$10M

  • W34 Backupcompleted

    · $1M-$10M

  • Window Prototype, Washington, Dccompleted

    · $1M-$10M

  • X001 Wny-197 Navsea Iws Mtc-A Secure Buildprovide Rf Shielding Ancompleted

    · $1M-$10M

  • X006 Nrl 35 Replace Secondary Unit Substation T-54completed

    · $1M-$10M

  • X007 Nrl-83 Renovate Buildingcompleted

    · $1M-$10M

  • X013 Mbw Mc8I-000 United States Marine Band Theatrical Lighting Acompleted

    · $1M-$10M

  • X017 Card-60 U.S.T. Farm Conversion (Hubzone Macc)completed

    · $1M-$10M

  • X018 Nrl 208 Provide Backup Power To Toxic Fume Hoodscompleted

    · $1M-$10M

  • X019 Nrl-209 Replace Elevators 1 And 2.completed

    · $1M-$10M

  • (1) 3Rd&4Th Floor Balconies New Metal Caps.(2) Exterior Handrails And Lighting Upgradecompleted

    · $1M-$10M

  • Building 606 Emergency Power Generator, Forest Glen,Mdcompleted

    · $1M-$10M