Florida · Division 23
HVAC projects in Florida
Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 300 highest-priority scored Florida projects, 273 need this division and 260 are still in planning or permitting.
As of 2026-11-03, 273 of the 300 highest-scored Florida projects in the SpecIndex index need hvac, and 260 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 273 · page 1 of 6
- View specs →SHELL/4WARD LOGISTICS/BLD #1/OPTX-SS-12483572-6675permitting
Tampa
- View specs →SHELL/4WARD LOGISTICS/BLD #2/OPTX-SS-12483572-6675permitting
Tampa
- View specs →Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC
Gainesville
- View specs →P683 Aircraft Engine Repair Facility, NAS Jacksonville, FL
Jacksonville
- View specs →PP PR/INSP/SHELL/CHIPOTLE/OPTX-SS-12597778-7768permitting
Tampa
- 1034 SW 2 AVEpermitting
Miami · $100M+
- View specs →P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA
Jacksonville
- 887 NW 65 AVEpermitting
Miami · $100M+
- 887 NW 65 AVEpermitting
Miami · $100M+
- Bb - Replace Deteriorated Ahu 21, 22, 23 And 24, Project Number 573-21-705.under construction
· $50M-$100M
- 1201 BRICKELL BAY DRpermitting
Miami · $10M-$50M
- 9948 W HIBISCUS STpermitting
Miami · $10M-$50M
- 9948 W HIBISCUS STpermitting
Miami · $10M-$50M
- 9948 W HIBISCUS STpermitting
Miami · $10M-$50M
- Create Redundancy Chiller Plan At Building 44.under construction
· $10M-$50M
- Kc-46 Supplies And Equipment Warehouse On Macdill Air Force Base, Flplanning
· $1M-$10M
- SPC: KPMG LAKEHOUSE CLIENT DINNING PAVILIONSpermitting
Orlando · $1M-$10M
- View specs →Z2DA--673-20-107 EHRM Infrastructure Upgrades Construction Tampa, FL
Tampa
- 10451 NW 117 AVEpermitting
Miami · $10M-$50M
- 18450 NW 87 AVEpermitting
Miami · $10M-$50M
- 3201 NW 110 STpermitting
Miami · $10M-$50M
- 7705 NW 48 STpermitting
Miami · $1M-$10M
- 9725 NW 117 AVEpermitting
Miami · $10M-$50M
- Construction Of U.S. Customs And Border Protection Facility In Jacksonville,Flunder construction
· $100M+
- PP - MILLS AVENUE FOOD HALLpermitting
Orlando · $1M-$10M
- View specs →REPAIR, RENOVATE PMEL
Patrick AFB
- 120 SW 8 STpermitting
Miami · $10M-$50M
- 12442 SW 130 STpermitting
Miami · $10M-$50M
- 15155 SW 97 AVE 301permitting
Miami · $1M-$10M
- 2925 NW 120 TERpermitting
Miami · $50M-$100M
- 3015 NW 79 STpermitting
Miami · $10M-$50M
- 4148 E 8 AVEpermitting
Miami · $10M-$50M
- 7705 NW 48 STpermitting
Miami · $1M-$10M
- Restore Bldg 37 After Floodingunder construction
· $1M-$10M
- VALLEYGATE ASC OF ORLANDOpermitting
Orlando · $1M-$10M
- View specs →Y1DZ--FY26: NRM (PROJ: 516-23-604) BB - Install Temp Shoring in Crawl Space at Building 1 (Structural Repairs)
Bay Pines
- 1004 NW 65 AVEpermitting
Miami · $1M-$10M
- 1034 SW 2 AVEpermitting
Miami · $100M+
- 10735 SW 56 STpermitting
Miami · $1M-$10M
- 10990 BISCAYNE BLVDpermitting
Miami · $1M-$10M
- 11875 SW 216 STpermitting
Miami · $10M-$50M
- 11875 SW 216 STpermitting
Miami · $10M-$50M
- 12405 SW 88 STpermitting
Miami · $1M-$10M
- 12555 QUAIL ROOST DRpermitting
Miami · $1M-$10M
- 15155 SW 97 AVE 301permitting
Miami · $1M-$10M
- 20971 OLD CUTLER RDpermitting
Miami · $1M-$10M
- 2601 NE 211 TERpermitting
Miami · $1M-$10M
- 2822 NE 187 STpermitting
Miami · $50M-$100M
- 2925 NW 120 TERpermitting
Miami · $50M-$100M
- 501 NE 181 STpermitting
Miami · $10M-$50M