Hawaii · Division 23
HVAC projects in Hawaii
Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 300 highest-priority scored Hawaii projects, 276 need this division and 55 are still in planning or permitting.
As of 2026-11-03, 276 of the 300 highest-scored Hawaii projects in the SpecIndex index need hvac, and 55 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 276 · page 1 of 6
- View specs →CORROSION CONTROL FACILITY B3407, HIANG, JBPHH, HI
JBPHH
- View specs →FY21 Military Construction Army (MCA) Project Number (PN) 76897 Aircraft, Wheeler Army Airfield, Oahu, Hawaiideadline not recorded
Wheeler Army Airfield
- View specs →HETF – Pu’u Wa’awa’a Renovation Project
Hilo
- View specs →IPIF Perimeter Fence Installationunder construction
Hilo
- View specs →PACKAGE AIR CONDITIONING UNIT (PACU) REPLACEMENT FOR SMITHSONIAN ASTROPHYSICAL OBSERVATORY, SUBMILLIMETER ARRAY BASE FAC
Hilo
- View specs →Roof Replacement at FDC Honolulu
Honolulu
- View specs →SOLICITATION SMITHSONIAN SMA FACILITY CONSTRUCT BASE BUILDING GENERATOR AND ENCLOSURE
Hilo
- View specs →USDA Forest Service PSW Hilo, HI Photovoltaic System Construction Phase Iunder construction
HILO
- View specs →USDA FS PSW Hilo, HI Photovaltaic System Phase 1
HILO
- View specs →Construction Of Usgs Facilities On Big Island Of Hawaiiunder construction
· $100M+
- Amazon Kapolei Fulfillment Center (proposed)planning
Kapolei · $100M+
- View specs →FY22 OMA Multi-Domain Task Force (MDTF) #3, Building 300, Helemano Military Reservation
Wahiawa · $50M-$100M
- View specs →FY25 Company Operations Facility, Schofield Barracks, Oahu, Hawaiiunder construction
Schofield Barracks · $10M-$50M
- View specs →West Maui Temporary School Facilities Located In Maui, Hi.completed
· $50M-$100M
- View specs →FY22 Military Construction Army (MCA) 070551 Child Development Center, Schofield Barracks, Oahu, Hawaii
Schofield Barracks · $10M-$50M
- View specs →FY23 Military Construction Army (MCA) 070551 Child Development Center, Schofield Barracks, Oahu, Hawaii
69050 · $10M-$50M
- Fy24 Mcon Project P034 Missile Magazines, Jbphh, West Loch Annex, Ewa Beach, Hawaiiunder construction
· $100M+
- View specs →KNMD189008 F-22 COMPOSITE REPAIR FACILITY JOINT BASE PEARL HARBOR HICKAM (JBPHH) HI SOURCES SOUGHT
Joint Base Pearl Harbor Hickam
- View specs →Repair Building 503A, Fort Shafter, Oahu, Hawaii
Fort Shafter
- View specs →Schofield Barracks Repair Buildings 2075 and 2076, Oahu, Hawaii
Schofield Barracks
- View specs →UPGRADE BUILDING COMPLEX HILO
Hilo
- Bell Building Chiller #2 Replaceunder construction
· Under $1M
- Rm22-1212 Dry Dock 4 Floor And Electrical Upgrades, Siop, Phns, Jbphhunder construction
· $50M-$100M
- Hi0011Zz Pjkk Federal Building Uscg 9-118 Resource Office Alterationunder construction
· Under $1M
- View specs →ARS Concrete Slab and Carport Assemblyunder construction
- View specs →KITCHEN REMODEL - REGION 9 PAO
Fort Shafter
- View specs →KP LIGHTHOUSE REPAIRS
Kilauea
- P-1023U, Native Hawaiian Reburial Cemeteryunder construction
· $1M-$10M
- View specs →Plant Pathology and Quarantine Building, Hilo Hawaii
Hilo
- View specs →Rehabilitate Historic Ohi'a Wing for Visitor Use (Phase 2)
HAWAII NATIONAL PARK
- View specs →Repair Building 3004, Schofield Barracks, Hawaiiunder construction
SCHOFIELD BARRACKS
- View specs →Z1DA--Acute Care Clinic (ACC) Roof Replacementplanning
Honolulu, Hawaii
- View specs →Z2DA--VISN 21 MACC Repair E-Wing Roofplanning
Honolulu
- View specs →Z--KP LIGHTHOUSE REPAIRS
Kilauea
- 4Th & 5Th Fl Planter Water Intrusion At The Pjkk Federal Building In Honolulu, Hiunder construction
· Under $1M
- Fy25 Mca Pn76583 Company Operations Facility, South Range Schofield Barracks, Oahu, Hawaiiunder construction
· $50M-$100M
- View specs →JPMRC 27-01 Oahu Crane
JBPHH
- View specs →Justification for N6247826RPC16; Special Project RM13-2745 Repair Q4 UH Building 1489, Joint Base Pearl Harbor-Hickam, Hplanning
JBPHH
- View specs →U.S. Army Hawaii Construction MATOC TO to Install Bright Rigid Canopyplanning
Fort Shafter
- Base Guam Bldg 1 Ceilingunder construction
· Under $1M
- Design-Build Construct New C-130J Tension Membrane Hangar At Air Station Barbers Point In Kapolei, Hi (Tas: 7021/250613)under construction
· $50M-$100M
- Design-Build Regional Dive Locker (Rdl) At Base Honolulu, Honolulu, Hiunder construction
· $10M-$50M
- View specs →Elevator Modernization SB B777, B778, and WAAF B901
Schofield Barracks
- View specs →Greenhouse Roof Replacement Hilo Repository
Hilo
- Mcaf Pnek063092 Secure Integration Support Laboratory, Maui, Hawaiiunder construction
· $50M-$100M
- Mcon Project Fy22 P956 Bachelor Enlisted Quarters (Beq) & Fy23 P973 Beq, Marine Corps Base Hawaii (Mcbh), Kaneohe Bay, Hunder construction
· $100M+
- View specs →Munitions Maintenance and Inspection (M&I) Facility & Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HIplanning
JBPHH
- N62742-20-C-1315, Fy20 Mcon P-911 Bachelor Enlisted Quarters Marine Corps Base Hawaii, Kaneohe, Hawaiicompleted
· $100M+
- Repair B4 Seal Exterior Windows Joint Exterior Paint, Tripler Army Medical Center, Honolulu, Hawaiiunder construction
· $1M-$10M
- View specs →Replacement of Air Conditioning Units in Nematology Lab
Hilo