Hawaii · Division 08
Openings projects in Hawaii
Glazing, curtain wall, storefront, doors, hardware. Usually specified by the architect. Counted across our 300 highest-priority scored Hawaii projects, 67 need this division and 53 are still in planning or permitting.
As of 2026-11-03, 67 of the 300 highest-scored Hawaii projects in the SpecIndex index need openings, and 53 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 67 · page 1 of 2
- View specs →CORROSION CONTROL FACILITY B3407, HIANG, JBPHH, HI
JBPHH
- View specs →FY21 Military Construction Army (MCA) Project Number (PN) 76897 Aircraft, Wheeler Army Airfield, Oahu, Hawaiideadline not recorded
Wheeler Army Airfield
- View specs →HETF – Pu’u Wa’awa’a Renovation Project
Hilo
- View specs →IPIF Perimeter Fence Installationunder construction
Hilo
- View specs →PACKAGE AIR CONDITIONING UNIT (PACU) REPLACEMENT FOR SMITHSONIAN ASTROPHYSICAL OBSERVATORY, SUBMILLIMETER ARRAY BASE FAC
Hilo
- View specs →Roof Replacement at FDC Honolulu
Honolulu
- View specs →SOLICITATION SMITHSONIAN SMA FACILITY CONSTRUCT BASE BUILDING GENERATOR AND ENCLOSURE
Hilo
- View specs →FY22 OMA Multi-Domain Task Force (MDTF) #3, Building 300, Helemano Military Reservation
Wahiawa · $50M-$100M
- View specs →FY25 Company Operations Facility, Schofield Barracks, Oahu, Hawaiiunder construction
Schofield Barracks · $10M-$50M
- View specs →FY22 Military Construction Army (MCA) 070551 Child Development Center, Schofield Barracks, Oahu, Hawaii
Schofield Barracks · $10M-$50M
- View specs →FY23 Military Construction Army (MCA) 070551 Child Development Center, Schofield Barracks, Oahu, Hawaii
69050 · $10M-$50M
- View specs →KNMD189008 F-22 COMPOSITE REPAIR FACILITY JOINT BASE PEARL HARBOR HICKAM (JBPHH) HI SOURCES SOUGHT
Joint Base Pearl Harbor Hickam
- View specs →Repair Building 503A, Fort Shafter, Oahu, Hawaii
Fort Shafter
- View specs →Schofield Barracks Repair Buildings 2075 and 2076, Oahu, Hawaii
Schofield Barracks
- View specs →UPGRADE BUILDING COMPLEX HILO
Hilo
- View specs →ARS Concrete Slab and Carport Assemblyunder construction
- View specs →KITCHEN REMODEL - REGION 9 PAO
Fort Shafter
- View specs →KP LIGHTHOUSE REPAIRS
Kilauea
- View specs →Plant Pathology and Quarantine Building, Hilo Hawaii
Hilo
- View specs →Rehabilitate Historic Ohi'a Wing for Visitor Use (Phase 2)
HAWAII NATIONAL PARK
- View specs →Repair Building 3004, Schofield Barracks, Hawaiiunder construction
SCHOFIELD BARRACKS
- View specs →Z1DA--Acute Care Clinic (ACC) Roof Replacementplanning
Honolulu, Hawaii
- View specs →Z2DA--VISN 21 MACC Repair E-Wing Roofplanning
Honolulu
- View specs →Z--KP LIGHTHOUSE REPAIRS
Kilauea
- View specs →JPMRC 27-01 Oahu Crane
JBPHH
- View specs →Justification for N6247826RPC16; Special Project RM13-2745 Repair Q4 UH Building 1489, Joint Base Pearl Harbor-Hickam, Hplanning
JBPHH
- View specs →U.S. Army Hawaii Construction MATOC TO to Install Bright Rigid Canopyplanning
Fort Shafter
- Design-Build Construct New C-130J Tension Membrane Hangar At Air Station Barbers Point In Kapolei, Hi (Tas: 7021/250613)under construction
· $50M-$100M
- View specs →Elevator Modernization SB B777, B778, and WAAF B901
Schofield Barracks
- View specs →Greenhouse Roof Replacement Hilo Repository
Hilo
- View specs →Munitions Maintenance and Inspection (M&I) Facility & Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HIplanning
JBPHH
- View specs →Replacement of Air Conditioning Units in Nematology Lab
Hilo
- View specs →UPS Circuit Relocation at NRTF Lualualei
Waianae
- View specs →Wake Island Fiber Installation from Marina to VORTAC
Wake Island
- Aviation Unit Operations Building, Wheeler Army Airfield, Oahu, Hawaiiunder construction
· $50M-$100M
- Fy21 Pn76897 Aircraft Maintenance Hangar, Wheeler Army Airfield, Oahu, Hawaiicompleted
· $50M-$100M
- Fy22 Mca Pn93672 Rotary Wing Parking Apron Phase 2, Wheeler Army Airfield, Oahu, Hawaiicompleted
· $50M-$100M
- Igf::Ot::Igf Fy13 P904 Mv-22 Hangar&Infrastructure And Fy 13 P905 Aircraft Staging Areacompleted
· $50M-$100M
- View specs →Metal Roof Installation
Hilo
- Rehabilitation Air Stripper Tower (AST) Pipes, Valves, and Brackets, Bldg 1580, Wheeler Army Airfield, Oahu, Hawaiiplanning
Wheeler Army Airfield · $50M-$100M
- View specs →VAPIHCS Flooring Materials Indefinite Delivery Indefinite Quantity
Honolulu
- View specs →Dry Dock Elevator Dismantle
JBPHH
- View specs →HVAC Quarterly Maintenance for Region 9 PAO
Honolulu
- Repair Hangar 5 Isr Facility B2045, Acc190001, Jb Pearl Harbor-Hickamcompleted
· $10M-$50M
- View specs →Stair Towers (2 ea) Dismantle, Package/Palletize and Relocate IAW PWS
JBPHH
- View specs →15 OSS Furniture
Honolulu
- FY23 Military Construction Army (MCA) 096540 Child Development Center, Schofield Barracks, Oahu, Hawaii
Schofield Barracks · $10M-$50M
- View specs →Mobile Crane Rentalplanning
JBPHH
- View specs →Yale EW (2-Ton Capacity) Bridge Crane Dismantle and Removal
JBPHH
- Construct Truck Fillstand For Wheeler Army Airfield, Hi.completed
· $1M-$10M