Concrete projects in Iowa

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Iowa projects, 91 need this division and 2 are still in planning or permitting.

As of 2026-11-03, 91 of the 300 highest-scored Iowa projects in the SpecIndex index need concrete, and 2 of those are still in planning or permitting.

Search the full index →

Showing 1–50 of 91 · page 1 of 2

  • Incinerator 5 Refractory Demolition and Reline

    Ames

    View specs →
  • Ia Neal Smith Nwr Vc Roof Replacement In Accordance With The Attached Statement Of Work, This Award Is To Replace Roofinunder construction

    · Under $1M

  • 2.1. The Ames, Iowa Usda Facility Includes Approximately 11,645,595.57 Square Feet Of Exterior Animal Holding Areas And under construction

    · Under $1M

  • Animal Carcass Incineratorunder construction

    AMES

    View specs →
  • Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall And Pump Stationunder construction

    · $10M-$50M

  • Construct Tool and Die Facility, Iowa Army Ammunition Plant

    Middletown

    View specs →
  • Lead Azide Remediation, Iowa Army Ammunition Plant (Iaaap)completed

    · $1M-$10M

  • Granular Fill From The Stockpiles, Main Channel And Access Dredging, And Fine Fill Materials From Habitat Dredging, And under construction

    · $1M-$10M

  • Ia0089Zz New Des Moines Federal Courthouse Cmc Site: Tbd, Des Moines, Ia This Award Is For Cmc Design Phase Services Focompleted

    · $100M+

  • 814-Mr26-008 Reconfigure Office Space And Administrative Building At Keokuk National Cemeteryunder construction

    · Under $1M

  • All Plant, Labor, Materials, And Equipment And Performing All Work For Missouri River Levee L-611 - 614 Flood Rehabilitaunder construction

    · Under $1M

  • Construction Of Animal And Zoonotic Disease Centerunder construction

    · $10M-$50M

  • L594 C Levee Repaircompleted

    · $50M-$100M

  • Mississippi River Basin, Mechanical Dredging Indefinite Delivery Indefinite Quantity On The Mississippi River. This Taskcompleted

    · Under $1M

  • Repair Erosion At Rock Control Structures, Erosion At Railroad Bridge And Shoaling Downstream Of Rock Control Structure.completed

    · Under $1M

  • This Contract Is To Build A New Tool And Die Facility. The Project Includes Site Improvements And Constructing A New 56,under construction

    · $10M-$50M

  • A Ave Pump Station/Tree Of Five Seasons - Reach 2 Phase 1completed

    · $10M-$50M

  • Dallas Fort Worth National Cemetery, Phase 5, Design-Bid-Buildcompleted

    · $10M-$50M

  • Design-Build For Lake Red Rock And Saylorville Lake Administrative, Visitor Center And Maintenance Buildingsunder construction

    · $10M-$50M

  • Iowa City Ehrm Upgradescompleted

    · $10M-$50M

  • L611 614 Levee Repaircompleted

    · $10M-$50M

  • Lock 19 Nose Pier Replacement And Bulkhead Recessunder construction

    · $10M-$50M

  • Project: 636A6-21-101 Ehrm Infrastructure Upgrades Construction Des Moinescompleted

    · $10M-$50M

  • The Purpose Of This Task Order Is To Replace An Existing 120-Foot Bridge, Replace 8 Miles Of Existing Roadways With Asphunder construction

    · $10M-$50M

  • 814-Mm26-001 Remove/Replace Flagpole Remove Pavers / Replace With Concrete, Rostrum And Stairs, At Keokuk National Cemetcompleted

    · Under $1M

  • Cedar Rapids Flood Risk Management Project, Reach 1 Mcloud Run Lower Reach Channel, Culverts And Levee- Base Plus Optionunder construction

    · $10M-$50M

  • Cedar Rapids Flood Risk Management Project Reach 1 Mcloud Run Middle Reach Channelcompleted

    · $10M-$50M

  • Hangar Renovationunder construction

    · $1M-$10M

  • Lock 19 Roof Replacement And Masonry Repaircompleted

    · Under $1M

  • Repair Hoop Buildingsunder construction

    · Under $1M

  • Repair Of Gage House Roof At The Usgs Iowa Water Science Center, 400 S. Clinton Street, Iowa City Ia 52240under construction

    · Under $1M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Necunder construction

    · $10M-$50M

  • Base - Steamboat Islandcompleted

    · $1M-$10M

  • Bonds (Payment & Performance)under construction

    · $10M-$50M

  • Cedar Rapids Flood Risk Management Project - Crandic 3completed

    · $1M-$10M

  • Construct Warehouse At The Des Moines Vamccompleted

    · $1M-$10M

  • Design-Build Contract For Coralville Lake Ranger Building And Admin Repairscompleted

    · $1M-$10M

  • Gaoa - Replace Multipurpose Building, Maintenance Shop, Cold Storage Building, And Maintenance Yard At Luster Heights Mccompleted

    · $10M-$50M

  • Iowa River Basin Cedar River Cedar Rapids, Ia Cr Frmp 12Th Ave Se Roller Closure Structurecompleted

    · $1M-$10M

  • Mississippi River Project Office Motorshop-Prefabriated Buildingcompleted

    · $10M-$50M

  • Project 636-804 Relocate Women'S Health Iowa City Va Health Care Systemcompleted

    · $10M-$50M

  • Red Rock Dam - Tainter And Sluice Gatescompleted

    · $10M-$50M

  • Request For Contracting Support To Repair Tanks At Sioux City Ang, Iacompleted

    · $1M-$10M

  • Building 4 Incinerator Decommissioning And Removal And New Animal Carcass Incineratorcompleted

    · $1M-$10M

  • Camp Dodge Fueling System Repairscompleted

    · $1M-$10M

  • Des Moines River Basin, Saylorville Lake, Polk County, Ia, Bob Shetler, Cherry Glen And Prairie Flower, Water And Sewer completed

    · $1M-$10M

  • L594 A1 Levee Breach Repaircompleted

    · $1M-$10M

  • Red Rock Sedm Pump Stationcompleted

    · $1M-$10M

  • 88Th - Des Moines - Repair And Upgrade Hvac In Building 100completed

    · $1M-$10M

  • 96514752124681completed

    · $1M-$10M