Iowa · Division 23
HVAC projects in Iowa
Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 90 highest-priority scored Iowa projects, 90 need this division and 8 are still in planning or permitting.
Search the full index →- View specs →814-Mr26-008 Reconfigure Office Space And Administrative Building At Keokuk National Cemeteryunder construction
· $71,352
- View specs →Repair Of Gage House Roof At The Usgs Iowa Water Science Center, 400 S. Clinton Street, Iowa City Ia 52240under construction
· $19,621
- View specs →Repair Hoop Buildingsunder construction
· $112,513
- View specs →814-Mm26-001 Remove/Replace Flagpole Remove Pavers / Replace With Concrete, Rostrum And Stairs, At Keokuk National Cemetunder construction
· $460,323
- View specs →Lock 19 Roof Replacement And Masonry Repaircompleted
· $470,000
- View specs →Construction Of Animal And Zoonotic Disease Centerunder construction
· $32.8M
- View specs →This Contract Is To Build A New Tool And Die Facility. The Project Includes Site Improvements And Constructing A New 56,completed
· $35.8M
- View specs →Ia0089Zz New Des Moines Federal Courthouse Cmc Site: Tbd, Des Moines, Ia This Award Is For Cmc Design Phase Services Focompleted
· $126.8M
- View specs →Keokuk, Ia Replace Vasi Foundations Eok Vasi Rw 14 Jcn: 21004997completed
· $141,287
- View specs →Lock 19 Nose Pier Replacement And Bulkhead Recessunder construction
· $22.0M
- View specs →L594 C Levee Repaircompleted
· $57.5M
- View specs →Project #636-130 - Des Moines - Vacihcs - Expand And Remodel Laboratory - Des Moines, Iaunder construction
· $18.8M
- View specs →The Purpose Of This Task Order Is To Replace An Existing 120-Foot Bridge, Replace 8 Miles Of Existing Roadways With Asphunder construction
· $13.1M
- View specs →A Ave Pump Station/Tree Of Five Seasons - Reach 2 Phase 1completed
· $32.8M
- View specs →Iowa City Ehrm Upgradescompleted
· $41.9M
- View specs →L611 614 Levee Repaircompleted
· $44.6M
- View specs →Project: 636A6-21-101 Ehrm Infrastructure Upgrades Construction Des Moinescompleted
· $32.6M
- View specs →The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Necunder construction
· $10.5M
- View specs →Building 154 Cooling Tower Media Replacementbidding
Ames · Not reported
- View specs →Dallas Fort Worth National Cemetery, Phase 5, Design-Bid-Buildcompleted
· $31.4M