Kentucky · Division 23

HVAC projects in Kentucky · page 3

Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 300 highest-priority scored Kentucky projects, 192 need this division and 120 are still in planning or permitting.

As of 2026-11-03, 192 of the 300 highest-scored Kentucky projects in the SpecIndex index need hvac, and 120 of those are still in planning or permitting.

Search the full index →

Showing 101–150 of 192 · page 3 of 4

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Project Np Maca 12(1), 908(1): The Project Consists Of Pavement Reconstruction Of The Hotel Parking Area And Adjacent Rounder construction

    · $10M-$50M

  • Town Of Martin Phase Ii Redevelopment Site, Martin, Kycompleted

    · $10M-$50M

  • Alterationpermitting

    · Under $1M

  • Construct Replacement Community Living Center (Clc) - Long Term Care At The Lexington Va Medical Center.completed

    · $10M-$50M

  • Contractor Is To Provide All Construction Services To Complete The Electronic Health Record Modernization Infrastructurecompleted

    · $10M-$50M

  • Fabrication And Delivery Of Liquid Oxygen Facilitycompleted

    · $10M-$50M

  • Newpermitting

    102 · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · $1M-$10M

  • Newpermitting

    · $1M-$10M

  • Newpermitting

    102 · Under $1M

  • Renovation Of Building 3071 Child Development Center At Fort Campbell, Kentucky.completed

    · $10M-$50M

  • Replace Obsolete Overhead Paging System At Lexington Va Health Care System.under construction

    · $1M-$10M

  • 621802: Gaoa 0802 London District Design/Build Contractor Stipendunder construction

    · $10M-$50M

  • Base Automated Record Fire Plus Rangeunder construction

    · $1M-$10M

  • Construction Repair Portland Canal Wall, Mcalpine Locks And Dam.completed

    · $1M-$10M

  • Johnson County Phase Iicompleted

    · $10M-$50M

  • Newpermitting

    · Under $1M

  • Newpermitting

    102 · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Newpermitting

    · Under $1M

  • Notice of Intent for Brand Name Items for Nolin River Lake Tailwater Restroom Constructionplanning

    Mammoth Cave

    View specs →
  • Y1DA--Construction Industry Day - Construct New Radiation Oncology Building Minor Construction - Lexington Leestown 596-planning

    Lexington

    View specs →
  • 81St Readiness Division, Neff Staging Fort Jackson, Columbia, South Carolinacompleted

    · $1M-$10M

  • Alterationpermitting

    · Under $1M

  • Alterationpermitting

    · $1M-$10M

  • Baseball / Softball Fields Rehab At Fort Campbellcompleted

    · $1M-$10M

  • Buckhorn Boat Ramp Reconstruction Base And Optionunder construction

    · $1M-$10M

  • Carr Creek Facilities Restorationunder construction

    Sassafras · $1M-$10M

  • Construction Of Littcarr Campgrpoundcompleted

    · $1M-$10M

  • Dewater Lock Chambercompleted

    · $1M-$10M

  • Fca Deficienciescompleted

    · $1M-$10M

  • FMC Lexington - Remove and Replace Treadway Roofplanning

    Lexington

    View specs →
  • Fort Knox Toilet/Shower Facility Project - Base And Option Awardcompleted

    · $1M-$10M

  • Gro Cable Replacement, Mar Mcc Replacement And Bel Mcc Replacements.completed

    · $1M-$10M

  • Ky Np Maca 16(1), 200(1): The Project Consists Of Reconfiguration Of The Intersection Of Cave City Road And Frozen Niagaunder construction

    · $1M-$10M

  • Loyall Ponding Phase 2completed

    · $1M-$10M

  • Markland L&D Electrical Improvementscompleted

    · $1M-$10M

  • (Matoc To) Ftc Cso Roof And Rtu Replacementunder construction

    · $1M-$10M

  • Newpermitting

    · Under $1M