Kentucky · Division 07
Thermal and Moisture Protection projects in Kentucky · page 3
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Kentucky projects, 187 need this division and 120 are still in planning or permitting.
As of 2026-11-03, 187 of the 300 highest-scored Kentucky projects in the SpecIndex index need thermal and moisture protection, and 120 of those are still in planning or permitting.
Search the full index →Showing 101–150 of 187 · page 3 of 4
- Project Np Maca 12(1), 908(1): The Project Consists Of Pavement Reconstruction Of The Hotel Parking Area And Adjacent Rounder construction
· $10M-$50M
- Town Of Martin Phase Ii Redevelopment Site, Martin, Kycompleted
· $10M-$50M
- Alterationpermitting
· Under $1M
- Fabrication And Delivery Of Liquid Oxygen Facilitycompleted
· $10M-$50M
- Newpermitting
102 · Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· $1M-$10M
- Newpermitting
· $1M-$10M
- Newpermitting
102 · Under $1M
- Renovation Of Building 3071 Child Development Center At Fort Campbell, Kentucky.completed
· $10M-$50M
- Replace Obsolete Overhead Paging System At Lexington Va Health Care System.under construction
· $1M-$10M
- 621802: Gaoa 0802 London District Design/Build Contractor Stipendunder construction
· $10M-$50M
- Base Automated Record Fire Plus Rangeunder construction
· $1M-$10M
- Construction Repair Portland Canal Wall, Mcalpine Locks And Dam.completed
· $1M-$10M
- Johnson County Phase Iicompleted
· $10M-$50M
- Newpermitting
· Under $1M
- Newpermitting
102 · Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- View specs →Notice of Intent for Brand Name Items for Nolin River Lake Tailwater Restroom Constructionplanning
Mammoth Cave
- View specs →Y1DA--Construction Industry Day - Construct New Radiation Oncology Building Minor Construction - Lexington Leestown 596-planning
Lexington
- 81St Readiness Division, Neff Staging Fort Jackson, Columbia, South Carolinacompleted
· $1M-$10M
- Alterationpermitting
· Under $1M
- Alterationpermitting
· $1M-$10M
- Baseball / Softball Fields Rehab At Fort Campbellcompleted
· $1M-$10M
- Buckhorn Boat Ramp Reconstruction Base And Optionunder construction
· $1M-$10M
- Carr Creek Facilities Restorationunder construction
Sassafras · $1M-$10M
- Construction Of Littcarr Campgrpoundcompleted
· $1M-$10M
- Dewater Lock Chambercompleted
· $1M-$10M
- Fca Deficienciescompleted
· $1M-$10M
- View specs →FMC Lexington - Remove and Replace Treadway Roofplanning
Lexington
- Fort Knox Toilet/Shower Facility Project - Base And Option Awardcompleted
· $1M-$10M
- Gro Cable Replacement, Mar Mcc Replacement And Bel Mcc Replacements.completed
· $1M-$10M
- Ky Np Maca 16(1), 200(1): The Project Consists Of Reconfiguration Of The Intersection Of Cave City Road And Frozen Niagaunder construction
· $1M-$10M
- Loyall Ponding Phase 2completed
· $1M-$10M
- Markland L&D Electrical Improvementscompleted
· $1M-$10M
- (Matoc To) Ftc Cso Roof And Rtu Replacementunder construction
· $1M-$10M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M
- Newpermitting
· Under $1M