Maryland · Division 21
Fire Suppression projects in Maryland
Sprinklers, ESFR, deluge, fire protection. Usually specified by the fire protection engineer. Counted across our 300 highest-priority scored Maryland projects, 49 need this division and 38 are still in planning or permitting.
As of 2026-11-03, 49 of the 300 highest-scored Maryland projects in the SpecIndex index need fire suppression, and 38 of those are still in planning or permitting.
Search the full index →- C102231 Design-Build Services, Construct Addition To Bldg 101 Called Niehs Clinical And Computational And Science Buildiplanning
· $100M+
- View specs →Large-Tier Electrical Construction IDIQ
Gaithersburg
- View specs →Z--THOMAS STONE NHS - RENOVATE VIS. CTR. RESTROOMS
Port Tobacco
- View specs →CMS Back on Campus Phase II
Windsor Mill
- View specs →HAMP CUPOLA WOODWORK REPAIR
- View specs →HAMP: REPLACE WOOD SHINGLE ROOF
Towson
- View specs →MUNITION LOAD CREW TRAINING FACILITYunder construction
Joint Base Andrews AFB
- View specs →P303, DESIGN-BID-BUILD, MARINE CORPS RESERVE CENTER, CAMP FRETTERD MDunder construction
Reisterstown
- View specs →Perimeter East Building Renovation and Upgrades Construction Project at the SSA Complex in Woodlawn, MD
Baltimore
- View specs →RENOVATE BLDG 154, NAVAL SUPPORT FACILITY, INDIAN HEAD, MD
Indian Head
- View specs →RENOVATE BLDG 154, NSF INDIAN HEAD, MD
Indian Head
- View specs →RENOVATE BUILDING 154, NAVAL SUPPORT FACILITY INDIAN HEAD, MD
Indian Head
- View specs →Renovation of Building 434, U.S. Department of Agriculture (USDA), Beltsville Agricultural Research Center (BARC)
6400
- View specs →THOMAS STONE NHS - RENOVATE VIS. CTR. RESTROOMS
Port Tobacco
- View specs →Veteran Benefits Administration Regional Office (VARO) Renovations at the George H. Fallon Federal Building in Baltimore
Baltimore
- View specs →Z1DA--512-23-901 Repair Exterior Granite
Baltimore
- View specs →Z--HAMP CUPOLA WOODWORK REPAIR
- View specs →Z--HAMP: REPLACE WOOD SHINGLE ROOF
Towson
- View specs →Zinc Orthophosphate Injection System
Beltsville
- C115777 This Contract Award Is For Construction Services For Card Clinic And Administrative Spaces In Building 10 2Nd Flunder construction
· $1M-$10M
- C200102 Bldg. 4 Replace Laboratory Exhaust Fans. This Negative Pressurization Is Vital For Containment Of Hazardous Mateunder construction
· $1M-$10M
- C202229 Nih Feeder 35, 45, 55 Replacement. The Project Is Intended To Enhance Electrical System Reliability And Improve under construction
· $1M-$10M
- View specs →Repair Building 3002 Fuel Cell Hangar
- View specs →Amendment 0001 - Extend RFP due date for Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- View specs →Amendment 0002 - Extend RFP due date for Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- View specs →Amendment 0003 - Extend RFP due date for Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- View specs →APG Building 5103 Renovationsunder construction
ABERDEEN
- View specs →B162 Water Intrusion and Structural Repairs
Patuxent River
- View specs →CBR B154 & B164 CONSTRUCTION, INDIAN HEAD MD
Indian Head
- View specs →Jennings Randolph Tainter Gate Upgrade
- View specs →Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- View specs →SPECIALIZED MATERIAL FABRICATION BUILDING
Fort George G Meade
- C201671 - Design And Renovate Section Of Lab Be11 In B33 To Accommodate A New Talos Electron Microscope.under construction
· Under $1M
- C201824-Full Preventive Maintenance Service Of All Industrial Chillers To Identify Potential Maintenance Concerns And Enunder construction
· $1M-$10M
- View specs →Construct EHRM Infrastructure Upgrades - Baltimore, MD
- Customer Wants To Use ePlans,A 5-STORY MIXED USE RESIDENTIAL MULTIFAMILY BUILDING WITH 200 UNITS & 22,220 SF OF RETApermitting
Bethesda · $10M-$50M
- Customer Wants To Use ePlans, A new construction facility containing 100 resident rooms for assisted living and memory cpermitting
Potomac · $10M-$50M
- View specs →Centers for Medicare & Medicaid Services Headquarters (CMS) Back on Campus-Phase 4
Baltimore
- Customer Wants To Use ePlans,Garage associated with residential/commercial structure, COMBUILD-1130995. Other Applipermitting
Bethesda · $1M-$10M
- Rehabilitate Maryland Developed Zone Water Distribution System At Assateague Island National Seashoreunder construction
· $1M-$10M
- View specs →B115 Life Extension Center- Lean-to Construction
Patuxent River
- View specs →Building 62 Renovations, Indian Head, MD
Indian Head
- View specs →Combat Capabilities Development Command (CCDC) Building 3072 Renovation Aberdeen Proving Groundunder construction
ABERDEEN
- View specs →Hospital Wayfindingunder construction
Bethesda
- View specs →Repair Roof & Fire Suppression Systems Building 1914
Andrews AFB
- Revision ,4 - Applying for Health Permit for commercial kitchen,Customer Wants To Use ePlansRevision ,3 - INTERIOR DESIGpermitting
Rockville · $50M-$100M
- View specs →USAMRIID Steam Sterilization Plant Effluent Decontamination System, Fort Detrick, Marylandplanning
Frederick
- View specs →Y1DA--512-22-710 EHRM Infrastructure Upgrades - Loch Raven MD - Construction (VA-24-00060549)
Baltimore
- Customer Wants To Use ePlans Interior work only,Renovations of lobbies, roof-level amenities (including rooftop pool andpermitting
Bethesda · $50M-$100M