Maryland · Division 22
Plumbing projects in Maryland
Fixtures, piping, medical gas, water systems. Usually specified by the plumbing engineer. Counted across our 300 highest-priority scored Maryland projects, 14 need this division and 11 are still in planning or permitting.
As of 2026-11-03, 14 of the 300 highest-scored Maryland projects in the SpecIndex index need plumbing, and 11 of those are still in planning or permitting.
Search the full index →- C102231 Design-Build Services, Construct Addition To Bldg 101 Called Niehs Clinical And Computational And Science Buildiplanning
· $100M+
- View specs →Large-Tier Electrical Construction IDIQ
Gaithersburg
- View specs →HAMP CUPOLA WOODWORK REPAIR
- View specs →HAMP: REPLACE WOOD SHINGLE ROOF
Towson
- View specs →Z--HAMP CUPOLA WOODWORK REPAIR
- View specs →Z--HAMP: REPLACE WOOD SHINGLE ROOF
Towson
- C115777 This Contract Award Is For Construction Services For Card Clinic And Administrative Spaces In Building 10 2Nd Flunder construction
· $1M-$10M
- C200102 Bldg. 4 Replace Laboratory Exhaust Fans. This Negative Pressurization Is Vital For Containment Of Hazardous Mateunder construction
· $1M-$10M
- View specs →Amendment 0001 - Extend RFP due date for Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- View specs →Amendment 0002 - Extend RFP due date for Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- View specs →Amendment 0003 - Extend RFP due date for Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- View specs →Jennings Randolph Tainter Gate Upgrade
- View specs →Roof Replacement at Joint Base Andrews Naval Air Facility Washington
JB Andrews
- C201671 - Design And Renovate Section Of Lab Be11 In B33 To Accommodate A New Talos Electron Microscope.under construction
· Under $1M