Minnesota · Division 07

Thermal and Moisture Protection projects in Minnesota · page 6

Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Minnesota projects, 299 need this division and 281 are still in planning or permitting.

As of 2026-11-03, 299 of the 300 highest-scored Minnesota projects in the SpecIndex index need thermal and moisture protection, and 281 of those are still in planning or permitting.

Search the full index →

Showing 251–299 of 299 · page 6 of 6

  • Remodel portions of existing cafe -ACW certificate of occupancy required: no special inspections required: nopermitting

    · Under $1M

  • Remove existing roofing. Install new shingle roof system complete with required underlayment, flashing and trim.permitting

    · Under $1M

  • Remove the existing roof, re-insulate with flat and tapered ISO insulation to meet the required R of 30, install a new fpermitting

    · Under $1M

  • Renovation of existing multi-family building -ACW certificate of occupancy required: no special inspections requirpermitting

    · $1M-$10M

  • Repair and replace portions of walls and roof due to water damage. Note, related to BLDG1178856 -ACW certificate ofpermitting

    · Under $1M

  • REPAIR HOME FROM FIRE DAMAGE. UNIT 1 ONLY ON FIRST FLOOR. REPLACING 3 BAY WINDOWS AND 1 KITCHEN WINDOW. NO OTHER EXTEpermitting

    · Under $1M

  • REPAIR PARKING GARAGE - GOVERNMENT CENTER 2020 MSBC engineer: 63981 - Jendra, Tyler Matthewpermitting

    · Under $1M

  • REPAIR/REMODEL WATER TOWER 2020 MSBC architect: 43014 - Grover, Todd Andreas engineer: 62406 - Gonzalez, Geoffrpermitting

    · Under $1M

  • Replace Concrete Portion of Back Steps (MAA) CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM permitting

    · Under $1M

  • Replacement of Asbestos Flooring for USDA ARS in St. Paul, MN

    Saint Paul

    View specs →
  • Replace metal coping & underlayment on building siding eyebrowpermitting

    · Under $1M

  • Replacing storm windows in a non conditioned entryway stairwell with anderson 100 series windows, 1st and 2nd floors. 4 permitting

    · Under $1M

  • RE-ROOF FLAT ROOF 2020 MSBCpermitting

    · Under $1M

  • RE-ROOF FLAT ROOF 2020 MSBCpermitting

    · Under $1M

  • RE-ROOF FLAT ROOF 2020 MSBCpermitting

    · Under $1M

  • RE-ROOF FLAT ROOF, REPAIR/REPLACE EXTERIOR WALL COVERING, REPLACE DOORS AT 2020 MSBC architect: 54004 - Schulerpermitting

    · Under $1M

  • Residingpermitting

    · Under $1M

  • Restroom remodel -ACW certificate of occupancy required no special inspections required no const type: permitting

    · Under $1M

  • ROOF REPAIR. ENGINEER TO INSPECT CONSTRUCTION AND PROVIDE MINNEAPOLIS INSPECTOR SIGNED LETTER THAT THE NEW ROOF SYSTEM permitting

    · Under $1M

  • Small flat roof only (not the main building) Tear off and re-roof using Mule-hide .060 Mil fully adhered rubber roof syspermitting

    · Under $1M

  • St. Cloud Vahcs Steam Mains Addition And Replacementunder construction

    · $1M-$10M

  • Suf Erfo Repairsunder construction

    · Under $1M

  • SUITE 1900. TENANT IMPROVEMENT. (JJL) certificate of occupancy required: no special inspections required: permitting

    · $1M-$10M

  • Tenant improvement -ACW certificate of occupancy required: no special inspections required: no const typpermitting

    · Under $1M

  • Tenant improvement -ACW certificate of occupancy required: no special inspections required: no const type: permitting

    · Under $1M

  • This Project Is For The Culvert Replacement Construction Services On The Tofte Ranger District, Superior National Forestunder construction

    · Under $1M

  • T/I - "RISE UP CENTER" const type: IIB occupancy: A-3 2020 MSBC occupant load: 843 sprinklepermitting

    · $1M-$10M

  • UNIT 213. REMODEL 2 BATHROOMS. (1) MAIN BATHROOM, (1) MASTER BATHROOM. NO STRUCTURAL WORK. (JJL)permitting

    · Under $1M

  • us bank renovations of the Little Six Club (MAA) certificate of occupancy required: NO mechanical plans required fopermitting

    · Under $1M

  • Window replacement - same size - 64 window openingspermitting

    · Under $1M

  • WINDOW REPLACEMENT This permit authorizes the removal and installation of 5 windows. (sza) 1. For one- or two-fampermitting

    · Under $1M

  • WINDOW REPLACEMENT This permit authorizes the removal and installation of windows. (sza) 1. For one- or two-familpermitting

    · Under $1M

  • alterations and change of occupancy to E occupancy child daycare. certificate of occupancy required yes special insppermitting

    · Under $1M

  • Bathroom remodel -ACW Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE Ppermitting

    · Under $1M

  • Buildout lobby of 39th floor; layout of floor will change from single unit to two units (not included in this scope of wpermitting

    · Under $1M

  • C1DZ--COVID 618-20-111, Renovate Building 223 for Pandemic Storage (Design Build)planning

    View specs →
  • Construct Main Gate Vehicle Inspection Facility

    Minneapolis

    View specs →
  • Construct Vehicle Inspection Facility

    Minneapolis

    View specs →
  • Demolition and removal of damaged and failing exterior wood decks and stairs, along with securing of patio doors to prevpermitting

    · Under $1M

  • Design-Build Maintenance and Repair Army Reserves (MRAR) Fort Snelling B505

    Fort Snelling

    View specs →
  • DESIGN BUILD Renovate Building 223 for Pandemic Storage, C1DZplanning

    Minneapolis

    View specs →
  • DRYWALL, INSULATION AND VAPOR BARRIER. WATER DAMAGE. SEVERAL FLOORS AND UNITS. (JJL)permitting

    · Under $1M

  • east building second floor - remodeling nuclear and CT scanner rooms. certificate of occupancy required no constpermitting

    · $1M-$10M

  • Exterior renovation including playground, fencing, concrete/landscaping -ACW certificate of occupancy required no permitting

    · Under $1M

  • EXTERIOR WORK (PDR19792) SPECIAL INSPECTIONS 2020 MSBCpermitting

    · Under $1M

  • Greenhouse Repair Project, St. Paul, MN

    Saint Paul

    View specs →
  • INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY 15.007 KW INSTALLATION MUpermitting

    · Under $1M

  • INSTALL FLASHING UNDER PARAPET CAP 2020 MSBCpermitting

    · Under $1M

  • Install sika sarnafil 60mil pvc rhinobond roof systempermitting

    · Under $1M