Minnesota · Division 07
Thermal and Moisture Protection projects in Minnesota
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Minnesota projects, 299 need this division and 283 are still in planning or permitting.
As of 2026-11-03, 299 of the 300 highest-scored Minnesota projects in the SpecIndex index need thermal and moisture protection, and 283 of those are still in planning or permitting.
Search the full index →Showing 1–50 of 299 · page 1 of 6
- View specs →Project # 618-26-701 - EHRM - Infrastructure Upgrades - Main Computer Room Update - Minneapolis VAMC - Minneapolis, MN
Minneapolis
- View specs →Building 2-3 Roof Replacement (Morris, MN)
Morris
- View specs →Z2DA--PN: 618-CSI-240, SPS Equip Site Prep (MPLS)
Minneapolis
- View specs →Z--PIPE - REHAB VISITOR CENTER RESTROOMSunder construction
Pipestone
- View specs →GAOA SUF Bunkhouse Replacement at Seagull Guard Station.
Grand Marais
- remodel floors 2 through 5 - main west hospital building. certificate of occupancy required no const type: 1permitting
· $10M-$50M
- View specs →DOMOPS Storage Building
Duluth
- View specs →EHRM Infrastructure Upgrades Construction Design-Bid Build Project at the Minneapolis VA Medical Center (VAMC)
Minneapolis
- Expansion of data center space to 3rd and 4th Floors and roof top mechanical upgrades. certificate of occupancy requipermitting
· $100M+
- View specs →Facility Infrastructure Inprovements
GRAND RAPIDS
- View specs →General Construction Services - International Falls Land Port of Entry Project
International Falls
- View specs →NRP FY20 Roofing Construction Project 25
- View specs →Office and Laboratory Remodel - with Options
East Grand Forks
- View specs →PIPE COLLECTIONS REHAB
Pipestone
- View specs →Repair Entry Control Point
17000
- View specs →Roof Replacement
Morris
- View specs →Small Arms Rangeunder construction
Duluth
- View specs →Tower and Shelter Replacement at the Warroad, MN Site
- View specs →Z1DA--Renovate MH Ward 1L, 1H and 1K - Minneapolis VAMCdeadline not recorded
- View specs →Z--PIPE COLLECTIONS REHAB
Pipestone
- 656-22-342, Preserve Building 10 Windowsunder construction
· $1M-$10M
- Office tenant improvement on 7th floor -ACW certificate of occupancy required: no special inspections required: npermitting
· $1M-$10M
- REMODEL 'FREUNDHAUS' ELIMINATE 2 DWELLING UNITS certificate of occupancy required: YES const type: VB ocpermitting
· $1M-$10M
- View specs →Y1DA--St. Cloud VAHCS Replacement/Addition Steam Mains Presolicitation Notice
Saint Cloud
- installation of exterior hydrogen recycling/collection equipment. engineer: sherman #52740 VAA engineerspermitting
· Under $1M
- T/I UNIT 301 & 400 const type: IIA occupancy: B 2020 MCCEB, LEVEL 2 ALTERATION occupant load: permitting
· Under $1M
- UPDATE UNIT #607 const type: IA occupancy: R-2 2020 MSBC architect: 23018 - Mackey, James Apermitting
· Under $1M
- View specs →Y1DA--656-26-201 Replace Carpet FY26 NRM 36C263-26-AP-2448
Saint Cloud
- View specs →23-R-1002 - DOMOPS Storage
Duluth
- 656-12-222 Replace Windows Bldg 4, 8 & 9 - Stcunder construction
· $1M-$10M
- construct 228 unit 5 story apartment building certificate of occupancy required: yes Note: R2 Apartment with S2 (enpermitting
· $10M-$50M
- View specs →Construction of an Aerial Port Facilitydeadline not recorded
Minneapolis
- INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY ___1,200_ KW SOLAR CHECKLpermitting
· $1M-$10M
- New fitness studio in existing building -ACW certificate of occupancy required: yes special inspections required:permitting
· Under $1M
- View specs →OFFICE RENOVATION - Resident Engineer, Lock & Dam #2, Hastings MN
Hastings
- View specs →Repair Fire Suppression B220
Duluth
- Replace finishes in common rooms and exterior patio certificate of occupancy required: no special inspections requirepermitting
· Under $1M
- View specs →Roof Replacement at Building 8, Morris, MN
Morris
- View specs →Solicitation: Replacement of Tactical Communications Tower in Warroad, MN
Warroad
- View specs →Y--Fergus Maintenance Building
Otter Tail County
- alterations in lower-level heart hospital for stretcher/bed repair shop. 6th floor main hospital off ice remodel (ROB permitting
· Under $1M
- Conversion of Federal Plaza Hotel into housing for People Serving people, including remodel of portions of basement and permitting
· Under $1M
- (DMH-Pdox) 50'X24' OUTDOOR MASONRY CONSESSIONS BUILDING WITH MENS & WOMENS RESTROOMS. - 2020 MNSBC. PDR - PLAN21938 permitting
· Under $1M
- Levels 4 & 5: Remove & replace portion of flooring/ceiling - Light plumbing work - Security improvements - Fire protectpermitting
· $1M-$10M
- PER BUILDING OFFICIAL: EXPANSION OF THE SCOPE OF EXISTING PERMITBLDG1130446 FOR RE-ANCHORING TRAVERTINE CLADDING. THEpermitting
· $1M-$10M
- Re-roofing Layover TPO ISO Reuse Metalpermitting
· Under $1M
- Re-roof with 60 mil adhered TPO, install 1.5" polyisocyanurate insulation, 50 ft. walking pads, 24-gauge sheet metal at permitting
· Under $1M
- SAUNA AND PERGOLA ON PATIO. SAUNA IS A PREFAB KIT. MISC. PATIO REPAIRS. DOOR MUST BE 36" WIDE W ADA HARDWARE. (JJL) permitting
· Under $1M
- SUITE 1700. TENANT REMODEL. (JJL) certificate of occupancy required: no special inspections required: no permitting
· Under $1M
- upgrade finishes in existing lower-level surgical patient prep and recovery area. certificate of occupancy required permitting
· $1M-$10M