Missouri · Division 26
Electrical projects in Missouri · page 3
Lighting, switchgear, generators, distribution. Usually specified by the electrical engineer. Counted across our 300 highest-priority scored Missouri projects, 156 need this division and 82 are still in planning or permitting.
As of 2026-11-03, 156 of the 300 highest-scored Missouri projects in the SpecIndex index need electrical, and 82 of those are still in planning or permitting.
Search the full index →Showing 101–150 of 156 · page 3 of 4
- Bank Stabilization And Navigation Project- Navigation Channel Structures Repairs- Stone Placement Of 363,600 Tonscompleted
· $10M-$50M
- Eleven Point And Poplar Bluff Districts Roadway Surface Blading For The Mark Twain National Forest.under construction
· Under $1M
- View specs →Emergent Boiler Repair KCMCplanning
Kansas City
- Erhm Infrastructure Upgrades Construction Kansas Cityunder construction
· $10M-$50M
- Flightline Fueling Facilityunder construction
· $10M-$50M
- Flw Ait Barracks Bldg 1013completed
· $10M-$50M
- Igf::Ot::Igf Turkey Creek Interceptor, Is Flood Reduction Project For The Greater Ks And Mo Urban Areas Around Central Kcompleted
· $10M-$50M
- Intake Gate Replacement - Unit 3, Table Rock Powerhouse, Taney County, Missouri.completed
· $1M-$10M
- Reinforced Concrete Floodwallcompleted
· $10M-$50M
- Renovate - Bldg. 730under construction
· $10M-$50M
- Repair L-550 Levee, Missouri River, Mocompleted
· $10M-$50M
- The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted
· $10M-$50M
- View specs →Z2DA--589-22-465 FCA Correct Grounds Deficienciesunder construction
Kansas City
- View specs →Amendment 0004, Install Dedicated Pharmacy Air Handler
- Construction & Maintenance Of Riversunder construction
· $10M-$50M
- Construct Urgent Care Clinic Building Addition At The Jefferson Barracks Va Medical Center (Vamc) St. Louis, Missouriunder construction
· $10M-$50M
- Contractor To Provide Construction Services To Complete The Ehrm Project At The Columbia Mo Vamc.completed
· $10M-$50M
- For Construction Of Flood Walls, Earthen Levees, Interior Storm Water Piping, Tributary Channel Realignment And Bank Stacompleted
· $10M-$50M
- Inpatient Medical Bed Addition Minor Construction Project At Kansas City Va Medical Centerunder construction
· $10M-$50M
- Jbnc Phase 5C Constructioncompleted
· $10M-$50M
- View specs →J--JEFF Backflow Replacement (3)under construction
Saint Louis
- Ld25 Downstream Approach Guide Cellunder construction
· $10M-$50M
- Ld25-Removal/Demolition Of Existing Cellcompleted
· $1M-$10M
- Levee And Relief Wells Constructioncompleted
· $10M-$50M
- Priority: High Mission Essential Introduction: This Project Will Improve A Forest Service Road That Has Deteriorated Dueunder construction
· Under $1M
- Remote Inspection Facility Basecompleted
· $10M-$50M
- Saint Louis Demolition And Paving At Jefferson Barracks Medical Facilitycompleted
· $10M-$50M
- The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted
· $10M-$50M
- This Purchase Order Is Being Created To Provide The Payment Of The Settlement Amount Of $336,292.40 For The Armed Serviccompleted
· Under $1M
- Waterline Relocationunder construction
· $10M-$50M
- View specs →Z2DA--589A4-25-102, Install Dedicated Pharmacy Air Handler
Columbia
- View specs →Z--Gateway Arch NP - Sidewalk Leveling
Saint Louis
- Clearing And Snaggingunder construction
· $1M-$10M
- Construction Of Ammunition Handling Area In Fort Leonard Wood, Missouri.completed
· $1M-$10M
- Construction Services To Remove Navigation Obstructions On The Missouri River At River Mile 67-69. The General Scope Of under construction
· $1M-$10M
- Design-Build Contract For The National Geospatial Intelligence Agency For The Arnold Electrical Substation Replacement Icompleted
· $10M-$50M
- Follow On Task Order For W91S724F2418 From The Sps System To Acws.completed
· $1M-$10M
- Kansas City, Mo - Mci Rtr Tower Replacements (3 Towers) At Mci In Kansas City, Mo In Accordance With The Specifications under construction
· Under $1M
- View specs →LCAAP Contaminated Waste Plant W519TC-26-R-ACWP
Independence
- Mo Erfo Nps Ozar 2020-1(1): The Project Consists Of The Reconstruction Of Round Spring Cave Trail And Pedestrian Bridge,under construction
· $1M-$10M
- Msd Infrastructure Repaircompleted
· $1M-$10M
- Nesp Ld25 Wall Mod - Phase 1completed
· $1M-$10M
- Remodel Barracks 629 Rftop 2517under construction
· $1M-$10M
- View specs →Renovation of the WAFB Challenger Dorms
- Site Preparation For Temporary Building, Ucic-Mcx Compound, Taney County, Missouri. All Shall Be Complete Within Sixty (completed
· $1M-$10M
- The General Contractor Shall Provide All Labor, Materials, Equipment, Qualified Supervision, And Other Items To Completecompleted
· $10M-$50M
- The General Scope Of The Work Includes, But Is Not Limited To Dismantling, Demolition, Removal, And Disposal Of Navigaticompleted
· $1M-$10M
- The Purpose Of This Administrative Modification Is To Notify The Contractor Of The Migration Of This Award To The Army Cunder construction
· $1M-$10M
- The Us Army Corps Of Engineers, Kansas City District Requires Construction Services For Phase 2 Of The Explosive Waste Icompleted
· $1M-$10M
- View specs →Z2DA--589A7-21-132 Construct Centralized Emergency Power System
Columbia