North Dakota · Division 26

Electrical projects in North Dakota · page 2

Lighting, switchgear, generators, distribution. Usually specified by the electrical engineer. Counted across our 300 highest-priority scored North Dakota projects, 279 need this division and 138 are still in planning or permitting.

As of 2026-11-03, 279 of the 300 highest-scored North Dakota projects in the SpecIndex index need electrical, and 138 of those are still in planning or permitting.

Search the full index →

Showing 51–100 of 279 · page 2 of 6

  • Construction Of The Red River Structure Of The Fargo Moorhead Metropolitan Area Flood Risk Management Projectunder construction

    · $100M+

  • Industry Feedback for Draft Requirements, Solicitation, and Request for White Papers for Other Transaction (OT) - Initiaplanning

    Minot AFB

    View specs →
  • Minot Helo Ops Facility Construction, Minot Afb, Nd.under construction

    · $100M+

  • Nd Tewaukon Nwr - Small Home Supply And Deliveryunder construction

    · Under $1M

  • Repair West Aircraft Apronunder construction

    · Under $1M

  • 1A Bridge Conference Roof Repair

    Mandan

    View specs →
  • Design-Build Services For The New Construction Of The Dunseith Nd Lpoe, 10098 Us-281, Dunseith, Nd 58329under construction

    · $50M-$100M

  • Fmm Southern Embankment Se-2Bunder construction

    · $50M-$100M

  • I-29 Grade Raise And Borrow Ditch Crossing Of The Fargo Moorhead Metropolitan Area Flood Risk Management Projectcompleted

    · $50M-$100M

  • I Field Project

    Mandan

    View specs →
  • Igf::Ot::Igf Fargo Diversion Inlet Structurecompleted

    · $50M-$100M

  • Nd Omad 2024(1) Minuteman Missile Access Roads The Purpose Of This Construction Contract Is To Re-Gravel Several Miles completed

    · $1M-$10M

  • Provide All Equipment And Labor To Install Fiber Optic Cabling Between Buildings 744 To 879 And 896.under construction

    · Under $1M

  • Wild Rice River Structure.completed

    · $50M-$100M

  • Ehrm Tier Two Infrastructure Upgrades At Fargo Vamc - Project # 437-21-210 Fargo, Ndunder construction

    · $10M-$50M

  • Fmm Se-3under construction

    · $10M-$50M

  • Nd Ftnp Thro 11(10) South Unit Scenic Loop Slide Repair Road Reconstructioncompleted

    · $10M-$50M

  • REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS

    View specs →
  • Repair/Renovate Dental Sterilization Processing Department (Spd) And Repair Physical Therapy (Pt), 319Th Medical Group Cunder construction

    · $1M-$10M

  • 437-23-105 Replace Fire Alarm Systemunder construction

    · $1M-$10M

  • B546 Missile Command Hq Renovationcompleted

    · $10M-$50M

  • Construct Emergency Power Plant (Epp) - Fuel Storage Facility At Cavalier Space Force Station, North Dakotaunder construction

    · $10M-$50M

  • Construction Of A New Line Of Drains At The West End Of Garrison Dam. This Is A Dam Safety Project.under construction

    · $1M-$10M

  • Fmm Se-1Bunder construction

    · $10M-$50M

  • Nd Ftfw Desl 11(4) Auto Tour Route Construction Contractcompleted

    · $1M-$10M

  • Oxbow, Hickson, And Bakke Ring Levee Of The Fargo Moorhead Metropolitan Flood Risk Management Projectunder construction

    · $10M-$50M

  • Phase Ii Renovation Of Building 607 At Grand Forks Afb, Nd For A Satellite Support Facility (Ssf)under construction

    · $10M-$50M

  • Replace Mtf Roofs And Repair Building Envelope, 319Th Medical Group Clinic Building 109, Grand Forks Air Force Base, Norunder construction

    · $1M-$10M

  • The Construction Contract Is To Provide All Of The Required Services To Complete The Electronic Health Records Modernizacompleted

    · $10M-$50M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Necunder construction

    · $10M-$50M

  • This Contract Is For The Transformation Of Building 607 From Administrative Offices To An Operations Center. Transformatcompleted

    · $1M-$10M

  • This Project Consists Of Constructing A 25,600 Sf Precast Concrete Building With A Standing Seam Metal Roof. A Portion Ocompleted

    · $10M-$50M

  • Vetter Dentalplanning

    Fargo

  • 4 Renovation And Repair Projects, Minot Afb, Nd Sba Acceptance Ci1749560530Wcontains Cuiunder construction

    · $1M-$10M

  • Belcourt Multiplex For Constructionunder construction

    · $10M-$50M

  • Construction And Repair Of Fuel Facilities At Minot Afbcompleted

    · $1M-$10M

  • Construction Cost Onlycompleted

    · $1M-$10M

  • Minot AFB Flooring MACC FY26

    Minot AFB

    View specs →
  • Nd Flap Sdn 7Ne(1) Hoffer Lake Access Road - Construction Contractcompleted

    · $1M-$10M

  • Nd - Tewaukon National Wildlife Refuge (Nwr) - Replace Water Distribution System Description: The U.S. Fish And Wildlifunder construction

    · Under $1M

  • Replace Water Supply Infrastructure, Mandancompleted

    · $1M-$10M

  • The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Neccompleted

    · $10M-$50M

  • 437-22-108, Place Chilled Water Pumps On Epower - Farunder construction

    · Under $1M

  • 437-25-103, 3 Year Electrical Testing & Maintenanceunder construction

    · $1M-$10M

  • Belcourt Emergency Department Exterior Improvementscompleted

    · $1M-$10M

  • Construct Special Vehicle Maint Facility - Minot Afbcompleted

    · $1M-$10M

  • Contractor Shall Provide A Firm-Fixed-Price For All Labor, Personnel, Equipment, Materials, Tools, Personal Protective Ecompleted

    · $1M-$10M

  • Corrosion Contol B210 This Project Consists Of Remodeling A 23,000 Sf Block And Brick Aircraft Hangar Into A Corrosion Ccompleted

    · $1M-$10M

  • Design & Construct Munitions Maint Inspection Facilitycompleted

    · $1M-$10M

  • Fargo Moorhead Metropolitan Area Flood Risk Management Project - Southern Embankment Reach Se-2Acompleted

    · $1M-$10M