North Dakota · Division 07

Thermal and Moisture Protection projects in North Dakota · page 3

Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored North Dakota projects, 274 need this division and 138 are still in planning or permitting.

As of 2026-11-03, 274 of the 300 highest-scored North Dakota projects in the SpecIndex index need thermal and moisture protection, and 138 of those are still in planning or permitting.

Search the full index →

Showing 101–150 of 274 · page 3 of 6

  • Nd-Long Lake Nwr-Construct Multi-Purposecompleted

    · $1M-$10M

  • Removal And Disposal Acm-Optioncompleted

    · $1M-$10M

  • Bismarck O And M Service Center, Vehicle Storage Bldg. No. 4, North Dakotacompleted

    · $1M-$10M

  • COMPUTER ROOM AIR CONDITIONER (CRAC) REPLACEMENT at GRAND FORKS AFB, NDplanning

    Grand Forks AFB

    View specs →
  • Construct Dorm 131 Minot Afb, Ndcompleted

    · $1M-$10M

  • Critical Repairs At Various Land Ports Of Entry.completed

    · $1M-$10M

  • Minot Afb Roof Replacement Projectunder construction

    · $1M-$10M

  • Pn: 437-23--145 Replace Select Flooring At The Fargo Vahcscompleted

    · $1M-$10M

  • Project Gp22Tm300H10 Belcourt Rtu & Cabinet Replacementunder construction

    · Under $1M

  • Repair Select Roofs Fargo, Ndcompleted

    · $1M-$10M

  • Restore Portions Of The English Coulee Diversion Channel Of The Grand Forks Project. This Includes Damage To The Channelcompleted

    · Under $1M

  • Standing Rock Agency Quarters Demolition And Renovation Project This Is A Task Order Issued Under The Bia'S Design/Builcompleted

    · $1M-$10M

  • The Contractor Shall Provide All Labor, Materials, Supplies, And Services To Expand The Existing Waiting Room And Parkincompleted

    · $1M-$10M

  • 437-23-103, Update Wing 4Bunder construction

    · $1M-$10M

  • Fort Yates New Quarters Duplex Constructioncompleted

    · Under $1M

  • Garrison Riverdale Feeder Relocation, Garrison Dam, North Dakota; Project Gr00109completed

    · $1M-$10M

  • Horse Creek Culvert Replacement Phase Ii, Road Realignment, Abandoned Roadway Obliteration, Structure Removalcompleted

    · Under $1M

  • Install Exterior Doors, Grand Forks, Nd And Install Exterior Doors, Grand Forks, Ndunder construction

    · Under $1M

  • Multi-Door Replacement & Repair, Gp25Tm400H06completed

    · Under $1M

  • N3203422 Minot Probation Office

    Minot

    View specs →
  • Nd Ftfw Whhi 10(5) White Horse Hill Ngp Auto Tour Route The Purpose Of This Project Is To Improve Overall Access, Safetycompleted

    · $1M-$10M

  • Repair Fire Suppression B217completed

    · Under $1M

  • Upgrade Fiber Optic Cable Connectivity Between B1085 To Apa Ecp, Four 2Gwlan Aps On Apa, And Eight (8) Apa Conex Boxes.completed

    · Under $1M

  • 437-24-105 Correct Awe Boiler Plant Findings Fargo, Ndcompleted

    · Under $1M

  • Belcourt Replace Steam Boiler Design Buildcompleted

    · Under $1M

  • BRL Security Gates

    Fargo

    View specs →
  • Facility Repairs, Grand Forks, Ndcompleted

    · Under $1M

  • ND0037ZZ USMS Ballistic Window Installation Bismarck 3408285

    Bismarck

    View specs →
  • ND0037ZZ USMS Egress Modifications Bismarck 3409747

    Bismarck

    View specs →
  • Nd-Crosby Wmd-Emergency Storm Repair Of Office And Housing Exterior Walls, Roof, Soffit, And Windowscompleted

    · Under $1M

  • Outdoor Recreation Sport Courtcompleted

    · Under $1M

  • Pn: 437-21-235 Ehrm Ddpocompleted

    · Under $1M

  • Project Includes Grading, Gravel, And Stone Work At Lf Sites L-4, L-7, L-8, L-9, L-10, L-11, M-2, And M-3 With The Optiocompleted

    · Under $1M

  • Project Involves Decommissioning And Installing New Cathodic Protection Deep Well Anode Bed Sat Both Missile Alert Facilcompleted

    · Under $1M

  • Renovate Areas Of B546 To Comply With Nc3 Requirements To Include The Removal And Installation Of Pass-Through Windows Icompleted

    · Under $1M

  • Repair Aircraft Ramp Throat Areacompleted

    · Under $1M

  • Replacement Of Windows For Building 211 At Minot Afb, Nd.under construction

    · Under $1M

  • Reroof Quarters Unitscompleted

    · Under $1M

  • The It Fiber Infrastructure Macc Indefinite Delivery-Indefinite Quantity Idiq Contract Will Be Utilized To Execute Projecompleted

    · Under $1M

  • Upgrade Fiber Optic Cable Connectivity Between Information Transfer Building (Itb) 121 To B122, B123, B205, B207, B280, completed

    · Under $1M

  • Upgrade Fiber Optic Cable Connectivity Between Information Transfer Building (Itb) 546 To B246, B248, B543, And B544.completed

    · Under $1M

  • Fargo Substation, 230-Kv Bus Upgrades, Ndcompleted

    · Under $1M

  • Grand Forks Office Buildout

    Grand Forks

    View specs →
  • Grand Forks Substation, 69Kv Capacitor Bank Replacement, North Dakotacompleted

    · Under $1M

  • Kitchen Oven Wiringcompleted

    · Under $1M

  • ND0550AO APHIS Insulation Corrections Pembina ND

    Pembina

    View specs →
  • Replace Maah Daah Hey Trail Bridge And Mp 143 Which Is In Failure Mode And Is A Critical Part Of The Nationally Recognizunder construction

    · Under $1M

  • The It Fiber Infrastructure Macc Indefinite Delivery-Indefinite Quantity Idiq Contract Will Be Utilized To Execute Requicompleted

    · Under $1M

  • 437-25-195 Emergency Replace Bldg. 1 Transformerscompleted

    · Under $1M

  • Building 218 Renovationcompleted

    · Under $1M