Nebraska · Division 03

Concrete projects in Nebraska

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Nebraska projects, 61 need this division and 0 are still in planning or permitting.

As of 2026-11-03, 61 of the 300 highest-scored Nebraska projects in the SpecIndex index need concrete, and 0 of those are still in planning or permitting.

Search the full index →

Showing 1–50 of 61 · page 1 of 2

  • National Shrine Projectunder construction

    · Under $1M

  • 636-26-305 Correct Parking Garage Safety Deficiencies - Design/Buildunder construction

    · $1M-$10M

  • The Stegall Substation Stage 07 Phase 01 Project To Replace End Of Life Equipment And Installs A New Control Building.under construction

    · Under $1M

  • Emergency Grain Bin Replacementunder construction

    · Under $1M

  • Sidney Substation Breaker Replacement; Sd566 Sd662 Sd862 Breaker Replacements: Demolition And Site Development, Foundatiunder construction

    · Under $1M

  • Construct Utility Corridor For Sentinel Pilot Projectunder construction

    · $1M-$10M

  • Grand Island, Ne- Construction And Installation Of Shelter @ Grib Rcag In Accordance With The Attached Specifications Anunder construction

    · Under $1M

  • Work For This Project Consists Of Constructing A Roadway Embankment With Turnouts And Lead-Off Ditches; Installing Speciunder construction

    · Under $1M

  • Design And Construct Nc3 Alert Facilitycompleted

    · $100M+

  • Milstar Satellite Communications Station/ Design/Bid/Build Campus Facilities.completed

    · $100M+

  • Missouri River Levee R562 Repairsunder construction

    · $10M-$50M

  • 636-502 Construct Sterile Processing Service - Omaha Vamcunder construction

    · $10M-$50M

  • Construct Security Campuscompleted

    · $50M-$100M

  • 636C3164 Ehrm Infrastructure Upgrade - Omahacompleted

    · $10M-$50M

  • Construct Combined Energy Plant, Va Nebraska Western Iowa Health Care Systemcompleted

    · $10M-$50M

  • Construct Oss/Sere Facilitycompleted

    · $10M-$50M

  • R-613 2019 Follow-On Repairsunder construction

    · $1M-$10M

  • Replace The Instrument Landing System (Ils) For Runway 32L (Enf) And Runway 18 (Ppy) At Omaha Eppley Airfield, Omaha, Neunder construction

    · $1M-$10M

  • Construct Lrs Campuscompleted

    · $10M-$50M

  • Contruct Flighline Facilitiy To 5Ft Outscompleted

    · $10M-$50M

  • Design And Construct The Consolidated Recreation Facility At Offutt Afb, Ne.completed

    · $10M-$50M

  • Fuel Tank 550 And 580 Repair And Maintenanceunder construction

    · $1M-$10M

  • Fy22 Bank Stabilization & Navigation Project - North (Bsnp), River Mile 600 To 740, Missouri River, Ia, Mo, Necompleted

    · $10M-$50M

  • Fy22 Bank Stabilization & Navigation Project - South (Bsnp), River Mile 498 To 600, Missouri River, Ia, Mo, Necompleted

    · $10M-$50M

  • The General Contractor Is To Provide All Construction And Related Services To Complete The Ehrm Infrastructure Upgrades completed

    · $10M-$50M

  • Grave Site Expansion Omaha National Cemeterycompleted

    · $10M-$50M

  • Harlan Salt Cedar Eradication Projectcompleted

    · $1M-$10M

  • Middle Logan Creek Phase Ii Constructioncompleted

    · $1M-$10M

  • Renovate Oft-5 Flight Simulator, B493completed

    · $1M-$10M

  • Repair Electrical Substation B565 At Offutt Afb, Necompleted

    · $1M-$10M

  • Work For This Project Consists Of Resurfacing Up To 2.70 Designated Miles Of Circle Road Nfsr 203 Per Base Item And Optiunder construction

    · Under $1M

  • 890Cm3014 Gravesite Expansion, Fort Mcpherson National Cemetery, Maxwell, Nebraskacompleted

    · $1M-$10M

  • Ehrm Infrastructure Upgrades - Fm, A/E Cps In Omaha, Neunder construction

    · $1M-$10M

  • Fabrication Of Draft Tube Bulkheadscompleted

    · $1M-$10M

  • Fuel System Repairs As A Result Of Omaha Flooding 2019completed

    · $1M-$10M

  • Nko Parking Lot Construction At Offutt Afb, Necompleted

    · $1M-$10M

  • 636-23-301, D/B Improve Stormwater Detentioncompleted

    · $1M-$10M

  • Bessey Nursery Greenhouse Re-Procurementcompleted

    · $1M-$10M

  • Cedar Creek Levee Rehab Cass County, Necompleted

    · Under $1M

  • Construct Cafeteria Revolving Door B1000completed

    · $1M-$10M

  • Repair Youth Center B5805 At Offutt Afb, Necompleted

    · $1M-$10M

  • Upgrade Campus Signage At Omaha Vamccompleted

    · $1M-$10M

  • W59Xqg60775213under construction

    · Under $1M

  • 890-Mr25Nrm26-022 Correct Fca Deficiencies At Buildings 3001 And 3002 At Fort Mcpherson National Cemeterycompleted

    · Under $1M

  • 890-Nrm24-010 Repair/Restore Brick And Mortar Joints At Building 3003 At Fort Mcpherson National Cemeterycompleted

    · Under $1M

  • Construct Gasnt Transportable Storage Facility. This Project Is To Construct A 1000Sf Facility For Gasnt Equipment And Acompleted

    · $1M-$10M

  • Ne-Rainwater Bsn Mnd-Cold Storage Bldgcompleted

    · Under $1M

  • Omaha, Ne - Ppy Malsr Stair Installation In Omaha, Ne In Accordance With The Specifications And Drawings.under construction

    · Under $1M

  • Repair Cag Control Spaces B1000 At Offutt Afb, Necompleted

    · Under $1M

  • Repair Interior Finishes - B462 At Offutt Afb, Necompleted

    · $1M-$10M