Nebraska · Division 03

Concrete projects in Nebraska · page 2

Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Nebraska projects, 64 need this division and 0 are still in planning or permitting.

As of 2026-11-03, 64 of the 300 highest-scored Nebraska projects in the SpecIndex index need concrete, and 0 of those are still in planning or permitting.

Search the full index →

Showing 51–64 of 64 · page 2 of 2

  • This Project Is To Replace And Repair B73 Parking Lot Per The Attached Drawings And Specifications On Offutt Afb, Ne.completed

    · Under $1M

  • Upgrade Ahus #3 #8, B301completed

    · Under $1M

  • 890-Mr25Nrm26-022 Correct Fca Deficiencies At Buildings 3001 And 3002 At Fort Mcpherson National Cemeterycompleted

    · Under $1M

  • 890-Nrm24-010 Repair/Restore Brick And Mortar Joints At Building 3003 At Fort Mcpherson National Cemeterycompleted

    · Under $1M

  • Fitness - Soccer Pitch Repair At Fieldhousecompleted

    · Under $1M

  • Install An Alternate Vehicle Turnaround Pad On The South Side Of The C2F In Accordance With The Task Order Project Scopecompleted

    · Under $1M

  • Jcn: 18062790, Replace Existing Fire Alarm System In Its Entirety At The R90 Tracon.completed

    · Under $1M

  • Repair East Planter Box - B1000completed

    · Under $1M

  • This Project Consists Of Replacing The Existing Daikin Vrv Hvac System Located In The Southwest Corner Of B636, Compositcompleted

    · Under $1M

  • W59Xqg60775197 - A1010-Ed - 2024: L-575 Missouri River Levee [572133] Soil Sampling Terrconunder construction

    · Under $1M

  • 935-Mr25-004 Repair Roof Leaks, Down Spouts At Maintenance Building, Administrative Building, And Honor Guard Building Acompleted

    · Under $1M

  • Construct Antenna Bases - B1000 At Offutt Afb, Necompleted

    · Under $1M

  • Contractor To Supply All Labor, Equipment, And Materials For Preparing And Paving Concrete Pads At Gavins Point Project completed

    · Under $1M

  • Establish And Install Sustainable Walkways, Plazas, And Raised Garden Beds Between Parking Lots While Enhancing The Overcompleted

    · Under $1M