Nebraska · Division 07
Thermal and Moisture Protection projects in Nebraska · page 2
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Nebraska projects, 118 need this division and 40 are still in planning or permitting.
As of 2026-11-03, 118 of the 300 highest-scored Nebraska projects in the SpecIndex index need thermal and moisture protection, and 40 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 118 · page 2 of 3
- Construct Security Campuscompleted
· $50M-$100M
- 636C3164 Ehrm Infrastructure Upgrade - Omahacompleted
· $10M-$50M
- View specs →B456, NAOC Lower Lot Fence & Power Installation
Offutt AFB
- View specs →B457 Hanger 2&4 120v Outlet
Offutt AFB
- View specs →CHADRON WORK CENTER SHOP ROOF REPLACEMENTSunder construction
Chadron
- Construct Combined Energy Plant, Va Nebraska Western Iowa Health Care Systemcompleted
· $10M-$50M
- Construct Oss/Sere Facilitycompleted
· $10M-$50M
- R-613 2019 Follow-On Repairsunder construction
· $1M-$10M
- View specs →Replace Chiller 2, B500
0
- Replace The Instrument Landing System (Ils) For Runway 32L (Enf) And Runway 18 (Ppy) At Omaha Eppley Airfield, Omaha, Neunder construction
· $1M-$10M
- View specs →2WS/557WW Demountable Wallsplanning
Offutt AFB
- View specs →B1000 Carpet Replacement
0
- Construct Lrs Campuscompleted
· $10M-$50M
- Contruct Flighline Facilitiy To 5Ft Outscompleted
· $10M-$50M
- Design And Construct The Consolidated Recreation Facility At Offutt Afb, Ne.completed
· $10M-$50M
- Fuel Tank 550 And 580 Repair And Maintenanceunder construction
· $1M-$10M
- Fy22 Bank Stabilization & Navigation Project - North (Bsnp), River Mile 600 To 740, Missouri River, Ia, Mo, Necompleted
· $10M-$50M
- Fy22 Bank Stabilization & Navigation Project - South (Bsnp), River Mile 498 To 600, Missouri River, Ia, Mo, Necompleted
· $10M-$50M
- The General Contractor Is To Provide All Construction And Related Services To Complete The Ehrm Infrastructure Upgrades completed
· $10M-$50M
- View specs →B200 Fence and Surveillance Upgrades/Elkhorn Communications Site
Elkhorn
- B-21 Weapons Release System Shop (WRSS), Ellsworth Air Force Base, South Dakotaunder construction
Offutt AFB · $1M-$10M
- Grave Site Expansion Omaha National Cemeterycompleted
· $10M-$50M
- Harlan Salt Cedar Eradication Projectcompleted
· $1M-$10M
- Middle Logan Creek Phase Ii Constructioncompleted
· $1M-$10M
- View specs →ODF-H FY26 Asbestos Abatement and Demolition
Republican City
- Renovate Oft-5 Flight Simulator, B493completed
· $1M-$10M
- Repair Electrical Substation B565 At Offutt Afb, Necompleted
· $1M-$10M
- Work For This Project Consists Of Resurfacing Up To 2.70 Designated Miles Of Circle Road Nfsr 203 Per Base Item And Optiunder construction
· Under $1M
- View specs →Y1DZ--PN: 636-26-305 Correct Parking Garage Safety Deficiencies (OM) 2237: 636-26-3-5297-0001under construction
Omaha
- 890Cm3014 Gravesite Expansion, Fort Mcpherson National Cemetery, Maxwell, Nebraskacompleted
· $1M-$10M
- Ehrm Infrastructure Upgrades - Fm, A/E Cps In Omaha, Neunder construction
· $1M-$10M
- Fabrication Of Draft Tube Bulkheadscompleted
· $1M-$10M
- Fuel System Repairs As A Result Of Omaha Flooding 2019completed
· $1M-$10M
- Nko Parking Lot Construction At Offutt Afb, Necompleted
· $1M-$10M
- NKO Parking Lot Construction - Offutt Air Force Base, Nebraskaunder construction
Offutt AFB · $1M-$10M
- 636-23-301, D/B Improve Stormwater Detentioncompleted
· $1M-$10M
- Bessey Nursery Greenhouse Re-Procurementcompleted
· $1M-$10M
- Cedar Creek Levee Rehab Cass County, Necompleted
· Under $1M
- Construct Cafeteria Revolving Door B1000completed
· $1M-$10M
- View specs →Install New 97th IS Air Handling Unit, B301 - Offutt AFB, NE
Offutt AFB
- View specs →J041--AHU PM & Filter Evaluation
Omaha
- Repair Youth Center B5805 At Offutt Afb, Necompleted
· $1M-$10M
- Upgrade Campus Signage At Omaha Vamccompleted
· $1M-$10M
- W59Xqg60775213under construction
· Under $1M
- Construct Gasnt Transportable Storage Facility. This Project Is To Construct A 1000Sf Facility For Gasnt Equipment And Acompleted
· $1M-$10M
- Ne-Rainwater Bsn Mnd-Cold Storage Bldgcompleted
· Under $1M
- Omaha, Ne - Ppy Malsr Stair Installation In Omaha, Ne In Accordance With The Specifications And Drawings.under construction
· Under $1M
- Repair Cag Control Spaces B1000 At Offutt Afb, Necompleted
· Under $1M
- Repair Interior Finishes - B462 At Offutt Afb, Necompleted
· $1M-$10M
- Repair Water Damage To B303 Caused In December 2022 General Construction 8(A) Idiq - See Attached Basic Scope And Clin Fcompleted
· Under $1M