New Hampshire · Division 26
Electrical projects in New Hampshire
Lighting, switchgear, generators, distribution. Usually specified by the electrical engineer. Counted across our 59 highest-priority scored New Hampshire projects, 59 need this division and 6 are still in planning or permitting.
Search the full index →- View specs →This Project Is For The Reconstruction Of Rob Brook Road Bridge On The White Mountain National Forest. Work Includes Butplanning
· $1.7M
- View specs →Lakeside Road Rehabilitation (Umbagog Nwr)under construction
· $299,434
- View specs →Contract For The Griswold Valve Removal Project At Boston Center Nashua, Nh. Project Is To Shut Down And Drain The Boilunder construction
· $90,603
- View specs →Construct Specialty Care Building, Manchester, Nhunder construction
· $13.7M
- View specs →Demolish Upland Tanks And Associated Facilities At Defense Fuel Support Point (Dfsp) Newington, New Hampshireunder construction
· $20.1M
- View specs →B145 DCMA Office Space Renovationbidding
Newington · Not reported
- View specs →Bil Replacement Of The Hvac Sysytem 11 Murphy Drive, Nashua, Nhcompleted
· $11.5M
- View specs →Repairs To Breakwaters, Isles Of Shoals, New Hampshire And Mainecompleted
· $10.3M
- View specs →Women'S Health Clinic Construction Project At The Manchester Vamcunder construction
· $8.9M
- View specs →2Nd Floor Hvac Upgrades, Ice Engineering Facility Cold Regions Research And Engineering Laboratory, Hanover, New Hampshicompleted
· $4.8M
- View specs →Base-Wide Fire Alarm Modernization, New Hampshire Air National Guard, Pease National Guard Base, Newington, Nhcompleted
· $5.8M
- View specs →Demolish 1.25-Mile Pipeline Between Dfsp Newington And Pease Angbcompleted
· $5.9M
- View specs →Remediation Restoration At 11 Murphy Drive, Nashua Nhcompleted
· $5.1M
- View specs →Repairs To North Jetty, Hampton Harbor, Hampton, New Hampshirecompleted
· $7.0M
- View specs →Active Vehicle Barrier Replacementunder construction
· $812,001
- View specs →Fire Alarm Device Replacement Project A90 Boston Consolidated Terminal Radar Approach Control (Tracon) Facility Merrimacunder construction
· $764,632
- View specs →The Project Consists Of The Reconstruction Of Hatchery Entrance Road (Route 010), Visitor Overflow Parking (Route 900), under construction
· $716,733
- View specs →X003 Auxiliary Seawater Intake Modifications, Dd2completed
· $3.8M
- View specs →Concrete Repairs, Blackwater Dam, Webster, Nhcompleted
· $1.1M
- View specs →Gaoa Glen Ellis Day Use Area Reconstruction Projectcompleted
· $1.9M