New Hampshire · Division 09
Finishes projects in New Hampshire · page 5
Flooring, ceilings, drywall, paint, casework. Usually specified by the architect or interior designer. Counted across our 300 highest-priority scored New Hampshire projects, 223 need this division and 193 are still in planning or permitting.
As of 2026-11-03, 223 of the 300 highest-scored New Hampshire projects in the SpecIndex index need finishes, and 193 of those are still in planning or permitting.
Search the full index →Showing 201–223 of 223 · page 5 of 5
- Z2DA--Renovate 2nd Floor East Wing 608-23-001planning
Manchester
- Epoxy Floor Coating, Cold Regions Research and Engineering Laboratory, Hanover, NHdeadline not recorded
Hanover
- Merrimack Industrial / Life Sciences Pipelineplanning
Merrimack
- Mega Door Refurbishment Servicesplanning
Newington
- Market Survey: The FAA is seeking contractors that have the capabilities to design and construct stand-alone building stplanning
- Air Handler Refurbishment, Testing and Insulation
Hanover
- AWARD NOTICE - CONSTRUCTION - Multiple Projects - Londonderry, NH & Keene, NHunder construction
Londonderry
- AWARD NOTICE // USMC SECURITY CAGES INSTALLATION - LONDONDERRY, NH 03053 // 99TH RDunder construction
Londonderry
- B 254 Renovation Presolicitation
Newington
- B306 & B29 HVAC Repairs, PNSYunder construction
Portsmouth
- Bartlett Experimental Laboratory Roof Replacement
Bartlett
- Base Notice: Notice of Intent - Monaco Enterprise Fire Alarm System, PEASE NHANGBplanning
PORTSMOUTH
- Base-Wide Fire Alarm System Upgrade, PEASE NH Air National Guardplanning
PORTSMOUTH
- Building 254 Demolition & Mold Abatement- Presolicitation
Newington
- Building Operations and Maintenance Services for Norris Cotton FB, Manchester, NHplanning
Manchester
- Carpet Replacement with installationunder construction
NEWINGTON
- Cleveland FB Termporary Concrete Repairs
Concord
- Complete Replacement of Fire Alarm Systemplanning
Concord
- Construction of a Leadership Reaction Course, New Hampshire Army National Guard campus, NHplanning
CONCORD
- Data Center Chiller Maintenance
Hanover
- DEMO BOATHOUSE FLOATING DOCKunder construction
New Castle
- EMERGENCY REPAIR GENERATOR AND SWITCHGEAR AT FCI BERLINunder construction
- FY24 Emergency Replace Condensers FS Warehouseplanning
Berlin